Residential energy storage systems in Massachusetts
Which codes apply? In Massachusetts, residential energy storage systems fall under the 2026 NEC, the 2021 IRC, another model code in place of the IFC, and the 2020 NFPA 855 through the fire code.
Codes that reach residential energy storage systems
The edition Massachusetts enforces for each code that governs the product, and the part of the code that does.
-
NECNational Electrical CodeThe Massachusetts NEC record2026 NECVerified
in force since Apr 24, 2026
Where it reaches the product. Article 706, energy storage systems, with 705 for the interconnection and 710 for stand-alone operation.
Massachusetts Electrical Code (527 CMR 12.00), 2026 edition · 527 CMR 12.00
-
IRCInternational Residential CodeThe Massachusetts IRC record2021 IRCVerified
in force since Oct 11, 2024
Where it reaches the product. Section R328, stationary storage battery systems in dwellings.
Massachusetts Residential Code (780 CMR 51.00), Tenth Edition, Residential Volume · 780 CMR 51.00, s. R101.1
The 2024 IRC is in development.
-
IFCInternational Fire CodeThe Massachusetts IFC recordAnother model codeVerified
Where it reaches the product. Chapter 12, energy systems, section 1207, which also points to NFPA 855.
Massachusetts Comprehensive Fire Safety Code (527 CMR 1.00) · 527 CMR 1.00, ss. 1.04-1.05
The 2024 IFC is proposed.
-
NFPA 855NFPA 855, Standard for the Installation of Stationary Energy Storage SystemsThe Massachusetts NFPA 855 record2020 NFPA 855Verified
in force since May 12, 2023 · Through NFPA 1, chapter 52 · Edition derived from the fire code the state adopts
Where it reaches the product. Chapter 15, one- and two-family dwellings and townhouses.
Massachusetts Comprehensive Fire Safety Code (527 CMR 1.00) · 527 CMR 1.00, ss. 1.04-1.05, ch. 52; Table 1.12.8.32
Massachusetts laws that name residential energy storage systems
On the site: 20 laws, rules, orders, and bills, newest first.
| Law or rule | Kind | Stage | Date | What it does |
|---|---|---|---|---|
| 527 CMR 1.00 (2024 Edition) | Code amendment | VerifiedPending | Oct 15, 2026 | Proposes moving the state fire code to NFPA 1 (2024 edition) with Massachusetts amendments. Source (opens in a new tab) |
| 225 CMR 28.00 | Program rule | PartialIn force | Sep 11, 2026 | Pays solar incentives per kWh; systems of 25 kW AC or less get a flat $0.03 per kWh, or $0.06 for low-income customers. Source (opens in a new tab) |
| H.5175 | Bill | VerifiedPending | Jul 1, 2026 | An earlier House draft, H.5151, proposed a statewide storage incentive program and a state permitting platform for home solar and storage. Source (opens in a new tab) |
| NSTAR Electric Company d/b/a Eversource Energy | Tariff | PartialIn force | May 1, 2026 | Sets one utility's interconnection rules, including a simplified track for listed inverter systems of 25 kilowatts or less. Source (opens in a new tab) |
| 527 CMR 12.00 | Code amendment | PartialIn force | Apr 24, 2026 | Requires installations permitted after Apr 24, 2026 to meet the 2026 National Electrical Code with Massachusetts amendments. Source (opens in a new tab) |
| H.3467 | Bill | PartialDid not pass | Apr 6, 2026 | Proposes energy code rules requiring solar on new buildings, plus battery storage on new multifamily and commercial buildings up to six stories. Source (opens in a new tab) |
| H.4144 | Bill | PartialDid not pass | Apr 6, 2026 | Proposes a statewide solar incentive program set by regulation, state clean energy procurement that includes storage, and a state siting and permitting division. Source (opens in a new tab) |
| ConnectedSolutions small-scale battery program details | Program rule | PartialIn force | Mar 13, 2026 | Pays $275 per kW for behind-the-meter batteries of 50 kW or less that discharge during 30 to 60 summer peak events. Source (opens in a new tab) |
| D.P.U. 25-48 | Commission order | PartialIn force | Feb 10, 2026 | Revised the model interconnection tariff that each utility's own tariff follows. Source (opens in a new tab) |
| S.2270 | Bill | VerifiedPending | Dec 15, 2025 | Proposes requiring each electric company to run a virtual power plant program paying customer-sited distributed energy resources for peak load reduction. Source (opens in a new tab) |
| MassDEP Guidance on Electric Battery Storage and Electric Vehicle Chargers | Agency guidance | PartialIn force | Aug 20, 2025 | Summarizes existing rules, including a fire department permit above 20 kWh, or above 1 kWh at one- and two-family homes, and listing to UL 9540. It says most lithium-ion batteries are hazardous waste that can be managed as universal waste. Source (opens in a new tab) |
| D.P.U. 24-140 through D.P.U. 24-149 | Commission order | PartialIn force | Feb 28, 2025 | Approves, with modifications, the 2025 to 2027 efficiency plans, including an improved demand response program that controls customer batteries and thermostats during system peaks. Source (opens in a new tab) |
| 220 CMR 18.00 | Rule | PartialIn force | Dec 20, 2024 | Requires utilities to credit net metering facilities; Class I runs to 60 kW, and Class I systems of 25 kW or less are cap exempt. Source (opens in a new tab) |
| 780 CMR | Code amendment | PartialIn force | Oct 11, 2024 | Requires building construction to meet the 2021 International Codes with Massachusetts amendments. Source (opens in a new tab) |
| 780 CMR 51.00 | Code amendment | PartialIn force | Oct 11, 2024 | Requires home energy storage to get building permits and inspections, follow the state electrical code, and have smoke and carbon monoxide alarms. Source (opens in a new tab) |
| State Fire Marshal memo to building inspectors and fire prevention officers | Agency guidance | PartialIn force | Mar 1, 2023 | Says storage installations permitted on or after Dec 9, 2022 must meet the prescriptive rules of the latest edition of 527 CMR 1.00. It ends the Jun 7, 2021 alternatives for one- and two-family homes. Source (opens in a new tab) |
| TSRG Common Technical Standards Manual | Agency guidance | PartialIn force | Dec 22, 2022 | Lists utility technical requirements for connecting inverters and storage, such as inverters Listed to UL 1741 and IEEE 1547 trip functions. Source (opens in a new tab) |
| 527 CMR 1.00 (2021 edition) | Code amendment | PartialIn force | Dec 9, 2022 | Adopts NFPA 1 (2021 edition) with Massachusetts amendments as the state fire code. Source (opens in a new tab) |
| St. 2022, c. 179, § 72 | Statute | PartialIn force | Aug 11, 2022 | Under this section, each utility filed a tariff setting operating limits for energy storage connected to its grid. Source (opens in a new tab) |
| St. 2022, c. 179, §§ 13 and 24 | Statute | PartialIn force | Aug 11, 2022 | Allows clean energy matching grants, including for energy storage technologies, to go to municipal colleges and public schools. Source (opens in a new tab) |
Every Massachusetts law on residential energy storage systems, with filters
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use