D.P.U. 25-48
Partial
What does Massachusetts D.P.U. 25-48 do? Revised the model interconnection tariff that each utility's own tariff follows. As proposed, it raised the Simplified Process limit from 15 kW to 25 kW and opened faster review paths to storage.
Facts
- Kind
- Commission order
- Status
- Adopted
- Stage
- In force
- Signed or decided
- February 10, 2026
- Topics
- Interconnection
- Products
- Source
- Massachusetts Department of Public Utilities (opens in a new tab)
The state’s codes
The codes that reach each product this law names, with the edition Massachusetts is on. Each links to the record.
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use