Codes of Record

Massachusetts

527 CMR 12.00

PartialRead in the state’s own source. It stays partial until the passage is on file word for word.

What does Massachusetts 527 CMR 12.00 do? Requires installations permitted after Apr 24, 2026 to meet the 2026 National Electrical Code with Massachusetts amendments. It changes solar photovoltaic warning label rules, deletes Article 691, and requires outdoor service disconnects at one- and two-family homes.

Facts

Kind
Code amendment
Status
In force
Stage
In force
Signed or decided
April 24, 2026
Effective
April 24, 2026
Topics
Fire protection and siting, Permitting
Products
Source
Board of Fire Prevention Regulations, Department of Fire Services (opens in a new tab)
Citation
527 CMR 12.00 (Massachusetts Electrical Code, based on the 2026 NEC)

For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use