527 CMR 12.00
Partial
What does Massachusetts 527 CMR 12.00 do? Requires installations permitted after Apr 24, 2026 to meet the 2026 National Electrical Code with Massachusetts amendments. It changes solar photovoltaic warning label rules, deletes Article 691, and requires outdoor service disconnects at one- and two-family homes.
Facts
- Kind
- Code amendment
- Status
- In force
- Stage
- In force
- Signed or decided
- April 24, 2026
- Effective
- April 24, 2026
- Topics
- Fire protection and siting, Permitting
- Products
- Source
- Board of Fire Prevention Regulations, Department of Fire Services (opens in a new tab)
- Citation
- 527 CMR 12.00 (Massachusetts Electrical Code, based on the 2026 NEC)
The state’s codes
The codes that reach each product this law names, with the edition Massachusetts is on. Each links to the record.
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use