220 CMR 18.00
Partial
What does Massachusetts 220 CMR 18.00 do? Requires utilities to credit net metering facilities; Class I runs to 60 kW, and Class I systems of 25 kW or less are cap exempt. Requires that energy storage systems not count as on-site load when qualifying for cap exemptions.
Facts
- Kind
- Rule
- Status
- In force
- Stage
- In force
- Signed or decided
- December 20, 2024
- Effective
- December 20, 2024
- Topics
- Tariffs and bill credits
- Products
- Source
- Massachusetts Department of Public Utilities (opens in a new tab)
- Citation
- 220 CMR 18.00 net metering regulation
The state’s codes
The codes that reach each product this law names, with the edition Massachusetts is on. Each links to the record.
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use