Laws by state and product
Bills, rules, orders, and tariffs that name a product, in 49 states. Pick a state, a product, or one cell. The list below shows only what you picked.
Where the laws are
The figure counts laws and rules in force. A small +N counts bills pending and rules not yet in force. Batteries are researched by topic in ten states, the other products in every state.
| State | Residential ESS | Commercial and utility ESS | Solar PV | Inverters | Interconnect devices | Plug-in solar | EV charging | All |
|---|---|---|---|---|---|---|---|---|
| Alabama | Residential energy storage systems in Alabama: none | Commercial and utility energy storage systems in Alabama: none | Solar PV in Alabama: none | Inverters and power control in Alabama: none | Interconnection devices in Alabama: none | Plug-in solar in Alabama: none | 1 1 in force | 1 1 in force |
| Arizona | 8 8 in force | 4 4 in force | 5 5 in force | 3 3 in force | 2 2 in force | Plug-in solar in Arizona: none | 1 1 in force | 11 11 in force |
| Arkansas | Residential energy storage systems in Arkansas: none | Commercial and utility energy storage systems in Arkansas: none | Solar PV in Arkansas: none | Inverters and power control in Arkansas: none | Interconnection devices in Arkansas: none | Plug-in solar in Arkansas: none | 1 1 in force | 1 1 in force |
| California | 16+2 16 in force, 2 pending | 17+3 17 in force, 3 pending | 9+1 9 in force, 1 pending | 1 1 in force | 5+1 5 in force, 1 pending | +1 0 in force, 1 pending | 6 6 in force | 32+4 32 in force, 4 pending |
| Colorado | Residential energy storage systems in Colorado: none | Commercial and utility energy storage systems in Colorado: none | Solar PV in Colorado: none | Inverters and power control in Colorado: none | Interconnection devices in Colorado: none | 1 1 in force | 5 5 in force | 6 6 in force |
| Connecticut | Residential energy storage systems in Connecticut: none | Commercial and utility energy storage systems in Connecticut: none | Solar PV in Connecticut: none | Inverters and power control in Connecticut: none | Interconnection devices in Connecticut: none | 1 1 in force | 4 4 in force | 5 5 in force |
| Delaware | Residential energy storage systems in Delaware: none | Commercial and utility energy storage systems in Delaware: none | Solar PV in Delaware: none | Inverters and power control in Delaware: none | Interconnection devices in Delaware: none | +1 0 in force, 1 pending | 2 2 in force | 2+1 2 in force, 1 pending |
| District of Columbia | Residential energy storage systems in District of Columbia: none | Commercial and utility energy storage systems in District of Columbia: none | Solar PV in District of Columbia: none | Inverters and power control in District of Columbia: none | Interconnection devices in District of Columbia: none | +1 0 in force, 1 pending | 3+1 3 in force, 1 pending | 3+2 3 in force, 2 pending |
| Florida | 7+2 7 in force, 2 pending | 9+2 9 in force, 2 pending | 6 6 in force | 2 2 in force | Interconnection devices in Florida: none | Plug-in solar in Florida: none | 2 2 in force | 11+2 11 in force, 2 pending |
| Georgia | Residential energy storage systems in Georgia: none | Commercial and utility energy storage systems in Georgia: none | Solar PV in Georgia: none | Inverters and power control in Georgia: none | Interconnection devices in Georgia: none | +1 0 in force, 1 pending | +1 0 in force, 1 pending | +2 0 in force, 2 pending |
| Idaho | Residential energy storage systems in Idaho: none | Commercial and utility energy storage systems in Idaho: none | Solar PV in Idaho: none | Inverters and power control in Idaho: none | Interconnection devices in Idaho: none | +1 0 in force, 1 pending | 1 1 in force | 1+1 1 in force, 1 pending |
| Illinois | Residential energy storage systems in Illinois: none | Commercial and utility energy storage systems in Illinois: none | Solar PV in Illinois: none | Inverters and power control in Illinois: none | Interconnection devices in Illinois: none | +1 0 in force, 1 pending | 4 4 in force | 4+1 4 in force, 1 pending |
| Indiana | Residential energy storage systems in Indiana: none | Commercial and utility energy storage systems in Indiana: none | Solar PV in Indiana: none | Inverters and power control in Indiana: none | Interconnection devices in Indiana: none | +1 0 in force, 1 pending | 1 1 in force | 1+1 1 in force, 1 pending |
| Iowa | Residential energy storage systems in Iowa: none | Commercial and utility energy storage systems in Iowa: none | Solar PV in Iowa: none | Inverters and power control in Iowa: none | Interconnection devices in Iowa: none | +1 0 in force, 1 pending | 2 2 in force | 2+1 2 in force, 1 pending |
| Kansas | Residential energy storage systems in Kansas: none | Commercial and utility energy storage systems in Kansas: none | Solar PV in Kansas: none | Inverters and power control in Kansas: none | Interconnection devices in Kansas: none | Plug-in solar in Kansas: none | 1 1 in force | 1 1 in force |
| Kentucky | Residential energy storage systems in Kentucky: none | Commercial and utility energy storage systems in Kentucky: none | Solar PV in Kentucky: none | Inverters and power control in Kentucky: none | Interconnection devices in Kentucky: none | Plug-in solar in Kentucky: none | 1 1 in force | 1 1 in force |
| Louisiana | Residential energy storage systems in Louisiana: none | Commercial and utility energy storage systems in Louisiana: none | Solar PV in Louisiana: none | Inverters and power control in Louisiana: none | Interconnection devices in Louisiana: none | Plug-in solar in Louisiana: none | 3 3 in force | 3 3 in force |
| Maine | Residential energy storage systems in Maine: none | Commercial and utility energy storage systems in Maine: none | Solar PV in Maine: none | Inverters and power control in Maine: none | Interconnection devices in Maine: none | 1 1 in force | 3 3 in force | 4 4 in force |
| Maryland | Residential energy storage systems in Maryland: none | Commercial and utility energy storage systems in Maryland: none | Solar PV in Maryland: none | Inverters and power control in Maryland: none | Interconnection devices in Maryland: none | 1 1 in force | 5 5 in force | 6 6 in force |
| Massachusetts | 15+3 15 in force, 3 pending | 18+5 18 in force, 5 pending | 8+2 8 in force, 2 pending | 2 2 in force | 2+1 2 in force, 1 pending | +1 0 in force, 1 pending | 6 6 in force | 29+7 29 in force, 7 pending |
| Michigan | Residential energy storage systems in Michigan: none | Commercial and utility energy storage systems in Michigan: none | Solar PV in Michigan: none | Inverters and power control in Michigan: none | Interconnection devices in Michigan: none | +1 0 in force, 1 pending | 2 2 in force | 2+1 2 in force, 1 pending |
| Minnesota | Residential energy storage systems in Minnesota: none | Commercial and utility energy storage systems in Minnesota: none | Solar PV in Minnesota: none | Inverters and power control in Minnesota: none | Interconnection devices in Minnesota: none | +1 0 in force, 1 pending | 2+3 2 in force, 3 pending | 2+4 2 in force, 4 pending |
| Mississippi | Residential energy storage systems in Mississippi: none | Commercial and utility energy storage systems in Mississippi: none | Solar PV in Mississippi: none | Inverters and power control in Mississippi: none | Interconnection devices in Mississippi: none | Plug-in solar in Mississippi: none | 2 2 in force | 2 2 in force |
| Missouri | Residential energy storage systems in Missouri: none | Commercial and utility energy storage systems in Missouri: none | Solar PV in Missouri: none | Inverters and power control in Missouri: none | Interconnection devices in Missouri: none | +1 0 in force, 1 pending | 2 2 in force | 2+1 2 in force, 1 pending |
| Montana | Residential energy storage systems in Montana: none | Commercial and utility energy storage systems in Montana: none | Solar PV in Montana: none | Inverters and power control in Montana: none | Interconnection devices in Montana: none | Plug-in solar in Montana: none | 2 2 in force | 2 2 in force |
| Nebraska | Residential energy storage systems in Nebraska: none | Commercial and utility energy storage systems in Nebraska: none | Solar PV in Nebraska: none | Inverters and power control in Nebraska: none | Interconnection devices in Nebraska: none | Plug-in solar in Nebraska: none | 1+1 1 in force, 1 pending | 1+1 1 in force, 1 pending |
| Nevada | Residential energy storage systems in Nevada: none | Commercial and utility energy storage systems in Nevada: none | Solar PV in Nevada: none | Inverters and power control in Nevada: none | Interconnection devices in Nevada: none | Plug-in solar in Nevada: none | 2+1 2 in force, 1 pending | 2+1 2 in force, 1 pending |
| New Hampshire | Residential energy storage systems in New Hampshire: none | Commercial and utility energy storage systems in New Hampshire: none | Solar PV in New Hampshire: none | Inverters and power control in New Hampshire: none | Interconnection devices in New Hampshire: none | 1 1 in force | 3 3 in force | 4 4 in force |
| New Jersey | Residential energy storage systems in New Jersey: none | Commercial and utility energy storage systems in New Jersey: none | Solar PV in New Jersey: none | Inverters and power control in New Jersey: none | Interconnection devices in New Jersey: none | 1 1 in force | 5 5 in force | 6 6 in force |
| New Mexico | Residential energy storage systems in New Mexico: none | Commercial and utility energy storage systems in New Mexico: none | Solar PV in New Mexico: none | Inverters and power control in New Mexico: none | Interconnection devices in New Mexico: none | Plug-in solar in New Mexico: none | 2 2 in force | 2 2 in force |
| New York | 10+5 10 in force, 5 pending | 13+12 13 in force, 12 pending | 1+3 1 in force, 3 pending | 1 1 in force | 1+1 1 in force, 1 pending | +1 0 in force, 1 pending | 5+1 5 in force, 1 pending | 19+17 19 in force, 17 pending |
| North Carolina | Residential energy storage systems in North Carolina: none | Commercial and utility energy storage systems in North Carolina: none | Solar PV in North Carolina: none | Inverters and power control in North Carolina: none | Interconnection devices in North Carolina: none | Plug-in solar in North Carolina: none | 3 3 in force | 3 3 in force |
| North Dakota | Residential energy storage systems in North Dakota: none | Commercial and utility energy storage systems in North Dakota: none | Solar PV in North Dakota: none | Inverters and power control in North Dakota: none | Interconnection devices in North Dakota: none | Plug-in solar in North Dakota: none | 1 1 in force | 1 1 in force |
| Ohio | Residential energy storage systems in Ohio: none | Commercial and utility energy storage systems in Ohio: none | Solar PV in Ohio: none | Inverters and power control in Ohio: none | Interconnection devices in Ohio: none | +1 0 in force, 1 pending | 1 1 in force | 1+1 1 in force, 1 pending |
| Oklahoma | Residential energy storage systems in Oklahoma: none | Commercial and utility energy storage systems in Oklahoma: none | Solar PV in Oklahoma: none | Inverters and power control in Oklahoma: none | Interconnection devices in Oklahoma: none | Plug-in solar in Oklahoma: none | 4 4 in force | 4 4 in force |
| Oregon | 11+2 11 in force, 2 pending | 10+3 10 in force, 3 pending | 5 5 in force | 4 4 in force | 7+1 7 in force, 1 pending | +1 0 in force, 1 pending | 3 3 in force | 18+4 18 in force, 4 pending |
| Pennsylvania | 3+3 3 in force, 3 pending | 2+3 2 in force, 3 pending | 2 2 in force | 1 1 in force | 1+1 1 in force, 1 pending | Plug-in solar in Pennsylvania: none | 1 1 in force | 5+4 5 in force, 4 pending |
| Rhode Island | Residential energy storage systems in Rhode Island: none | Commercial and utility energy storage systems in Rhode Island: none | Solar PV in Rhode Island: none | Inverters and power control in Rhode Island: none | Interconnection devices in Rhode Island: none | +1 0 in force, 1 pending | 4 4 in force | 4+1 4 in force, 1 pending |
| South Carolina | Residential energy storage systems in South Carolina: none | Commercial and utility energy storage systems in South Carolina: none | Solar PV in South Carolina: none | Inverters and power control in South Carolina: none | Interconnection devices in South Carolina: none | Plug-in solar in South Carolina: none | 1+1 1 in force, 1 pending | 1+1 1 in force, 1 pending |
| South Dakota | Residential energy storage systems in South Dakota: none | Commercial and utility energy storage systems in South Dakota: none | Solar PV in South Dakota: none | Inverters and power control in South Dakota: none | Interconnection devices in South Dakota: none | Plug-in solar in South Dakota: none | 1 1 in force | 1 1 in force |
| Tennessee | Residential energy storage systems in Tennessee: none | Commercial and utility energy storage systems in Tennessee: none | Solar PV in Tennessee: none | Inverters and power control in Tennessee: none | Interconnection devices in Tennessee: none | Plug-in solar in Tennessee: none | 1 1 in force | 1 1 in force |
| Texas | 9+1 9 in force, 1 pending | 14+2 14 in force, 2 pending | 4 4 in force | 2+1 2 in force, 1 pending | 1+1 1 in force, 1 pending | Plug-in solar in Texas: none | 2 2 in force | 20+2 20 in force, 2 pending |
| Utah | Residential energy storage systems in Utah: none | Commercial and utility energy storage systems in Utah: none | Solar PV in Utah: none | Inverters and power control in Utah: none | Interconnection devices in Utah: none | 1 1 in force | 1 1 in force | 2 2 in force |
| Vermont | Residential energy storage systems in Vermont: none | Commercial and utility energy storage systems in Vermont: none | Solar PV in Vermont: none | Inverters and power control in Vermont: none | Interconnection devices in Vermont: none | 1 1 in force | 1+2 1 in force, 2 pending | 2+2 2 in force, 2 pending |
| Virginia | Residential energy storage systems in Virginia: none | Commercial and utility energy storage systems in Virginia: none | Solar PV in Virginia: none | Inverters and power control in Virginia: none | Interconnection devices in Virginia: none | 1 1 in force | 2 2 in force | 3 3 in force |
| Washington | 9+1 9 in force, 1 pending | 7+2 7 in force, 2 pending | 3+1 3 in force, 1 pending | Inverters and power control in Washington: none | 2 2 in force | Plug-in solar in Washington: none | 1 1 in force | 13+2 13 in force, 2 pending |
| West Virginia | Residential energy storage systems in West Virginia: none | Commercial and utility energy storage systems in West Virginia: none | Solar PV in West Virginia: none | Inverters and power control in West Virginia: none | Interconnection devices in West Virginia: none | Plug-in solar in West Virginia: none | 1 1 in force | 1 1 in force |
| Wisconsin | 2 2 in force | 6+1 6 in force, 1 pending | 2 2 in force | 1 1 in force | Interconnection devices in Wisconsin: none | Plug-in solar in Wisconsin: none | 3 3 in force | 9+1 9 in force, 1 pending |
| Wyoming | Residential energy storage systems in Wyoming: none | Commercial and utility energy storage systems in Wyoming: none | Solar PV in Wyoming: none | Inverters and power control in Wyoming: none | Interconnection devices in Wyoming: none | Plug-in solar in Wyoming: none | 1 1 in force | 1 1 in force |
| All 49 states | 90+19 90 in force, 19 pending | 100+33 100 in force, 33 pending | 45+7 45 in force, 7 pending | 17+1 17 in force, 1 pending | 21+6 21 in force, 6 pending | 9+16 9 in force, 16 pending | 112+11 112 in force, 11 pending | 258+65 258 in force, 65 pending |
Laws, rules, and bills
Partial Every entry was read in the source it links. It stays partial until the passage is on file word for word.
Pick a state or a product above.
Nothing is listed until you pick. Choose a state or a product in the grid, or use the filters. The address then carries your choice, so the page can be sent as a link.
- AlabamaCommission orderLead only
Alabama PSC Docket 32694 (charging stations not public utilities)
An entity that owns, operates, leases or controls EV charging stations is not defined as a public utility. public chargers.
Source: afdc.energy.gov (opens in a new tab)
Enacted Jun 22, 2018.
In force - ArizonaBillPartial
SB 1419
Requires residential solar contracts to disclose costs, savings assumptions, and warranties, including inverter and battery warranties. Lease payments cannot start before the utility grants permission to operate. Contractors must evaluate the roof before installation and meet the registrar's training standards.
Source: Arizona State Legislature Laws 2026, Chapter 175 (opens in a new tab)
Signed into law Jun 19, 2026. In force from Sep 12, 2026.
In force - ArizonaRulePartial
A.A.C. R4-36-201
Adopts the 2024 International Fire Code, with state amendments, as the State Fire Code. Its energy systems chapter covers battery storage and solar where the State Fire Code applies.
Source: Arizona Secretary of State Arizona Administrative Code, Title 4, Chapter 36 (opens in a new tab)
In force from Apr 13, 2026.
In force - ArizonaLocal ordinancePartial
Chino Valley Ordinance 2025-956
Allows rooftop solar on homes and parking structures, and battery storage at homes and businesses only when stored energy is used on site. Uses not listed as permitted in a zoning district are not allowed.
Source: Town of Chino Valley Ordinance No. 2025-956 (opens in a new tab)
Adopted Sep 23, 2025.
In force - ArizonaCommission orderPartial
Arizona Public Service battery pilot
Approves an Arizona Public Service pilot that pays up to 5,000 home battery owners $110 per kW a year for up to 60 grid events. Events run from 4 to 10 in the evening, May through October.
Source: Arizona Corporation Commission News release, Mar 13, 2025 (opens in a new tab)
Adopted Mar 12, 2025.
In force - ArizonaRulePartial
A.A.C. R4-9-102
Defines commercial contractor license classes; electrical work under 600 volts falls under C-11, and no class covers solar electric or battery work specifically. Classes that name solar cover plumbing, water heating, cooling, pool, and boiler work.
Source: Arizona Secretary of State Arizona Administrative Code, Title 4, Chapter 9 (opens in a new tab)
In force from Nov 5, 2017.
In force - ArizonaStatutePartial
A.R.S. 11-254.07
Lets county boards of supervisors create renewable energy incentive districts for utility-scale renewable and storage equipment. District plans may offer faster zoning and permits, and waivers of fees or standards.
Source: Arizona State Legislature Arizona Revised Statutes (opens in a new tab)
In force - ArizonaStatuteLead only
A.R.S. 28-876 (EV parking space enforcement)
Only electric vehicles with alternative fuel plate or sticker may park in designated EV charging spaces; civil penalty of at least $350. public chargers.
In force - ArizonaStatutePartial
A.R.S. 42-14155
Requires the Department of Revenue to value utility-scale renewable and storage equipment at 20 percent of depreciated cost for property tax through Dec 31, 2040. Stand-alone and colocated storage both qualify.
Source: Arizona State Legislature Arizona Revised Statutes (opens in a new tab)
In force - ArizonaStatutePartial
A.R.S. 44-1763
Requires sale and lease agreements for distributed energy generation systems to disclose major components, such as batteries, and their warranties. They must also disclose total costs, maintenance, and savings assumptions. Buyers may rescind within three business days, and lease payments cannot start before the utility grants permission to operate.
Source: Arizona State Legislature Arizona Revised Statutes (opens in a new tab)
In force - ArizonaProgram rulePartial
Salt River Project requirements
Requires battery systems in Salt River Project's residential program to be Listed to UL 9540, with inverters that meet UL 1741 and IEEE 1547. Customers must take a customer generation price plan and sign an interconnection agreement.
Source: Salt River Project Residential Distributed Energy Resource Program Requirements (opens in a new tab)
In force - ArizonaProgram rulePartial
Tucson Electric Power interconnection
Requires utility approval before construction and permission to operate before a home solar or storage system is energized. Inverters must meet IEEE 1547 and be Listed to UL 1741, and storage follows the utility's SR-710 requirements. Applications filed before Oct 1 each year lock in the Resource Comparison Proxy export rate then in effect.
Source: Tucson Electric Power Residential interconnection (opens in a new tab)
In force - ArizonaBillPartial
HB 2134
Would have barred utilities and public bodies from connecting certain equipment from Chinese companies to critical infrastructure. The Corporation Commission would have listed the barred equipment, including solar inverters and battery technology.
Source: Arizona State Senate Senate fact sheet (opens in a new tab)
Did not passVetoed - ArizonaBillPartial
HB 2781
Would have required solar power plant owners to file decommissioning plans and keep financial assurance. Owners would have had to remove equipment, including battery storage, after a year out of operation. Cities and counties could have set zoning and permit rules for these plants.
Source: Arizona State Legislature Introduced bill text (opens in a new tab)
Did not pass - ArizonaBillPartial
HB 2918
Would have valued utility renewable and storage equipment placed in service after Dec 31, 2026 at full depreciated cost for property tax. Equipment placed in service earlier would have kept the 20 percent valuation.
Source: Arizona State Legislature Introduced bill text (opens in a new tab)
Did not pass - ArizonaBillLead only
SB 1606 plug-in solar
Plug-in solar bill; tracker says deferred to 2027, news says it died in committee after utility grid-safety objections.
Did not pass - ArkansasCommission orderLead only
Arkansas PSC Docket 22-026-TF Order 8 (utility EV charging deployment)
Investor-owned utilities may own public DC fast chargers; must let site hosts install meters to measure electricity sold, use pre-qualified vendors, and file annual reports. public chargers.
In force - CaliforniaBillPartial
AB 2493
Covers utility interconnection and a transmission development monitor at the Public Utilities Commission.
Source: Office of the Governor of California Legislative update dated Sep 30, 2026 (opens in a new tab)
Signed into law Sep 30, 2026.
In force - CaliforniaBillPartial
SB 913
Covers resource adequacy for aggregated distributed energy resources.
Source: Office of the Governor of California Legislative update dated Sep 30, 2026 (opens in a new tab)
Signed into law Sep 30, 2026.
In force - CaliforniaProgram rulePartial
CEC Demand Side Grid Support Program Guidelines
Pays customers who cut net load during extreme grid events. Option 3 covers behind-the-meter batteries run together as a virtual power plant. The Energy Commission approved this edition on Apr 27, 2026.
Source: California Energy Commission Docket entry for the guidelines (opens in a new tab)
Adopted Apr 27, 2026.
In force - CaliforniaRulePartial
SMUD Engineering Specification T014
Allows only utility-approved meter socket adapters, on single-meter residential services of 200 amps or less, with exports capped at 20 kW. Requires a production meter for all distributed generation and sets approved solar and battery connection options.
Source: Sacramento Municipal Utility District SMUD Engineering Specification T014, Revision 7, dated Feb 19, 2026 (opens in a new tab)
In force as of Feb 19, 2026.
In force - CaliforniaCode amendmentPartial
2025 California Electrical Code
Sets the statewide electrical code, with California amendments, effective Jan 1, 2026.
Source: California Building Standards Commission Title 24 codes page (opens in a new tab)
In force from Jan 1, 2026.
In force - CaliforniaCode amendmentPartial
2025 California Energy Code
Requires solar on new single-family, multifamily, and nonresidential buildings. Requires battery storage on new high-rise multifamily and nonresidential buildings that must install solar.
Source: California Energy Commission Business Meeting backup packet, Jun 11, 2025, Docket 25-BSTD-02 (opens in a new tab)
In force from Jan 1, 2026.
In force - CaliforniaCode amendmentPartial
2025 California Fire Code
Applies State Fire Marshal changes to Chapters 3, 12, and 80 of the California Fire Code to battery facilities from Jan 1, 2026. The changes were adopted Mar 7, 2025 and draw on the 2023 edition of NFPA 855.
Source: California Governor's Office of Business and Economic Development State Battery Storage Safety Collaborative page (opens in a new tab)
In force from Jan 1, 2026.
In force - CaliforniaCode amendmentPartial
2025 California Residential Code
Sets the statewide residential building code effective Jan 1, 2026.
Source: California Building Standards Commission Title 24 codes page (opens in a new tab)
In force from Jan 1, 2026.
In force - CaliforniaBillPartial
AB 1285
Covers State Fire Marshal guidance for lithium-ion battery facilities (Chapter 637, Statutes of 2025).
Source: California Governor's Office of Emergency Services Final disposition of 2025 bills (opens in a new tab)
Signed into law Oct 11, 2025. In force from Jan 1, 2026.
In force - CaliforniaBillPartial
SB 283
Requires battery storage developers to consult local fire authorities before applying and to pass a local fire safety inspection before operating. Owners pay inspection costs, and the state must review facility configurations.
Source: California State Senate, Office of Senator Laird Press release dated Oct 8, 2025 (opens in a new tab)
Signed into law Oct 6, 2025. In force from Jan 1, 2026.
In force - CaliforniaCommission orderPartial
CPUC Decision D.25-12-003
Closes ratepayer-funded self-generation incentives to new applications after Dec 30, 2025 and returns unallocated funds to ratepayers. State-funded incentives stay open to Jun 30, 2028, and low-income residential customers need not join demand response.
Source: California Public Utilities Commission CPUC Decision D.25-12-003 (R.20-05-012) (opens in a new tab)
Adopted Dec 4, 2025.
In force - CaliforniaBillPartial
SB 710
Keeps the property tax exclusion for active solar energy systems built before Jan 1, 2027 until the property changes ownership.
Source: Office of the Governor of California Legislative update dated Oct 3, 2025 (opens in a new tab)
Signed into law Oct 3, 2025.
In force - CaliforniaCommission orderPartial
CPUC Resolution E-5364
Sets the bill savings estimate in the Contractors State License Board's Solar Energy System Disclosure Document to the 12 months after installation. From Nov 1, 2025, the state's investor-owned utilities collect the updated document with residential interconnection applications.
Source: California Public Utilities Commission CPUC Resolution E-5364 (Energy Division own motion; Agenda ID 23299) (opens in a new tab)
In force from Mar 13, 2025.
In force - CaliforniaCommission orderPartial
CPUC Resolution ESRB-13
Requires energy storage owners to meet maintenance, operation, logbook, emergency planning, and incident reporting standards under General Order 167-C. Full requirements apply at 50 MW and above, and customer-sited storage is excluded.
Source: California Public Utilities Commission CPUC Resolution ESRB-13 (General Order 167-C) (opens in a new tab)
In force from Mar 13, 2025.
In force - CaliforniaStatuteLead only
H&S Code 44268 and 44268.2 (open access and payment standards)
Public chargers: no membership or subscription required, price disclosed at point of sale, contactless/phone payment, OCPP billing, data reporting; DC fast chargers must support Plug and Charge. public chargers.
Source: afdc.energy.gov (opens in a new tab)
In force as of Sep 27, 2024.
In force - CaliforniaStatuteLead only
Gov. Code 65850.7 and 65850.71 (expedited EV charger permitting)
Cities and counties must adopt streamlined permitting for chargers with deemed approval; deadlines Sept 30 2025 for jurisdictions over 250,000 population and Sept 30 2028 for smaller ones. residential, commercial, public chargers.
Source: afdc.energy.gov (opens in a new tab)
In force as of Sep 25, 2024.
In force - CaliforniaProgram rulePartial
Distributed Electricity Backup Assets Program Guidelines
Funds incentives for cleaner and more efficient distributed energy assets that provide on-call emergency supply or load reduction during extreme events.
Source: California Energy Commission Distributed Electricity Backup Assets Program Guidelines, First Edition (CEC-300-2023-005), under AB 205 (2022) (opens in a new tab)
Adopted Oct 18, 2023.
In force - CaliforniaCode amendmentLead only
CALGreen (Title 24 Part 11) EV charger building standards; H&S Code 18941.10, 18941.11, 18941.17
New single-family and townhomes need conduit for Level 2; new multifamily and hotels need 40% of spaces EV-capable and 10% with Level 2 chargers; public lots have tiered EV-capable and installed-charger minimums plus accessibility counts. residential, multifamily, commercial.
Source: afdc.energy.gov (opens in a new tab)
In force as of Sep 16, 2022.
In force - CaliforniaProgram rulePartial
CPUC Emergency Load Reduction Program
Funds payments of $2 per kWh for nonresidential load reduction during grid emergencies, through 2027. Battery aggregators and exporting solar-plus-storage customers may take part.
Source: California Public Utilities Commission CPUC Emergency Load Reduction Program (pilot), most recently updated by D.23-12-005 (opens in a new tab)
In force from May 1, 2021.
In force - CaliforniaTariffPartial
Electric Rule 21 Section Hh
Requires inverters on interconnecting distributed resources to perform seven autonomous functions from Sep 8, 2017. Later phases added communication and advanced functions under Rule 21 Section Hh.
Source: California Public Utilities Commission Electric Rule 21 Section Hh (smart inverter requirements); CPUC D.14-12-035 (opens in a new tab)
In force from Sep 8, 2017.
In force - CaliforniaRulePartial
16 CCR Secs. 810, 832.10, and 832.46
Allows electrical contractors to install battery storage systems. Solar contractors may install storage only as part of a solar installation and only up to 80 kWh.
Source: Contractors State License Board Order of Adoption (opens in a new tab)
In forceAdopted - CaliforniaRulePartial
22 CCR Sec. 66261.9 and Div. 4.5, Ch. 23
Allows solar modules, and batteries that are hazardous waste, to be managed as universal waste under simpler handling rules. Generators must send them to a handler, a transporter, or an authorized foreign destination.
Source: Department of Toxic Substances Control 22 CCR Sec. 66261.9 and Title 22, Division 4.5, Chapter 23 (universal waste); authority Health and Safety Code Sec. 25259 (SB 489, Chapter 419, Statutes of 2015) (opens in a new tab)
In force - CaliforniaBillPartial
AB 1104
Allows net-metered solar and paired storage projects to keep tariff eligibility after a contractor's wage violation once workers are repaid and penalties paid. It also narrows public works rules for these projects while keeping prevailing wage.
Source: California State Senate, Committee on Energy, Utilities and Communications Analysis of May 5, 2025 version, hearing Jul 7, 2025 (opens in a new tab)
In forceSigned into law - CaliforniaBillPartial
AB 130
Enacts a six-year moratorium on new state and local building standards affecting residential units, and limits code proposals in intervening cycles.
Source: California Building Standards Commission Information Bulletin 25-05, dated Nov 26, 2025 (opens in a new tab)
In forceSigned into law - CaliforniaStatutePartial
AB 205
Allows storage projects of 200 MWh or more to seek state energy commission certification in lieu of local permits. The commission must decide within 270 days of a complete application.
Source: California Energy Commission AB 205 (Ting), Chapter 61, Statutes of 2022; Pub. Res. Code Sec. 25545.1; 20 CCR Sec. 1882 (opens in a new tab)
In force - CaliforniaRulePartial
CEC EV charger reliability and data standards regulations (AB 2061)
97 percent uptime for publicly funded DC fast chargers installed on or after 2024-01-01; networked chargers installed on or after 2026-09-28 must use OCPP 2.0.1. Excludes single-family homes and multifamily under four units. public chargers.
Source: energy.ca.gov (opens in a new tab)
“Chargers must meet a 97 percent uptime standard, with certain exclusions.”
In force - CaliforniaStatutePartial
Civ. Code 1947.6 (tenant EV charging)
Tenants may request a charging station at their parking space; landlord must approve a reasonable request but need not provide a space. Weaker than owner protections. multifamily, rental.
In force - CaliforniaStatutePartial
Civ. Code 4745 (HOA/common interest right to charge)
Associations may not prohibit or unreasonably restrict an owner from installing an EV charging station in the owner's parking space or common area; owner pays cost and insurance. multifamily, condo and HOA owners.
In force - CaliforniaTariffPartial
Electric Rule 21
Requires customers installing generation or storage on their premises to meet the large utilities' interconnection, operating, and metering requirements. It covers all net metering and non-export facilities.
Source: California Public Utilities Commission Electric Rule 21 (PG&E, SCE, and SDG&E tariffs) (opens in a new tab)
In force - CaliforniaStatutePartial
SB 1383
Requires energy storage systems, including third-party-owned systems, to meet the commission's operation and maintenance standards, and expands commission audits and inspections of storage facilities.
Source: California State Senate, Committee on Energy, Utilities and Communications SB 283 analysis, existing law section (opens in a new tab)
In force - CaliforniaStatutePartial
SB 379
Requires cities and counties to offer online, automated permitting for residential solar and solar-plus-storage systems and to report permit data annually. Duties depend on population, and some jurisdictions are exempt.
Source: California Energy Commission SB 379 (Wiener), Chapter 356, Statutes of 2022 (opens in a new tab)
In force - CaliforniaStatutePartial
SB 38
Requires each battery energy storage facility in the state to have an emergency response plan and an emergency action plan covering its premises.
Source: California State Senate, Committee on Energy, Utilities and Communications Analysis of Mar 22, 2023 version (opens in a new tab)
In force - CaliforniaStatuteLead only
SB 868 Plug Into the Sun Act (Plug and Play Solar Act)
Lets a dwelling use plug-in solar devices without utility interconnection approval, fees or permission. Up to 1,200 W total AC per dwelling; UL or equivalent certification; interconnection exemption sunsets 2030 per news.
Source: pv-magazine.com (opens in a new tab)
Enacted Sep 30, 2026. Takes effect Jan 1, 2027.
Not yet in force - CaliforniaCommission orderPartial
CPUC Rulemaking R.25-08-004
Studies refinements to Rule 21 interconnection rules for distributed energy resources at the large and small utilities. No new rule is shown yet.
Source: California Public Utilities Commission CPUC Rulemaking R.25-08-004 (opens in a new tab)
Under review since Aug 20, 2025.
Pending - CaliforniaCode amendmentPartial
2028 Energy Code rulemaking
Studies updates to the Energy Code, which sets solar and battery requirements for new buildings. Proposed standards are planned for 2027 adoption and Jan 1, 2029 effect.
Source: California Energy Commission 2028 Energy Code rulemaking, Docket 25-BSTD-03 (Title 24, Part 6) (opens in a new tab)
PendingUnder review - CaliforniaCode amendmentPartial
State Fire Marshal 2025 Intervening Cycle proposal for Part 9
Proposes adopting the most recent edition of NFPA 855 into the Fire Code's storage system rules, citing SB 283.
Source: California Building Standards Commission State Fire Marshal initial statement of reasons, 2025 Intervening Cycle (opens in a new tab)
PendingProposed - CaliforniaBillPartial
AB 1813
Concerned a customer renewable energy subscription program.
Source: Office of the Governor of California Legislative update dated Sep 30, 2026 (opens in a new tab)
Vetoed Sep 30, 2026.
Did not pass - CaliforniaBillPartial
AB 2369
Concerned energy storage and energy-only resources.
Source: Office of the Governor of California Legislative update dated Sep 27, 2026 (opens in a new tab)
Vetoed Sep 27, 2026.
Did not pass - CaliforniaBillPartial
SB 1295
Proposed directing regulators to consider procurement strategies for distributed storage, amend storage tariffs by Jan 1, 2028, and let utilities earn returns on storage.
Source: California State Senate, Committee on Energy, Utilities and Communications Analysis of Apr 9, 2026 version, hearing Apr 21, 2026 (opens in a new tab)
Did not pass Aug 13, 2026.
Did not pass - CaliforniaBillPartial
AB 615
Proposed requiring storage projects using state opt-in permitting to file emergency response and action plans, with local review of NFPA 855 setbacks. It was vetoed.
Source: California State Senate, Committee on Energy, Utilities and Communications Analysis of May 5, 2025 version, hearing Jul 7, 2025 (opens in a new tab)
Vetoed Oct 6, 2025.
Did not pass - CaliforniaBillPartial
AB 1408
Proposed requiring utilities and the grid operator to evaluate and integrate surplus interconnection capacity on the transmission system. It was vetoed.
Source: Office of the Governor of California Legislative update dated Oct 3, 2025 (opens in a new tab)
Vetoed Oct 3, 2025.
Did not pass - CaliforniaBillPartial
AB 303
Proposed barring approval of projects with 200 MWh or more of battery storage within 3,200 feet of sensitive receptors or on sensitive sites. It died in committee.
Source: California State Assembly, Committee on Utilities and Energy 2025 legislative summary, Nov 2025 (opens in a new tab)
Did not pass - CaliforniaBillPartial
AB 434
Proposed removing battery storage from the state opt-in permitting process and barring new battery facility approvals until Jan 1, 2028, pending fire standards. It died in committee.
Source: California State Assembly, Committee on Utilities and Energy 2025 legislative summary, Nov 2025 (opens in a new tab)
Did not pass - ColoradoStatutePartial
HB26-1007 portable-scale solar and meter collar adapters
Bars utilities from requiring approval for portable-scale solar devices, voids unreasonable restrictions, and orders PUC rule changes by Dec 31, 2026 allowing meter collar adapters. News reports up to 1,920 W and listing by a national lab; fiscal note and bill page did not confirm.
Source: leg.colorado.gov (opens in a new tab)
“takes effect on August 12, 2026, assuming no referendum petition is filed”
Enacted May 7, 2026. In force from Aug 12, 2026.
In force - ColoradoStatuteLead only
C.R.S. 8-20-107 (retail EV charging standards)
Division of Oil and Public Safety must adopt rules on specifications, tolerances and methods of sale for publicly accessible chargers by 2026-07-01. public chargers.
Source: afdc.energy.gov (opens in a new tab)
Enacted May 24, 2025. In force from Jul 1, 2026.
In force - ColoradoStatuteLead only
C.R.S. 28-38.5-102, 30-28-213, 31-23-316 (local EV charger permitting)
Counties over 20,000 residents must adopt a permitting ordinance at or below the CEO model code, an objective administrative review, or keep current process by 2025-12-31; report due 2026-03-01. residential, commercial, public chargers.
Source: afdc.energy.gov (opens in a new tab)
In force May 9, 2024. In force from Dec 31, 2025.
In force - ColoradoStatuteLead only
C.R.S. 38-35.7-109 (new residence EV option)
Builders of new residences must offer buyers a charger, upgraded wiring, or a charger-capable outlet in the parking area. residential.
Source: afdc.energy.gov (opens in a new tab)
In force as of Jun 1, 2023.
In force - ColoradoCode amendmentLead only
C.R.S. 24-38.5-401 (model EV-ready energy code)
Energy Code Board model code requires EV-ready or EV-capable provisions, at least 20 percent of spaces at multifamily and commercial buildings, with pre-wiring for single-family. residential, multifamily, commercial.
Source: afdc.energy.gov (opens in a new tab)
In force as of Jan 1, 2022.
In force - ColoradoStatuteLead only
C.R.S. 38-12-601 and 38-33.3-106.8 (renter and HOA right to charge)
Tenants may install a Level 1 or 2 charger at own expense; landlord may charge reasonable fee and require safety rules. Common interest communities may not restrict chargers. multifamily, rental, HOA.
Source: afdc.energy.gov (opens in a new tab)
In force as of May 3, 2013.
In force - ConnecticutStatuteLead only
HB 5340 (Public Act 26-127) omnibus solar bill
Omnibus solar act with provisions allowing residential use of portable plug-in solar panels.
Source: pv-magazine-usa.com (opens in a new tab)
Enacted Jun 4, 2026. In force from Oct 1, 2026.
In force - ConnecticutStatuteLead only
C.G.S. 4b-77 (EV charger building standards)
New state buildings over $100,000 need Level 2 at 20 percent of spaces; new commercial and multi-unit residential with 30+ spaces must support Level 2 or DC fast at 10 percent of spaces. commercial, multifamily, state buildings.
Source: afdc.energy.gov (opens in a new tab)
In force May 10, 2022. In force from Jan 1, 2023.
In force - ConnecticutStatutePartial
C.G.S. 47-261g (condo association right to charge)
Condo associations may not prohibit or restrict installing or using EV chargers; installer needs approval, licensed contractor, insurance, and pays costs. multifamily, condo owners.
Source: cga.ct.gov (opens in a new tab)
In force May 10, 2022. In force from Oct 1, 2022.
In force - ConnecticutStatutePartial
C.G.S. 47a-13b (tenant right to charge)
Landlord must approve tenant written request for a charger at designated parking space; phased by units owned: 250+ units 2022-10-01, 50-250 units 2023-10-01, under 50 units 2024-10-01. multifamily, rental.
Source: cga.ct.gov (opens in a new tab)
In force May 10, 2022. In force from Oct 1, 2022.
In force - ConnecticutStatuteLead only
C.G.S. 16-19ggg (public charger requirements)
Public chargers that charge must offer multiple payment methods, cannot require membership, and must report location and characteristics to AFDC. public chargers.
Source: afdc.energy.gov (opens in a new tab)
In force as of Jun 7, 2016.
In force - DelawareStatuteLead only
Title 16 Ch. 80 (EV-capable and EV-installed new construction, SB 103)
New single-family homes need one EV-capable space from 2024-01-01; new multifamily from 2025-01-01 need chargers on 5 percent of spaces and 10 percent EV-capable. residential, multifamily.
Source: afdc.energy.gov (opens in a new tab)
In force Aug 3, 2023. In force from Jan 1, 2024.
In force - DelawareStatuteLead only
22 Del. C. 119 (curbside residential charger permitting)
Municipalities over 30,000 residents must have a permit procedure for curbside residential chargers: licensed electrician, owner consent, decision within 90 days. residential.
Source: afdc.energy.gov (opens in a new tab)
Enacted Jun 14, 2022.
In force - DelawareBillLead only
SB 270 plug-in solar
Plug-in solar bill; tracker says deferred to 2027 session.
PendingIntroduced - District of ColumbiaStatuteLead only
D.C. Code 6-1451.03c, CB 25-262 (condo right to charge)
Condo associations cannot bar or substantially burden a charger in an owner's assigned space; owner uses licensed installer and pays costs. multifamily, condo owners.
Source: afdc.energy.gov (opens in a new tab)
Enacted Nov 22, 2024.
In force - District of ColumbiaStatuteLead only
Curbside charging authorization and permits (AFDC 12945, 12946; EV charger deployment permits 14325)
District authorizes resident curbside charging and public curbside station permits; details not reviewed. residential, public chargers.
In force - District of ColumbiaStatuteLead only
D.C. Code 6-1451.03a (older 20 percent EV-ready standard)
New construction and renovation of commercial and multi-unit buildings with 3+ off-street spaces must reserve 20 percent for charging-ready infrastructure; Mayor sets specs. multifamily, commercial.
In force - District of ColumbiaStatuteLead only
D.C. Code 6-1451.03a to 03b, CB 25-262 (EV-ready new construction)
New single-family with off-street parking needs one Level 1 EV-ready space; commercial and multifamily with 6+ spaces from 2027-01-01: commercial 15 percent installed and 25 percent ready, multifamily 25 percent ready; more multifamily steps 2031 and 2034. residential, multifamily, commercial.
Source: afdc.energy.gov (opens in a new tab)
Enacted Nov 22, 2024. Takes effect Jan 1, 2027.
Not yet in force - District of ColumbiaBillLead only
B26-0602 plug-in solar
Council bill on plug-in solar; tracker says in progress.
PendingIn committee - FloridaBillPartial
CS/CS/CS/HB 1417 (2026)
Requires solar facility permit applicants to include site-specific erosion and sediment control plans, stormwater design standards, and certified inspections during construction.
Source: Florida Senate CS/CS/CS/HB 1417 (2026), Ch. 2026-2, Laws of Florida; Senate companion SB 1510 (opens in a new tab)
Signed into law Mar 19, 2026. In force from Jul 1, 2026.
In force - FloridaStatutePartial
s. 163.3205
Requires local plans to treat solar facilities, defined to include inverters and battery systems, as a permitted use in agricultural areas. Requires permit applicants to include erosion and sediment controls, 100-year storm design, and certified inspections when building solar facilities.
Source: Florida Legislature, Online Sunshine s. 163.3205, F.S. (as amended by s. 2, ch. 2026-2) (opens in a new tab)
In force from Jul 1, 2026.
In force - FloridaRulePartial
Rule 69A-73.002
Requires energy storage systems to comply with NFPA 855, 2023 Edition, and the Florida Fire Prevention Code, with a state amendment to section 4.8.2.2.
Source: Florida Department of State Florida Administrative Register, Mar 31, 2025 issue, Chapter 69A-73 rule text (opens in a new tab)
In force from Aug 24, 2025.
In force - FloridaBillPartial
HB 683 (2025)
Allows private providers to handle solar energy and energy storage installations as single-trade plans reviews and inspections, including automated or software-based plans review. Requires local officials to issue permits within set times after certain single-trade plans reviews.
Source: Florida Senate HB 683 (2025), Ch. 2025-140, Laws of Florida (opens in a new tab)
Signed into law Jun 13, 2025. In force from Jul 1, 2025.
In force - FloridaCode amendmentPartial
Rule 61G20-1.001
Requires construction statewide, including electrical and energy systems such as solar and battery installations, to meet the Florida Building Code, 8th Edition (2023).
Source: Florida Department of State Florida Administrative Code, rule 61G20-1.001 page (opens in a new tab)
In force from Dec 31, 2023.
In force - FloridaCode amendmentPartial
Rules 69A-60.002 to 69A-60.005
Requires compliance with NFPA 1 and NFPA 101, Florida 2021 Editions, as the Florida Fire Prevention Code, including its referenced energy storage standard.
Source: Florida Department of State Florida Administrative Code, Chapter 69A-60 page (opens in a new tab)
In force from Dec 31, 2023.
In force - FloridaStatutePartial
Fla. Stat. 718.113 (condo EV and NGV charging)
Condo associations may not prohibit or restrict a charger in an owner's designated parking space; owner meets codes, uses licensed installer, insures, and pays costs. multifamily, condo owners.
Source: flsenate.gov (opens in a new tab)
In force Jul 1, 2018. In force from Jul 1, 2021.
In force - FloridaStatuteLead only
Fla. Stat. 366.94 (EV charging stations)
Non-charging vehicles may not occupy charging spaces; Department of Agriculture and Consumer Services sets rules on sale method, labeling and price posting. public chargers.
Source: afdc.energy.gov (opens in a new tab)
In force as of Apr 14, 2012.
In force - FloridaStatutePartial
s. 193.624
Requires property appraisers to exclude the value of renewable energy source devices, including photovoltaic modules, inverters, and storage devices, from assessments. The exclusion is 100 percent for residential devices and 80 percent for nonresidential devices installed on or after Jan 1, 2018.
Source: Florida Senate, Florida Statutes s. 193.624, F.S. (opens in a new tab)
In force - FloridaStatutePartial
s. 553.791
Allows owners to use private providers for plans review and inspections, including single-trade review of solar energy and energy storage installations. Requires local officials to decide permits within set business-day deadlines, or some permits are deemed approved.
Source: Florida Legislature, Online Sunshine s. 553.791, F.S. (opens in a new tab)
In force - FloridaStatutePartial
s. 633.206
Requires uniform statewide firesafety standards for energy storage systems, which the State Fire Marshal implements through Chapter 69A-73, F.A.C.
Source: Florida Legislature, Online Sunshine s. 633.206, F.S. (opens in a new tab)
In force - FloridaCode amendmentPartial
Proposed Rule 61G20-1.001
Proposes adopting the Florida Building Code, 9th Edition (2026), as the statewide construction code through the triennial update.
Source: Florida Department of State Florida Administrative Code, rule 61G20-1.001 page (opens in a new tab)
Proposed Sep 23, 2026.
Pending - FloridaCode amendmentPartial
Chapter 69A-60 proposed rule
Proposes the triennial Florida Fire Prevention Code update, listing NFPA 855 and Chapter 69A-73 energy storage standards among its referenced and covered rules.
Source: Florida Department of Financial Services, Division of State Fire Marshal Notice of Proposed Rule, Chapter 69A-60 (rules 69A-60.002, .003, .004, .005, and .007), F.A.C. (opens in a new tab)
Proposed Jun 12, 2026.
Pending - FloridaBillPartial
CS/HB 1049 (2026)
Proposes barring local permits for specified backup power system work by certain installers and requiring a notice process before installation.
Source: Florida Senate CS/HB 1049 (2026) (opens in a new tab)
Did not pass Mar 13, 2026.
Did not pass - FloridaBillPartial
SB 200 and HB 193 (2026)
Proposes letting counties require decommissioning of solar facilities at the end of useful life, with financial assurance from facility owners.
Source: Florida Senate SB 200 and HB 193 (2026) (opens in a new tab)
Did not pass Mar 13, 2026.
Did not pass - FloridaBillPartial
SB 968 (2026)
Proposes barring local permits or equivalent review for installing, relocating, replacing, or repairing eligible residential backup power systems. Also proposes blocking local building code amendments that would require such permits.
Source: Florida Senate SB 968 (2026) (opens in a new tab)
Did not pass Mar 13, 2026.
Did not pass - FloridaBillPartial
CS/SB 1304 and HB 1595 (2025)
Proposes letting counties require proper decommissioning of solar facilities and removing their automatic permitted-use status in agricultural land use categories.
Source: Florida Senate CS/SB 1304 and HB 1595 (2025) (opens in a new tab)
Did not pass Jun 16, 2025.
Did not pass - FloridaBillPartial
CS/SB 800 and HB 1201 (2025)
Proposes barring sale of products powered by lithium and other batteries unless the battery is removable and labeled with recycling and chemistry markings.
Source: Florida Senate CS/SB 800 and HB 1201 (2025) (opens in a new tab)
Did not pass Jun 16, 2025.
Did not pass - GeorgiaStatuteLead only
O.C.G.A. 10-1-220 to 10-1-228 (EV charger kWh measurement and inspection)
Public EV chargers billing per kWh must accurately measure and display electricity delivered; Department of Revenue may inspect; fines up to $1,000. public chargers.
Source: afdc.energy.gov (opens in a new tab)
Enacted May 2, 2023. Takes effect Jan 1, 2027.
Not yet in force - GeorgiaBillLead only
HB 1304 plug-in solar
Plug-in solar bill; tracker says deferred to 2027 session.
PendingIntroduced - IdahoStatuteLead only
HB 86 (2025), Idaho Code 39-4109B (preempts local EV infrastructure mandates)
Cities and counties may not require EV charging equipment, reserved EV spaces or upgraded conduit in new buildings; existing local requirements are preempted. residential, commercial.
Source: afdc.energy.gov (opens in a new tab)
Enacted Mar 11, 2025.
In force - IdahoBillLead only
HB 612 plug-in solar
Plug-in solar bill; tracker says deferred to 2027 session.
PendingIntroduced - IllinoisStatuteLead only
765 ILCS 1085/20 and 1085/25 (EV-capable new residential, SB 40)
New single-family and small multifamily need one EV-capable space per unit with parking; large multifamily all spaces EV-capable; affordable housing phase-in 40 percent from 2026-01-01, 50 percent 2029, 70 percent 2034. residential, multifamily.
Source: afdc.energy.gov (opens in a new tab)
In force Jun 9, 2023. In force from Jan 1, 2026.
In force - IllinoisStatuteLead only
765 ILCS 1085/30 (Electric Vehicle Charging Act, condo and common interest)
Condo and common interest associations may not prohibit or restrict a charger in an owner's designated space; owner uses licensed contractor, insures, and pays costs. multifamily, condo owners.
Source: afdc.energy.gov (opens in a new tab)
In force as of Jun 9, 2023.
In force - IllinoisStatuteLead only
765 ILCS 1085/35 (tenant right to charge)
Tenants may install Level 1 or 2 chargers in an assigned space; landlord may require electricity payment, deposit, and reimbursement of upgrades; licensed contractor and insurance required. multifamily, rental.
Source: afdc.energy.gov (opens in a new tab)
In force as of Jun 9, 2023.
In force - IllinoisStatuteLead only
220 ILCS 5/16-128A (ICC EV charger installer certification)
Vendors installing chargers must meet Illinois Commerce Commission certification, training and insurance requirements and notify the utility; self-install allowed for personal non-commercial use. residential, commercial.
Source: afdc.energy.gov (opens in a new tab)
In force as of Oct 31, 2011.
In force - IllinoisBillLead only
SB 3104 plug-in solar
Utah-modeled bill exempting certified low-wattage plug-in systems from interconnection review; sponsor held it in the Senate in April 2026 and may refile in veto session. Original text exempted systems between 400 and 1,200 W; labor and utilities objected over backfeed.
PendingIn committee - IndianaStatuteLead only
Ind. Code 8-1-2-1.3 (EV charging providers not public utilities)
A person who owns, operates or leases EV chargers for public use is not defined as a public utility. public chargers.
Source: afdc.energy.gov (opens in a new tab)
Enacted Mar 11, 2022.
In force - IndianaBillLead only
SB 74 / HB 1084 plug-in solar
Plug-in solar bills; tracker says deferred to 2027 session.
PendingIntroduced - IowaStatuteLead only
Iowa Code 452A.41 (EV charger inspection)
Department of Agriculture and Land Stewardship inspects chargers of licensed electric fuel dealers every two years for accurate metering under NIST Handbook 44; noncompliance reported to Revenue. public chargers.
Source: afdc.energy.gov (opens in a new tab)
Enacted May 2, 2023.
In force - IowaStatuteLead only
Iowa Code 452A.42 (electricity dealer license)
Selling electricity as vehicle fuel at a non-residence location requires a license from the Department of Revenue. public chargers.
Source: afdc.energy.gov (opens in a new tab)
Enacted May 16, 2019.
In force - IowaBillLead only
HF 2046 plug-in solar
Plug-in solar bill; tracker says deferred to 2027 session.
PendingIntroduced - KansasStatuteLead only
HB 2255 (2025), K.S.A. 83-201, 83-208, 83-219, 83-501 (EV charging station inspection)
Department of Agriculture may inspect and test charging stations against weights and measures standards for selling electricity; fines up to $5,000. public chargers.
Source: afdc.energy.gov (opens in a new tab)
Enacted Apr 8, 2025.
In force - KentuckyStatuteLead only
KRS 224.20-770 (fueling station zoning)
Local governments may not prohibit or limit retail filling stations, including locations allowing EV chargers, where similar businesses may locate. public chargers.
Source: afdc.energy.gov (opens in a new tab)
Enacted Apr 12, 2024.
In force - LouisianaStatuteLead only
La. R.S. 3:4602 and 3:4604 weights and measures
Lets the Commission of Weights and Measures regulate commercial metering devices, including those measuring electricity sold at EV charging stations. public and commercial chargers.
In force - LouisianaStatuteLead only
La. R.S. 45:1622-1623 EV charging station promotion; PSC Docket R-36131
Directs state support for a charging network with better charger quality and user experience; EV charging providers are not public utilities. public chargers.
In force - LouisianaStatuteLead only
La. R.S. 51:3042 alternative fuel access
Bars local governments from adopting rules that limit consumer access to alternative fuels, including electricity. public chargers, local permitting.
In force - MaineStatuteLead only
LD 1730 An Act to Make Small Plug-in Solar Generation Devices Accessible for All Maine Residents
Makes small plug-in solar devices accessible, with safety standards and protection from extra utility fees and paperwork. Terms not confirmed; 800 W appears only as a savings estimate.
Source: legiscan.com (opens in a new tab)
Enacted Apr 6, 2026. In force from Jul 15, 2026.
In force - MaineStatutePartial
33 M.R.S. 576-A EV charging stations allowed (SP 457, 2025)
Voids condominium declaration or bylaw provisions that prohibit or unreasonably restrict EV chargers in unit or limited common element spaces; board must decide within 60 days or application is deemed approved. condominium owners.
Source: legislature.maine.gov (opens in a new tab)
“any provision of a declaration or bylaw that either prohibits or places an unreasonable restriction”
In force from Jan 1, 2026.
In force - MaineStatuteLead only
35-A M.R.S. 313-A, 3201 EV charging not utility service
Entities selling electricity only for EV charging are not regulated as electricity providers; submetered charge limited to kWh used. commercial chargers.
In force - MaineStatuteLead only
HB 467 (2023) accessible EV charger working group
Directs the Transportation Commissioner to study charger accessibility and recommend standards for local codes. public chargers.
In force - MarylandStatutePartial
HB 1532 Utility RELIEF Act (plug-in solar provisions)
Omnibus act changing permitting, inspection and interconnection for certain residential solar; news says it exempts plug-in systems from utility fees and interconnection. News: 1,200 W cap per meter, UL listing (exempt 391 W or less), customer notice, utility may require disconnect switch.
Source: mgaleg.maryland.gov (opens in a new tab)
Enacted May 12, 2026.
In force - MarylandRuleLead only
EV charger registration with Dept. of Agriculture weights and measures
Chargers used in commercial transactions must be registered, $150 per charger. public chargers.
Source: afdc.energy.gov (opens in a new tab)
In force from Jan 1, 2026.
In force - MarylandStatutePartial
HB 830 (2023) Residential Construction or Significant Renovation - EV Charging; Public Safety 12-205
New homes with garage, carport or driveway need a Level 2 charger, EV-ready or EV-capable space; multifamily common lots need a charger plus EV-capable percentages rising over time. residential new construction and multifamily.
Source: mgaleg.maryland.gov (opens in a new tab)
In force from Oct 1, 2023.
In force - MarylandCommission orderLead only
PSC Order 88997 (Case 9478), Public Utilities 7-901 to 7-905
Utility-installed Level 2 chargers must maintain 97% uptime. utility-installed public chargers.
In force - MarylandStatuteLead only
Real Property 11-111.4 and 11B-111.8 association EV charger policies (SB 144, 2021)
HOAs and condominiums cannot bar EV chargers in an owner's designated parking space but may set reasonable limits; owner pays. HOA and condominium owners.
In force - MarylandStatuteLead only
Transportation 11-145.1 and 21-1003.2 charging space rules
Only plugged-in EVs may use charging spaces; $100 fine; signage required. public chargers.
In force - MassachusettsProgram rulePartial
225 CMR 28.00
Pays solar incentives per kWh; systems of 25 kW AC or less get a flat $0.03 per kWh, or $0.06 for low-income customers. Paired storage earns an energy storage adder, listed at $0.04 per kWh for program year 2026.
Source: Massachusetts Department of Energy Resources 225 CMR 28.00 (SMART 3.0) (opens in a new tab)
Adopted Sep 11, 2026.
In force - MassachusettsRulePartial
225 CMR 29.00
Requires local governments to accept consolidated permit applications by Oct 1, 2026 for solar under 25 MW and storage under 100 MWh. Decisions are due within 12 months, or the permit is approved by default. Storage of 250 kWh or less and accessory behind-the-meter systems skip the site suitability rules.
Source: Massachusetts Department of Energy Resources 225 CMR 29.00 (opens in a new tab)
In force from Jul 1, 2026.
In force - MassachusettsAgency guidancePartial
Energy Facilities Siting Board
Sets baseline standards requiring storage facilities under state siting rules to be Listed to UL 9540, meet UL 9540A testing, and follow NFPA 855. It also requires emergency response plans with local fire officials, hazard signage, and incident reports to the town within one week.
Source: Energy Facilities Siting Board Energy Facilities Siting Board, 980 CMR 13.00 Regulation Guidance, Attachment 2: Uniform Set of Baseline Health, Safety, Environmental, and Other Standards (opens in a new tab)
In force from Jul 1, 2026.
In force - MassachusettsAgency guidancePartial
225 CMR 29.00 guideline
Sets minimum standards under 225 CMR 29.00 for storage facilities that seek a consolidated local permit. They include NFPA 855, listing to UL 9540, UL 9540A testing, setbacks, and a 125 percent decommissioning surety.
Source: Massachusetts Department of Energy Resources Public health, safety, and environmental standards guideline (opens in a new tab)
Published May 22, 2026.
In force - MassachusettsRulePartial
980 CMR 13.00 through 17.00
Sets Energy Facilities Siting Board procedures for consolidated permits, state review of local decisions, site suitability analysis, pre-filing engagement, and approval by default.
Source: Energy Facilities Siting Board Consolidated permit rulemaking page (opens in a new tab)
Adopted May 20, 2026.
In force - MassachusettsTariffPartial
NSTAR Electric Company d/b/a Eversource Energy
Sets one utility's interconnection rules, including a simplified track for listed inverter systems of 25 kilowatts or less. The utility must authorize interconnection within five business days once requirements are met. Group studies may use export limits for integrated storage.
Source: NSTAR Electric Company Interconnection tariff M.D.P.U. No. 55D (opens in a new tab)
In force from May 1, 2026.
In force - MassachusettsCode amendmentPartial
527 CMR 12.00
Requires installations permitted after Apr 24, 2026 to meet the 2026 National Electrical Code with Massachusetts amendments. It changes solar photovoltaic warning label rules, deletes Article 691, and requires outdoor service disconnects at one- and two-family homes.
Source: Board of Fire Prevention Regulations, Department of Fire Services 527 CMR 12.00 (Massachusetts Electrical Code, based on the 2026 NEC) (opens in a new tab)
In force from Apr 24, 2026.
In force - MassachusettsProgram rulePartial
ConnectedSolutions small-scale battery program details
Pays $275 per kW for behind-the-meter batteries of 50 kW or less that discharge during 30 to 60 summer peak events. The rate is locked for five years. It can be combined with the Solar Massachusetts Renewable Target program and net metering. Storage that charges from the grid and exports cannot net meter.
Source: Cape Light Compact Residential battery program materials (opens in a new tab)
Published Mar 13, 2026.
In force - MassachusettsAgency guidancePartial
Attorney General decision on the Town of Blandford's solar and battery storage moratorium
Disapproved the town's temporary moratorium on large ground-mounted solar and battery storage, so it never took effect. It found that battery storage systems count as solar energy systems that state zoning law protects.
Source: Massachusetts Attorney General's Office Municipal Law Unit decision (opens in a new tab)
Published Mar 11, 2026.
In force - MassachusettsCommission orderPartial
D.P.U. 25-48
Revised the model interconnection tariff that each utility's own tariff follows. As proposed, it raised the Simplified Process limit from 15 kW to 25 kW and opened faster review paths to storage.
Source: Massachusetts Department of Public Utilities D.P.U. 25-48 (opens in a new tab)
Adopted Feb 10, 2026.
In force - MassachusettsAgency guidancePartial
MassDEP Guidance on Electric Battery Storage and Electric Vehicle Chargers
Summarizes existing rules, including a fire department permit above 20 kWh, or above 1 kWh at one- and two-family homes, and listing to UL 9540. It says most lithium-ion batteries are hazardous waste that can be managed as universal waste. Fire departments must approve storage decommissioning plans.
Source: Massachusetts Department of Environmental Protection Guidance on electric battery storage, Aug 2025 (opens in a new tab)
Published Aug 20, 2025.
In force - MassachusettsCommission orderPartial
D.P.U. 24-140 through D.P.U. 24-149
Approves, with modifications, the 2025 to 2027 efficiency plans, including an improved demand response program that controls customer batteries and thermostats during system peaks. It also cuts the plan budgets by $500 million.
Source: Massachusetts Department of Public Utilities D.P.U. 24-140 through D.P.U. 24-149, Order on the 2025-2027 Three-Year Energy Efficiency Plans (Feb 28, 2025) (opens in a new tab)
Adopted Feb 28, 2025.
In force - MassachusettsRulePartial
220 CMR 18.00
Requires utilities to credit net metering facilities; Class I runs to 60 kW, and Class I systems of 25 kW or less are cap exempt. Requires that energy storage systems not count as on-site load when qualifying for cap exemptions.
Source: Massachusetts Department of Public Utilities 220 CMR 18.00 net metering regulation (opens in a new tab)
In force from Dec 20, 2024.
In force - MassachusettsStatutePartial
Chapter 239 of the Acts of 2024, sections 84-86 (M.G.L. c.183A)
Condo associations and historic district commissions cannot prohibit or unreasonably restrict owner EV chargers; written decision required, deemed approved after 60 days. condominium owners.
Source: mass.gov (opens in a new tab)
“cannot prohibit or unreasonably restrict Electric Vehicle (EV) charger installations by property owners”
In force as of Nov 20, 2024.
In force - MassachusettsCode amendmentPartial
780 CMR
Requires building construction to meet the 2021 International Codes with Massachusetts amendments.
Source: Board of Building Regulations and Standards 780 CMR (tenth edition), Massachusetts State Building Code (opens in a new tab)
In force from Oct 11, 2024.
In force - MassachusettsCode amendmentPartial
780 CMR 51.00
Requires home energy storage to get building permits and inspections, follow the state electrical code, and have smoke and carbon monoxide alarms. Requires solar electrical work under the state electrical code and allows alternative ridge setbacks in sprinklered homes.
Source: Board of Building Regulations and Standards Residential code chapter 3, tenth edition (opens in a new tab)
In force from Oct 11, 2024.
In force - MassachusettsAgency guidancePartial
State Fire Marshal memo to building inspectors and fire prevention officers
Says storage installations permitted on or after Dec 9, 2022 must meet the prescriptive rules of the latest edition of 527 CMR 1.00. It ends the Jun 7, 2021 alternatives for one- and two-family homes.
Source: Department of Fire Services, Office of the State Fire Marshal State Fire Marshal memo to building inspectors and fire prevention officers, Mar 1, 2023 (opens in a new tab)
Published Mar 1, 2023.
In force - MassachusettsAgency guidancePartial
TSRG Common Technical Standards Manual
Lists utility technical requirements for connecting inverters and storage, such as inverters Listed to UL 1741 and IEEE 1547 trip functions. It is a reference, and each utility's own requirements control.
Source: Technical Standards Review Group Common technical standards manual, Dec 2022 (opens in a new tab)
Published Dec 22, 2022.
In force - MassachusettsCode amendmentPartial
527 CMR 1.00 (2021 edition)
Adopts NFPA 1 (2021 edition) with Massachusetts amendments as the state fire code.
Source: Department of Fire Services 527 CMR 1.00 (2021 edition), Massachusetts Comprehensive Fire Safety Code (opens in a new tab)
In force from Dec 9, 2022.
In force - MassachusettsStatutePartial
St. 2022, c. 179, § 72
Under this section, each utility filed a tariff setting operating limits for energy storage connected to its grid. The Department of Public Utilities reviewed them in D.P.U. 23-115, 23-117, and 23-126.
Source: Massachusetts Department of Public Utilities St. 2022, c. 179, § 72 (opens in a new tab)
In force as of Aug 11, 2022.
In force - MassachusettsStatutePartial
St. 2022, c. 179, §§ 13 and 24
Allows clean energy matching grants, including for energy storage technologies, to go to municipal colleges and public schools. Allows energy efficiency programs to combine efficiency and electrification with renewable generation and storage.
Source: Massachusetts Legislature St. 2022, c. 179, §§ 13 and 24 (opens in a new tab)
In force as of Aug 11, 2022.
In force - MassachusettsRuleLead only
225 CMR 9 and M.G.L. c.25B section 5 EVSE efficiency
EV chargers sold in the state must meet DOER efficiency standards. all chargers.
In force - MassachusettsCode amendmentLead only
780 CMR 13 section C405.13 EV-ready spaces
New commercial parking must include EV-ready spaces scaled by total spaces, 1 to 10 percent capped at 16. commercial new construction.
In force - MassachusettsStatuteLead only
Ch. 329 (2022) Cambridge association charger policy
Bars associations from blocking homeowner charger installation in assigned parking. HOA owners in Cambridge.
In force - MassachusettsProgram rulePartial
DOER Advancing Massachusetts Power energy storage grant program
Funds energy storage through a $47 million state grant program with community resilience, long-duration storage, and safety and education tracks.
Source: Department of Energy Resources DOER Advancing Massachusetts Power (AMP) energy storage grant program (opens in a new tab)
In force - MassachusettsStatuteLead only
M.G.L. c.25A 16B-16E public charger requirements
Paid public chargers must offer access without mandatory subscriptions and report location, hours and payment to AFDC. public chargers.
In force - MassachusettsStatuteLead only
M.G.L. c.98 section 59 charging station standards and inventory
Division of Standards inventories public stations and verifies price and energy accuracy. public chargers.
In force - MassachusettsStatutePartial
St. 2024, c. 239, § 23
Local governments must decide consolidated permits for solar under 25 MW and storage under 100 MWh within 12 months. Otherwise the permit is approved by default. The Department of Energy Resources sets siting standards, and applicants may seek a new state review of local decisions.
Source: Massachusetts Legislature St. 2024, c. 239, § 23 (G.L. c. 25A, § 21) (opens in a new tab)
In force - MassachusettsStatutePartial
St. 2024, c. 239, § 74
Requires large clean energy facilities, including storage of 100 MWh or more, to get one consolidated permit from the Energy Facilities Siting Board. The board must decide within 15 months. Smaller solar and storage facilities may seek a board permit or a new state review of local decisions.
Source: Massachusetts Legislature St. 2024, c. 239, § 74 (G.L. c. 164, §§ 69T-69W), with definitions in §§ 50-58 (G.L. c. 164, § 69G) (opens in a new tab)
In force - MassachusettsCode amendmentPartial
527 CMR 1.00 (2024 Edition)
Proposes moving the state fire code to NFPA 1 (2024 edition) with Massachusetts amendments. Energy storage would follow NFPA 855 (2026 edition), with permits required above the Table 52.1.1 thresholds.
Source: Department of Fire Services Proposed amendments to 527 CMR 1.00 (opens in a new tab)
Proposed Oct 15, 2026.
Pending - MassachusettsBillPartial
H.5641
Proposes allowing Becket to adopt a six-month moratorium on large-scale solar and battery storage, excluding batteries accessory to individual residential use.
Source: Massachusetts Legislature H.5641, 194th General Court (House Docket 6290) (opens in a new tab)
In committee since Aug 4, 2026.
Pending - MassachusettsBillPartial
H.5175
An earlier House draft, H.5151, proposed a statewide storage incentive program and a state permitting platform for home solar and storage. The Senate passed its own text, and a conference committee has had the bill since Jul 16, 2026.
Source: Massachusetts Legislature H.5175, 194th General Court (House draft H.5151 as amended; Senate text S.3143) (opens in a new tab)
Passed both chambers Jul 1, 2026.
Pending - MassachusettsBillPartial
SD.3182
Proposes requiring local approval for permitting battery storage facilities.
Source: Massachusetts Legislature SD.3182, 194th General Court (Senate docket; no Senate bill number shown) (opens in a new tab)
In committee since Apr 1, 2026.
Pending - MassachusettsBillPartial
S.2270
Proposes requiring each electric company to run a virtual power plant program paying customer-sited distributed energy resources for peak load reduction. Proposes a goal of distributed resources equal to 20 percent of state load by 2035 and interconnection performance incentives.
Source: Massachusetts Legislature S.2270, 194th General Court (Senate Docket 2553) (opens in a new tab)
In committee since Dec 15, 2025.
Pending - MassachusettsBillPartial
SD.3224
Proposes establishing buffer zones for battery storage facilities.
Source: Massachusetts Legislature SD.3224, 194th General Court (Senate docket; no Senate bill number shown) (opens in a new tab)
In committee since Oct 2, 2025.
Pending - MassachusettsBillPartial
H5175 energy affordability omnibus (plug-in solar provisions reported by tracker)
Energy omnibus in conference committee as of 2026-07-16; trackers say it carries plug-in solar rules (proposed 1,200 W, no permit or utility notice). Proposed 1,200 W cap per tracker.
PendingPassed one chamber - MassachusettsBillPartial
H.5294
Proposes a temporary moratorium on large ground-mounted solar and battery energy storage systems in the town of Worthington.
Source: Massachusetts Legislature H.5294, 194th General Court (opens in a new tab)
Did not pass Jun 8, 2026.
Did not pass - MassachusettsBillPartial
H.4685
Proposes barring state approval of any battery storage facility without a vote of the host municipality's governing body, with fines up to $100,000. Proposes a required local public hearing and no state override of a local denial.
Source: Massachusetts Legislature H.4685, 194th General Court (House Docket 4557) (opens in a new tab)
Did not pass Apr 13, 2026.
Did not pass - MassachusettsBillPartial
H.3467
Proposes energy code rules requiring solar on new buildings, plus battery storage on new multifamily and commercial buildings up to six stories. Building permits would require proof of compliance.
Source: Massachusetts Legislature H.3467, 194th General Court (opens in a new tab)
Did not pass Apr 6, 2026.
Did not pass - MassachusettsBillPartial
H.4144
Proposes a statewide solar incentive program set by regulation, state clean energy procurement that includes storage, and a state siting and permitting division. Its cover letter says it would change the Solar Massachusetts Renewable Target program and lower net metering credit rates.
Source: Massachusetts Legislature H.4144, 194th General Court (opens in a new tab)
Did not pass Apr 6, 2026.
Did not pass - MassachusettsBillPartial
H.4689
Proposes barring battery storage facilities within 2,000 feet of populated areas and 3,000 feet of ecologically protected areas. Also proposes fire mitigation plans, fire suppression for lithium-ion systems, and state fire marshal safety standards.
Source: Massachusetts Legislature H.4689, 194th General Court (opens in a new tab)
Did not pass Apr 6, 2026.
Did not pass - MassachusettsBillPartial
H.4690
Proposes an 18-month moratorium on new permits for lithium battery storage facilities while a state commission studies their risks.
Source: Massachusetts Legislature H.4690, 194th General Court (opens in a new tab)
Did not pass Apr 6, 2026.
Did not pass - MichiganStatuteLead only
2024 PA 68, MCL 559.301 et seq. (HOA energy-saving improvements)
Association provisions that bar or require approval for EV supply equipment installed by a member are unenforceable; excludes common areas and shared roofs. HOA and condominium owners.
Source: hopb.co (opens in a new tab)
In force from Apr 2, 2025.
In force - MichiganStatuteLead only
MCL 460.10a-10q EV charging electricity dealer license
Selling electricity as vehicle fuel at a non-residential location requires a license; charging providers are not public utilities. commercial and public chargers.
In force - MichiganBillPartial
HB 5764 small portable solar generation devices
Would add section 115 to 2008 PA 295 setting regulations for small portable solar generation devices.
Source: legislature.mi.gov (opens in a new tab)
In committee since Mar 19, 2026.
Pending - MinnesotaStatuteLead only
Minn. Stat. 239.90 retail EV charging labeling and inspection
Retail chargers must display price, power level and fees, comply with NEC Article 625; Commerce inspects annually with a $100 per port fee. public chargers.
In force - MinnesotaStatuteLead only
Minn. Stat. 325F.185 EV charger requirements
Chargers must work with any EV make or model, meet state safety and SAE standards, and support bidirectional charging where feasible. public chargers.
In force - MinnesotaStatuteLead only
Minn. Stat. 296A.051 public charger operator license
Public charger operators need an annual license from the Revenue commissioner. public chargers.
Source: afdc.energy.gov (opens in a new tab)
Takes effect Jul 1, 2027.
Not yet in force - MinnesotaBillPartial
HF 3439 (2023-24) EV-ready and EV-capable building code requirement
Would require EV-ready, EV-capable spaces and chargers in new commercial, multifamily and residential buildings and remove the under-four-unit exemption; laid over in committee April 2024. new construction.
Source: revisor.mn.gov (opens in a new tab)
In committee since Apr 11, 2024.
Pending - MinnesotaBillPartial
HF 1139 (2025-26) EV charging in new construction
Later session bill on EV charging in new construction; contents and status not verified. new construction.
PendingIntroduced - MinnesotaBillLead only
SF 4504 plug-in solar
Plug-in solar bill; tracker says deferred to 2027 session.
PendingIntroduced - MississippiStatuteLead only
Miss. Code 65-1-181 to 65-1-181.01 EV charger partnerships
Transportation Commission may partner with private firms on charging stations; stations must meet minimum standards the Commission sets, with periodic inspection allowed. public chargers.
In force - MississippiStatuteLead only
Miss. Code 77-3-3 public utility definition
Resellers of electricity for EV charging are end-use customers, not public utilities. commercial and public chargers.
In force - MissouriStatuteLead only
Mo. Rev. Stat. 386.020 electric corporation definition
Entities that offer or operate EV chargers are not electric corporations unless they produce or sell wholesale electricity. commercial and public chargers.
In force - MissouriStatuteLead only
Mo. Rev. Stat. 67.288 local charger mandate preemption
Bars local governments from requiring EV chargers or charging infrastructure in parking lots owned or leased by churches or nonprofits; voluntary installation stays allowed. church and nonprofit parking lots.
In force - MissouriBillLead only
HB 2528 / HB 2444 plug-in solar
Plug-in solar bills; tracker says deferred to 2027 session.
PendingIntroduced - MontanaStatuteLead only
SB 228 (2025); MCA 15-70-801 to 805 public charging station requirements
Public stations above 25 kW must register with MDT within 30 days, post rates and install meters; legacy stations must add vehicle-delivery metering by 2028; 3 cents/kWh tax. Home and HOA chargers exempt. public chargers.
Source: afdc.energy.gov (opens in a new tab)
Enacted and in force from Jul 1, 2025.
In force - MontanaStatuteLead only
MCA 69-8-803 EVSE not a public utility
Operators of electric vehicle supply equipment are not classified as public utilities under this section. commercial and public chargers.
In force - NebraskaStatuteLead only
Neb. Rev. Stat. 81-121 sanctioned-parts certificate
Entities receiving state funds for commercial chargers must certify no components come from OFAC-sanctioned entities. commercial chargers.
In force - NebraskaStatuteLead only
Neb. Rev. Stat. 70-1002 DC fast charger limits and EVITP contractor requirement
Limits when utilities may own DC fast chargers (distance and right-of-first-refusal rules, changing 2028); state or federally funded chargers must be installed by EVITP-certified contractors. public chargers.
Source: afdc.energy.gov (opens in a new tab)
Takes effect Jan 1, 2028.
Not yet in force - NevadaStatuteLead only
NRS 484B.468 EV charging space parking
Bars parking in EV charging spaces unless actively charging; fines up to $750. public chargers.
In force - NevadaStatuteLead only
NRS 704.021 EV charging not a public utility
Operators of facilities supplying electricity for EV charging are outside the public utility definition. commercial and public chargers.
In force - NevadaBillPartial
SB 152 (2025) EV charging in common-interest communities
Would bar associations from prohibiting owners installing EV chargers in exclusive-use areas and allow common-area chargers. HOA and condominium owners.
Source: archive.leg.state.nv.us (opens in a new tab)
“the executive board shall not and the governing documents must not prohibit a unit's owner or an occupant of a unit”
PendingIn committee - New HampshireStatutePartial
NH SB 540-FN (2026) relative to plug-in solar generation systems
Allows portable plug-in solar generation devices without utility approval, fees or interconnection review; utilities may offer an optional after-installation report. 1,200 W AC inverter output, one system per metered customer; anti-islanding/rapid shutdown listed to industry standards; receptacle listed for the purpose; one section may take effect 2027-01-01.
Source: gc.nh.gov (opens in a new tab)
“A maximum of one 1200 watt AC inverter output system shall be allowed per metered customer.”
Enacted and in force from Jul 2, 2026.
In force - New HampshireStatuteLead only
HB 111 (2023) study committee on EV charging for renters
Created a study committee on accessible charging for residential renters; no charging right enacted. multifamily renters.
In force - New HampshireStatuteLead only
N.H. RSA 236:133-134 public EV charger requirements
Publicly funded chargers must provide universal access, accept multiple payment options without required subscriptions, report to AFDC; only EVs may park in charger spaces. public chargers.
In force - New HampshireStatuteLead only
N.H. RSA 374-F, 374-G EV charging program authority
Lets PUC and Department of Energy set standards and rate mechanisms for utility EV charging programs. utility programs.
In force - New JerseyStatutePartial
NJ S2368/A4836 Garden State Balcony Solar Act
Exempts qualifying plug-in solar devices from utility interconnection and metering requirements; bars municipal bans or permit requirements and broad landlord/HOA bans. 1,200 W max; standard 120 V outlet.
Source: nj.gov (opens in a new tab)
“exempts qualifying plug-in solar devices of up to 1,200 watts”
Enacted Sep 1, 2026.
In force - New JerseyStatutePartial
P.L.2021 c.171 EV charging make-ready and permitted accessory use
Statewide: EVSE and make-ready spaces are permitted accessory use; new multifamily (5+ units) and non-residential developments with preliminary site plan approval must provide make-ready spaces. multifamily and commercial new development.
Source: nj.gov (opens in a new tab)
In force from Jul 9, 2021.
In force - New JerseyStatuteLead only
N.J.S. 40:55D-66.18 make-ready permitting at existing buildings
Make-ready spaces at existing buildings can be approved through a zoning permit if bulk and construction code requirements are met. existing buildings.
In force - New JerseyStatuteLead only
N.J.S. 45:22A-48.4 association charger right
Residential associations cannot bar a charger in a homeowner's designated parking space but may impose reasonable restrictions. HOA and condominium owners.
In force - New JerseyStatuteLead only
N.J.S. 48:25-2, 48:25-12 97% uptime for incentive-funded chargers
State-incentivized chargers must meet 97% uptime. public chargers.
In force - New JerseyStatuteLead only
N.J.S. 52:27D-141.11 builder charger offer
Developers of single-family homes with designated parking must offer to install a charger for the buyer. single-family new construction.
In force - New MexicoStatuteLead only
NMSA 62-3-4 resale of electricity as motor fuel
Non-utility entities reselling electricity as motor fuel are not public utilities. commercial and public chargers.
In force - New MexicoStatuteLead only
NMSA 62-8-12 utility transportation electrification
On PRC request, utilities must file applications to expand transportation electrification, which may include charging infrastructure. utility programs.
In force - New YorkCommission orderPartial
PSC Cases 18-E-0130, 14-E-0423, and 00-E-2054
Allows customer-sited batteries to join one utility's direct load control demand response through a bring-your-own-battery option. Requires utilities to report more data on longer-term demand response programs for storage.
Source: New York State Department of Public Service PSC Cases 18-E-0130, 14-E-0423, and 00-E-2054, Commission action Apr 16, 2026 (opens in a new tab)
Adopted Apr 16, 2026.
In force - New YorkRulePartial
Public Service Law Article VIII and 16 NYCRR Parts 1100, 1101, and 1102
Requires state siting permits for renewable facilities of 25 MW or more, including storage co-located with them. Standalone battery storage is excluded.
Source: New York State Department of Public Service Renewable energy siting regulatory documents page (opens in a new tab)
In force from Mar 9, 2026.
In force - New YorkRulePartial
NYS Standardized Interconnection Requirements
Requires utilities to use uniform interconnection procedures for distributed generation and energy storage systems of 5 MW or less. Requires UL 1741 SB certification for expedited review of inverter systems over 50 kW and up to 300 kW.
Source: New York State Department of Public Service New York State Standardized Interconnection Requirements (SIR) for distributed generators and energy storage systems 5 MW or less, effective Feb 9, 2026 (opens in a new tab)
In force from Feb 9, 2026.
In force - New YorkCode amendmentPartial
2025 Fire Code of New York State
Requires electrical energy storage systems to meet Section 1207 of the 2025 state Fire Code from Dec 31, 2025. The section reproduces material based on NFPA 855, 2023 edition.
Source: New York State Department of State 2025 Fire Code of New York State, Section 1207 (Electrical Energy Storage Systems), adopted Jul 25, 2025 (opens in a new tab)
In force from Dec 31, 2025.
In force - New YorkCode amendmentPartial
2025 Uniform Code and Energy Code update
Requires building permit applications filed from Dec 31, 2025 to follow the 2025 state building, residential, fire, and energy codes. Allowed either the 2020 or 2025 Uniform Code between the Oct 1, 2025 notice and that date.
Source: New York State Department of State 2025 Uniform Code and Energy Code update, 19 NYCRR Parts 1219-1229 and 1240; adopted Jul 25, 2025, amended Dec 5, 2025 (opens in a new tab)
In force from Dec 31, 2025.
In force - New YorkAgency guidancePartial
Inter-Agency Fire Safety Working Group
Studies battery storage fires and recommended fire code changes, which the state adopted Jul 25, 2025, effective Dec 31, 2025. Requires independent peer review for NYSERDA-supported projects, withholding incentives otherwise.
Source: NYSERDA NYSERDA, New York State Inter-Agency Fire Safety Working Group (opens in a new tab)
Adopted Jul 25, 2025. In force from Dec 31, 2025.
In force - New YorkRulePartial
1 RCNY 3616-07 with companion 1 RCNY 101-19
Requires indoor energy storage systems above 1 kWh, including in one- and two-family homes, to meet NFPA 855 (2020) as amended by the city. Requires storage filing, installation, and decommissioning to follow companion rule 101-19, which adopts UL 9540 and UL 9540A.
Source: NYC Department of Buildings 1 RCNY 3616-07 (NFPA 855 amendment) with companion 1 RCNY 101-19, effective Oct 26, 2025 (opens in a new tab)
In force from Oct 26, 2025.
In force - New YorkCommission orderPartial
PSC Case 18-E-0130, Mar 21, 2025 order
Funds 3,000 MW of bulk storage through Index Storage Credit solicitations with price and non-price scoring and duration categories. Requires funded lithium-ion projects of 600 kWh or more outside New York City to get preconstruction peer review.
Source: New York State Public Service Commission Order Approving Bulk Implementation Plan With Modifications, Mar 21, 2025 (opens in a new tab)
In force from Mar 21, 2025.
In force - New YorkCommission orderPartial
PSC Case 18-E-0130, Feb 13, 2025 action
Funds NYSERDA's retail and residential storage incentive programs by approving their implementation plan, toward 1,500 MW retail and 200 MW residential by 2030. Requires changes letting grid operator distributed resource participants qualify for retail incentives.
Source: New York State Department of Public Service PSC Case 18-E-0130, Commission action Feb 13, 2025, retail and residential energy storage program Implementation Plan (opens in a new tab)
Adopted Feb 13, 2025.
In force - New YorkRulePartial
PSC Case 15-M-0180
Requires residential and community solar providers to register with the Department, give a standard disclosure, and honor a three-day rescission right. Also requires truthful marketing, baseline savings forecasts, and prompt complaint responses.
Source: New York State Department of Public Service PSC Case 15-M-0180, Uniform Business Practices for Distributed Energy Resource Suppliers, effective Oct 27, 2024 (opens in a new tab)
In force from Oct 27, 2024.
In force - New YorkCommission orderPartial
PSC Case 18-E-0130, Jun 20, 2024 order
Funds a NYSERDA residential storage incentive for 200 MW and a retail storage incentive for 1,500 MW more by 2030. Requires three bulk storage procurements toward a 6 GW statewide goal.
Source: New York State Public Service Commission Order Establishing Updated Energy Storage Goal and Deployment Policy, Jun 20, 2024 (opens in a new tab)
In force from Jun 20, 2024.
In force - New YorkRulePartial
3 RCNY 608-01
Requires outdoor stationary battery systems in the city to keep 10-foot setbacks and requires FDNY permits for lithium-ion systems over 20 kWh. Also requires a certificate of fitness holder, remote monitoring, and warning signs for larger systems.
Source: Fire Department of the City of New York 3 RCNY 608-01 (FDNY, Outdoor Stationary Storage Battery Systems) (opens in a new tab)
In force from Oct 1, 2019.
In force - New YorkAgency guidancePartial
NYSERDA New York State Battery Energy Storage System Guidebook
Proposes a model local law that municipalities may adopt for permitting residential, commercial, and utility-scale battery storage. Local governments keep authority to review, approve, and permit projects.
Source: NYSERDA NYSERDA New York State Battery Energy Storage System Guidebook, including model law (opens in a new tab)
In forcePublished - New YorkStatuteLead only
Real Property Law 339-LL condominium EV charging
Condo associations cannot prohibit chargers in owners' spaces; owners use a licensed installer and carry insurance. condominium owners.
In force - New YorkStatuteLead only
Real Property Law 343 homeowners association EV charging
HOAs cannot bar chargers in a homeowner's designated space; owner pays installation and upkeep. HOA owners.
In force - New YorkBillLead only
S 787 (2025) NYPA EVolve NY wheelchair-accessible spaces
NYPA-involved public chargers must include, where feasible, a space for wheelchair-accessible EVs. public chargers.
In force - New YorkStatuteLead only
State Finance Law 19-A make-ready requirements
New publicly funded and non-residential parking must be make-ready (10% for 50-200 spaces, 20% above 200). commercial and public parking.
In force - New YorkLocal ordinancePartial
Town of North Hempstead Town Code Chapter 76
Requires town bodies to refuse to accept, review, or approve applications for battery energy storage facilities until Nov 18, 2026, unless extended.
Source: Town of North Hempstead Town Code, Chapter 76 (opens in a new tab)
In force - New YorkStatuteLead only
Vehicle and Traffic 1202 charging space and signage
Charging spaces limited to vehicles actively charging; permanent signage required. public chargers.
In force - New YorkBillLead only
S 801 (2025); Energy Law 104(9) EV-ready building standards
After Dec. 31, 2026, new buildings with off-street parking need EV-ready and installed charging spaces under code council specs. new construction.
Source: afdc.energy.gov (opens in a new tab)
Takes effect Dec 31, 2026.
Not yet in force - New YorkBillPartial
A10354B
Proposes a statewide virtual power plant program paying households and businesses whose batteries and other devices support the grid at peak. Proposes utility-filed compensation rates and streamlined interconnection for participants.
Source: New York State Senate A10354B, 2025-2026 session (GREAT Act) (opens in a new tab)
In committee since Jun 1, 2026.
Pending - New YorkBillLead only
NY S.8512-C / A.9111-C SUNNY Act
Would allow plug-in solar without utility approval; installers file an online form with the utility. 1,200 W; nationally recognized lab safety listing; takes effect immediately if signed.
Source: pv-magazine-usa.com (opens in a new tab)
Passed one chamber May 31, 2026.
Pending - New YorkBillPartial
S5781B / A6270C
Proposes requiring local authorities serving over 5,000 residents to adopt a no-cost automated residential solar permitting platform by Jun 30, 2027. Proposes optional storage coverage and remote inspections.
Source: New York State Senate S5781B / A6270C, 2025-2026 session (opens in a new tab)
In committee since May 28, 2026.
Pending - New YorkBillPartial
A6996
Proposes banning new battery energy storage siting, construction, and permits in Assembly District 64, except industrial zones and small residential uses, through Dec 31, 2034.
Source: New York State Senate A6996, 2025-2026 session (opens in a new tab)
In committee since May 18, 2026.
Pending - New YorkBillPartial
A8328
Proposes banning new battery energy storage siting, construction, and permits in Nassau and Suffolk counties, except industrial zones and small residential uses.
Source: New York State Senate A8328, 2025-2026 session (opens in a new tab)
In committee since May 18, 2026.
Pending - New YorkBillPartial
S2470 / A6198
Proposes a property tax abatement for electric energy storage equipment placed in service from Jan 1, 2027 until Jan 1, 2029. Each year's abatement would be the lesser of 10 percent of costs, taxes due, or $62,500.
Source: New York State Senate S2470 / A6198, 2025-2026 session (opens in a new tab)
Passed one chamber May 18, 2026.
Pending - New YorkBillPartial
S1385
Proposes raising the home solar tax credit from 25 to 40 percent, capped at $10,000 and refundable, with storage equipment counting. Proposes municipal permits for large renewable facilities, ending state override of local laws.
Source: New York State Senate S1385, 2025-2026 session (opens in a new tab)
In committee since Mar 18, 2026.
Pending - New YorkBillPartial
S1527A / A313A
Proposes exempting the sale, use, and installation of commercial energy storage equipment from state sales tax. Proposes adding storage to labor peace and prevailing wage provisions.
Source: New York State Senate S1527A / A313A, 2025-2026 session (opens in a new tab)
In committee since Mar 2, 2026.
Pending - New YorkBillPartial
A10268 / S8923
Proposes banning tier two storage systems, over 600 kWh, within 1,000 feet of residential zones, schools, or hospitals in cities of one million or more.
Source: New York State Senate A10268 / S8923, 2025-2026 session (opens in a new tab)
In committee since Feb 20, 2026.
Pending - New YorkBillPartial
S7197B / A6955C
Proposes 750-foot setbacks from residential property for battery storage systems of 3 MW or more, or 300 feet in cities of one million or more. Also proposes a public hearing before permitting and state model local laws.
Source: New York State Senate S7197B / A6955C, 2025-2026 session (opens in a new tab)
In committee since Feb 11, 2026.
Pending - New YorkBillPartial
A139
Proposes banning new battery energy storage siting, construction, and permits in Assembly District 63, except industrial zones and small residential uses, through Dec 31, 2034.
Source: New York State Senate A139, 2025-2026 session (opens in a new tab)
In committee since Jan 7, 2026.
Pending - New YorkBillPartial
S1502A / A7537
Proposes requiring solar panel and bulk storage battery makers to run free collection and recycling programs or lose sales rights. Proposes barring landfills, incinerators, and transfer stations from accepting these items.
Source: New York State Senate S1502A / A7537, 2025-2026 session (Responsible Renewable Energy Recycling Act) (opens in a new tab)
In committee since Jan 7, 2026.
Pending - New YorkBillPartial
S2170
Proposes directing the Commission within 120 days, and the Long Island authority within 180 days, to extend Value Stack compensation elements to behind-the-meter resources.
Source: New York State Senate S2170, 2025-2026 session (opens in a new tab)
In committee since Jan 7, 2026.
Pending - New YorkBillPartial
S5506 / A8378
Proposes state siting permits for grid-connected storage systems of 25 MW or more, with application fees of $25,000 to $100,000. Proposes excluding storage in cities of one million or more.
Source: New York State Senate S5506 / A8378, 2025-2026 session (opens in a new tab)
In committee since Jan 7, 2026.
Pending - New YorkBillPartial
S6557
Proposes banning new battery energy storage siting and construction on Staten Island, except in industrial zones and small residential uses, including pending applications.
Source: New York State Senate S6557, 2025-2026 session (opens in a new tab)
In committee since Jan 7, 2026.
Pending - New YorkBillPartial
S8645
Proposes letting the state siting office permit battery storage systems serving data centers. Proposes requiring data centers to file carbon reduction plans; storage permits would need plans using approved renewable or zero-carbon sources.
Source: New York State Senate S8645, 2025-2026 session (opens in a new tab)
In committee since Jan 7, 2026.
Pending - North CarolinaStatuteLead only
N.C.G.S. 136-18.02 highway rest stop charging
NCDOT may install and operate public chargers at state highway rest stops once a cost-recovery fee mechanism exists. public chargers.
In force - North CarolinaStatuteLead only
N.C.G.S. 20-305 dealer charging station purchase policy
Manufacturers may not require dealers to buy or lease charging stations unless they sell that manufacturer's EVs. commercial.
In force - North CarolinaStatuteLead only
N.C.G.S. 62-3.23 EV charging resale
A person reselling electricity via EV supply equipment is not a public utility, subject to conditions. commercial and public chargers.
In force - North DakotaStatutePartial
HB 1310 (2023), N.D.C.C. ch. 47-04.1 new section: EV charging station installation in condominiums
Creates a section of the condominium chapter letting unit owners apply to install EV charging stations; applications must be approved or denied in writing, with a penalty provision. residential, multifamily.
Source: ndlegis.gov (opens in a new tab)
“Owner applications for EV charging station installation must be approved or denied in writing.”
In force as of Apr 28, 2023.
In force - OhioCommission orderLead only
PUCO Case 20-434-EL-COI: EV charging providers not public utilities
Entities providing EV charging service to the public are not classified as public utilities. public chargers.
In force - OhioBillPartial
Ohio balcony solar bill (Reps. Rader and Glassburn)
Would set rules for plug-in balcony solar with a micro-inverter on a household outlet. Must meet National Electrical Code and certified testing standards.
Source: ohiohouse.gov (opens in a new tab)
Introduced Mar 11, 2026.
Pending - OklahomaStatuteLead only
Okla. Stat. tit. 68, 6508-6509: charger payment disclosure and inspection
Fee-charging stations above 50 kW must register, disclose rates on-site and online, allow metering audits; fines up to $500 per day. public chargers.
Source: afdc.energy.gov (opens in a new tab)
In force from Nov 1, 2021.
In force - OklahomaStatuteLead only
HB 2158 (2025), Okla. Stat. tit. 47, 565.22-565.23: manufacturer charger mandates on dealers
Manufacturers cannot require dealers to buy or lease chargers at dealer expense or require public availability, absent conditions. commercial.
In force - OklahomaStatuteLead only
Okla. Stat. tit. 17, 160.31-160.37 and OAC 165:35-13-1: utility and non-utility EV charging
Non-regulated retail EV charging is not a public utility; utility DC fast charging only via separate unregulated entity without cross-subsidy. public chargers.
In force - OklahomaStatuteLead only
Okla. Stat. tit. 40, 142.1-142.16: Alternative Fuels Technician Certification Act
Department of Labor certifies technicians and businesses installing or repairing EV charging infrastructure and adopts statewide codes and standards for EV charge stations. commercial, public chargers.
In force - OregonCode amendmentPartial
2026 Oregon Electrical Specialty Code
Adopts the 2026 National Electrical Code with Oregon amendments from Oct 1, 2026. Adding solar to a building with an existing system requires rapid shutdown for the existing system too. Oregon does not adopt NEC Section 706.7 on storage commissioning.
Source: Oregon Building Codes Division 2026 Oregon Electrical Specialty Code, Table 1-E (opens in a new tab)
In force from Oct 1, 2026.
In force - OregonCode amendmentPartial
2026 Oregon Residential Specialty Code
Adopts the 2026 Oregon Residential Specialty Code from Oct 1, 2026, and it becomes mandatory Apr 1, 2027. Builders may use the 2023 or 2026 code during the phase-in.
Source: Oregon Building Codes Division Oregon Residential Specialty Code adoption page (opens in a new tab)
In force from Oct 1, 2026.
In force - OregonCommission orderPartial
OPUC Order No. 26-368
Directs the three investor-owned utilities to add a single-disconnect option for net metering systems and a transfer trip description in their 2027 handbook updates. It also opened the formal interconnection rulemaking.
Source: Public Utility Commission of Oregon Order No. 26-368 (opens in a new tab)
Adopted Sep 30, 2026.
In force - OregonBillPartial
HB 4029
Requires residential solar sellers to use licensed installers and give a plain-language disclosure of up to four pages. Contracts must include required terms and allow cancellation within three business days. Utility interconnection approval must come before installation, and sellers must disclose storage capacity and keep production estimates within the inverter rating.
Source: Oregon State Legislature Oregon Laws 2026 (opens in a new tab)
Signed into law Mar 5, 2026. In force from Jun 5, 2026.
In force - OregonRulePartial
OAR chapter 330
Adds rebates for storage, including batteries added to existing home solar, installed by approved contractors. Batteries must be Listed to UL 1973, and storage systems Listed to UL 9540. The rules require one kilowatt of solar for every five kilowatt-hours of storage.
Source: Oregon Department of Energy Permanent Administrative Order DOE 1-2026 (opens in a new tab)
In force from Apr 29, 2026.
In force - OregonBillPartial
HB 3874
Raises the wind facility threshold for state site certificates to 100 megawatts. The siting law it amends defines battery energy storage systems and leaves them to local permits unless the developer or local government elects state review.
Source: Oregon State Legislature Oregon Laws 2025 (opens in a new tab)
Signed into law May 27, 2025. In force from Jan 1, 2026.
In force - OregonBillPartial
SB 827
Lets the state rebate program pay for solar, paired storage, and storage added to homes that already have solar. Contractors claim the rebates, must hold required licenses, and must pass the full rebate to customers. Residential storage rebates are capped at $2,500.
Source: Oregon State Legislature Oregon Laws 2025 (opens in a new tab)
Signed into law May 28, 2025. In force from Jan 1, 2026.
In force - OregonCode amendmentPartial
2025 Oregon Fire Code
Adopts the 2024 International Fire Code, as amended by the State Fire Marshal, as the 2025 Oregon Fire Code from Oct 1, 2025. Its Section 1207 covers battery energy storage systems.
Source: Oregon State Fire Marshal Oregon Fire Code page (opens in a new tab)
In force from Oct 1, 2025.
In force - OregonBillPartial
HB 2065
Requires utilities to offer microgrid applicants third-party studies, technical data within 21 days, free design feedback within 30 days, and 90-day decisions on qualifying applications. Excludes interconnections under federal jurisdiction.
Source: Oregon State Legislature Oregon Laws 2025 (opens in a new tab)
Signed into law Jul 17, 2025. In force from Sep 26, 2025.
In force - OregonBillPartial
HB 2066
Requires the utility commission to set a microgrid framework within 18 months, covering interconnection, safety standards, and compensation for excess energy sold to utilities. It also requires building code rules that support community microgrids and allows local microgrid zones.
Source: Oregon State Legislature Oregon Laws 2025 (opens in a new tab)
Signed into law Jul 17, 2025. In force from Sep 26, 2025.
In force - OregonLocal ordinancePartial
Marion County Ordinance 1480
Prohibits battery energy storage systems in every county zone, as the county describes the ordinance. The county applied it on Aug 1, 2025 to deny a 15-acre storage project in a farm zone.
Source: Marion County Planning Division Staff decision AR25-015 (opens in a new tab)
Adopted Jul 9, 2025.
In force - OregonCommission orderPartial
OPUC Order No. 24-448
Approves the three investor-owned utilities' small generator interconnection agreements, with changes. Nameplate rating for inverter-based units is the inverter's AC output rating. Customers with utility power purchase agreements may match the interconnection agreement term to that contract.
Source: Public Utility Commission of Oregon Order No. 24-448 (opens in a new tab)
Adopted and in force from Dec 19, 2024.
In force - OregonRulePartial
OAR chapter 860
Sets utility interconnection rules for small generators, and its definitions treat energy storage as part of a generator facility. Inverter-based units are sized by inverter AC rating, and limited export capacity can stand in for nameplate rating. Lab-tested equipment must meet IEEE 1547-2018 and carry laboratory certification.
Source: Oregon Secretary of State Oregon Administrative Rules Database (opens in a new tab)
In force from Apr 9, 2024.
In force - OregonCommission orderPartial
OPUC Docket AR 659
Adopted 2024 changes to the net metering and small generator interconnection rules. The changes move inverter requirements to IEEE 1547-2018 and UL 1741 SB, and add export control rules for projects with storage.
Source: Public Utility Commission of Oregon Docket AR 659 hearings report (opens in a new tab)
Adopted and in force from Apr 9, 2024.
In force - OregonStatutePartial
ORS 455.417 EV charging infrastructure in new construction
State building code must require newly constructed commercial buildings, multifamily buildings of five or more units, and mixed-use buildings to have EV charging capacity at no less than 20 percent of parking spaces, with conduit for Level 2. Townhouses excluded; municipalities may require more through land use. commercial, multifamily.
Source: oregon.public.law (opens in a new tab)
“Fractional numbers derived from a calculation of the vehicle parking spaces must be rounded up to the nearest whole number.”
In force Nov 6, 2017. In force from Sep 25, 2021.
In force - OregonRuleLead only
OAR 918-460-0200 EV charging station infrastructure requirements
Building Codes Division rule implementing the ORS 455.417 EV-ready requirement in the structural specialty code. commercial, multifamily.
In force - OregonStatutePartial
ORS 94.762 EV charging stations in planned communities
Owners may install a personal EV charging station despite contrary declaration terms; association must act on a complete application within 60 days; installer must be a licensed journeyman electrician at minimum. residential, planned communities.
Source: oregon.public.law (opens in a new tab)
“A pedestal, or similar, charging station that is hard-wired into the electrical system must be a certified electrical product”
In force - OregonProgram rulePartial
Oregon Solar + Storage Rebate Program
Pays rebates through approved contractors for home solar, up to $5,000, and storage at $300 per kilowatt-hour, up to $2,500. Lower-income homes get higher shares, and storage must be able to power the home in an outage. Funds from the Jun 15, 2026 reopening are fully reserved, so the program is closed.
Source: Oregon Department of Energy Solar + Storage Rebate Program for homeowners (opens in a new tab)
In force - OregonProgram rulePartial
Portland General Electric battery plan
Portland General Electric proposes making its home battery pilot an ongoing program open to small nonresidential customers. The request is part of a $35.3 million plan for 2027 and 2028.
Source: Public Utility Commission of Oregon Docket UM 2141 filing, Oct 15, 2026 (opens in a new tab)
Proposed Oct 15, 2026.
Pending - OregonRulePartial
OPUC Docket AR 688
Proposes updates to the small generator interconnection and net metering rules. Order No. 26-368 opened the formal rulemaking on Sep 30, 2026. Proposed changes include study deadlines, lower costs for late studies, and quarterly utility reporting.
Source: Public Utility Commission of Oregon Docket AR 688 (opens in a new tab)
Proposed Sep 30, 2026.
Pending - OregonRulePartial
OPUC Docket AR 681
Draft rulemaking on the microgrid framework that HB 2065 and HB 2066 require. Discussions are underway, and no formal rules have been proposed.
Source: Public Utility Commission of Oregon Rulemakings page (opens in a new tab)
PendingUnder review - OregonBillPartial
Oregon 2026R1 plug-in solar testimony
Public testimony on a plug-in solar measure appears on the Oregon legislature site for the 2026 regular session.
PendingIntroduced - OregonBillPartial
SB 1582
Would have required each electric company to run a distributed power plant program buying grid services from customer batteries and other resources. Purchases would have run through standard offer tariffs, with commission procurement targets and incentives.
Source: Oregon State Legislature Oregon Legislative Information System (opens in a new tab)
Did not pass Mar 6, 2026.
Did not pass - OregonBillPartial
HB 2064
Would have directed commission support for microgrids, building code rules for community microgrids, and local microgrid zones. HB 2066 enacted similar provisions in 2025.
Source: Oregon State Legislature Oregon Legislative Information System (opens in a new tab)
Did not pass Jun 27, 2025.
Did not pass - OregonBillPartial
HB 2566
Would have made stand-alone energy resilience projects eligible for state community renewable and resilient energy grants.
Source: Oregon State Legislature Oregon Legislative Information System (opens in a new tab)
Did not pass Jun 27, 2025.
Did not pass - OregonBillPartial
HB 3609
Would have required each electric company to run a distributed power plant program buying grid services from customer batteries and other distributed resources. The commission would have set procurement targets and performance incentives.
Source: Oregon State Legislature Oregon Legislative Information System (opens in a new tab)
Did not pass Jun 27, 2025.
Did not pass - OregonBillPartial
HB 3747
Would have created a refundable state income tax credit for buying battery storage and solar electric systems in tax years 2026 through 2031.
Source: Oregon State Legislature Oregon Legislative Information System (opens in a new tab)
Did not pass Jun 27, 2025.
Did not pass - OregonRulePartial
OAR 860-082-0060 and related Division 82 rules
Temporarily amended the Tier 4 interconnection review rule for generators up to 10 megawatts, from Apr 1 through Sep 4, 2026.
Source: Oregon Secretary of State Oregon Administrative Rules Database (opens in a new tab)
Ended Sep 4, 2026.
Expired - PennsylvaniaCommission orderPartial
PPL distributed energy resource management plan
Lets the utility expand its distributed energy resource management devices and manage smart inverter settings on customer solar and batteries under set conditions. It removes the yearly device cap and requires an aggregator procurement within 12 months.
Source: Pennsylvania Public Utility Commission Docket P-2024-3049223 (opens in a new tab)
Adopted Dec 3, 2025. In force from Jan 3, 2026.
In force - PennsylvaniaCode amendmentPartial
Uniform Construction Code update
Updates the Uniform Construction Code to nearly all provisions of the 2021 International Codes.
Source: Independent Regulatory Review Commission Regulation #12-125 (opens in a new tab)
In force from Jan 1, 2026.
In force - PennsylvaniaRuleLead only
52 Pa. Code 69.101 and 69.3501: EV charging not a public utility
Owner or operator of a public EV charging station is not a public utility; electric distribution companies must address third-party EV charging stations in their tariffs. public chargers.
In force - PennsylvaniaTariffPartial
PPL meter collar rule
Bars customer-owned meter collar adapters between the utility meter and the meter base. They are allowed only on a separate customer-owned meter base. Distributed energy systems connecting through a collar need an alternating current isolation device, and local inspectors must approve the collar.
Source: PPL Electric Utilities Rules for Electric Meter and Service Installations: Meter Collar Devices (opens in a new tab)
In force - PennsylvaniaProgram rulePartial
Solar for Schools grants
Funds grants to schools and colleges for solar energy systems, covering equipment, installation, permit fees, energy storage, and utility interconnection. Grants cover 50 to 75 percent of project cost, depending on the district's aid ratio.
Source: Pennsylvania Department of Community and Economic Development Solar for Schools Grant Program page (opens in a new tab)
In force - PennsylvaniaBillPartial
HB 2380 grid battery storage
As passed by the House, would require the state's largest electric utilities to install 3,500 megawatts of battery storage by 2035. The Public Utility Commission would set each utility's share from its load and peak demand.
Source: Pennsylvania House Democratic Caucus News release, Oct 5, 2026 (opens in a new tab)
Passed one chamber Oct 5, 2026.
Pending - PennsylvaniaBillPartial
HB 2264 virtual power plants
Would require major utilities to submit virtual power plant programs to the commission by Jul 1, 2027, paying opted-in households for grid services. Home batteries are among the devices such programs would dispatch at peak demand.
Source: Pennsylvania House Democratic Caucus News release on HB 2264 (opens in a new tab)
Passed one chamber Jun 16, 2026.
Pending - PennsylvaniaRulePartial
Distributed resources in wholesale markets
Proposes rules on how utilities coordinate with distributed energy resources that take part in wholesale electricity markets.
Source: Pennsylvania Public Utility Commission Docket L-2023-3044115 (opens in a new tab)
Proposed Apr 11, 2026.
Pending - PennsylvaniaRulePartial
Interconnection rules review
Starts work on a proposed rule to update how new electric load and distributed energy resources connect to utility distribution systems. The commission says its 2006 rules do not fully account for the growth of battery storage.
Source: Pennsylvania Public Utility Commission News release, Dec 18, 2025 (opens in a new tab)
Under review since Dec 18, 2025.
Pending - Rhode IslandStatuteLead only
R.I. Gen. Laws 42-140-11: charging fees on state property
Office of Energy Resources sets cost-recovery and idle fees for chargers on state property. public chargers.
Source: afdc.energy.gov (opens in a new tab)
In force from Jan 1, 2025.
In force - Rhode IslandStatuteLead only
R.I. Gen. Laws 31-28-11 and 31-28-12: EV charger make-ready for parking lots
New parking lots, and existing lots adding 50 percent or more spaces, must designate EV spaces, EV ready or capable with a dedicated 40-amp 208/240-volt circuit each; applies to publicly funded projects. commercial, public.
Source: afdc.energy.gov (opens in a new tab)
In force from Jan 1, 2024.
In force - Rhode IslandStatuteLead only
R.I. Gen. Laws 39-27.1-5: ENERGY STAR for residential EV chargers
EV chargers sold, leased, or rented in Rhode Island must be ENERGY STAR certified. residential.
Source: afdc.energy.gov (opens in a new tab)
In force from Jan 1, 2023.
In force - Rhode IslandStatuteLead only
R.I. Gen. Laws 31-21-18 and 31-41.1-4: EV charging space parking restriction
Vehicles may not park in EV-charging-only spaces unless connected; $100 fine. public chargers.
In force - Rhode IslandBillPartial
RI S 2359 / H 7269 portable solar devices
Defines portable solar devices and exempts them from permitting and utility-agreement processes meant for larger systems. UL or similar lab certification; anti-energizing feature during outage; no wattage cap in the press summary.
Source: rilegislature.gov (opens in a new tab)
Introduced Mar 12, 2026.
Pending - South CarolinaStatuteLead only
S.C. Code 58-27-1060 (SB 275, 2025): EV charger operators not public utilities
EV charger operators are not public utilities; power must come from an authorized utility; chargers must be immobile; utilities offering DC fast charging must give fair, nondiscriminatory rates. public chargers.
In force - South CarolinaCommission orderLead only
S.C. Code 58-27-265 and PSC Docket 2023-121-E: transportation electrification
PSC must open a docket on transportation electrification issues including charging infrastructure and report triennially. public chargers.
PendingIn committee - South DakotaStatuteLead only
S.D. Codified Laws 49-34-14 and 49-34A-116: EV charging station sellers not electric utilities
Businesses selling electricity solely for EV charging, bought from the local retail utility, are not electric utilities and are exempt from overcharge fines. public chargers.
In force - TennesseeStatuteLead only
Tennessee: EV chargers within TVA area not public utilities
Chargers providing electricity exclusively for EVs within TVA service area are not public utilities. public chargers.
In force - TexasRulePartial
30 TAC ch. 328
Requires recycling facilities handling wind, solar, and utility-scale battery components to file annual inventories and engineer cost estimates by Jan 15. They must hold financial assurance equal to 100 percent of the estimate, with the state as beneficiary; penalties are capped at $500 a day.
Source: Texas Secretary of State Texas Register, Sep 25, 2026 issue, adopted rules (opens in a new tab)
In force from Oct 1, 2026.
In force - TexasCode amendmentPartial
16 TAC 73.100
Requires electrical work to follow the 2026 National Electrical Code from Sep 1, 2026, with a limited exception for ground-fault protection on certain outdoor outlets.
Source: Texas Department of Licensing and Regulation 16 TAC 73.100 (2026 National Electrical Code adopted by TDLR), 51 TexReg 5776 (Aug 28, 2026) (opens in a new tab)
In force from Sep 1, 2026.
In force - TexasRulePartial
16 TAC 25.513
Funds grants or loans for islanding backup power packages at critical facilities that pair gas or propane generation with solar panels and batteries. Packages must serve one facility behind one meter, use approved vendors, and may not export or sell power to the grid.
Source: Texas Secretary of State, Texas Register 16 TAC 25.513 (Texas Energy Fund, Texas Backup Power Package Program), Project No. 59024; proposed 51 TexReg 13 (Jan 2, 2026); adopted in the May 22, 2026 Texas Register (opens in a new tab)
Adopted May 22, 2026.
In force - TexasAgency guidancePartial
TCEQ universal waste guidance
Explains that businesses may manage waste batteries as universal waste. They may store them for up to one year, must label them, and must keep them from leaking. Household waste is excluded.
Source: Texas Commission on Environmental Quality Texas Commission on Environmental Quality, Managing Hazardous Waste as Universal Waste (opens in a new tab)
Published Nov 7, 2025.
In force - TexasAgency guidancePartial
Austin Energy socket-mounted transfer switches
Allows socket-mounted transfer switch devices on the utility's approved list on 200-amp home services without a permit. Owners must register the device and have a field operations consultation. Other devices need utility approval first.
Source: Austin Energy Socket-mounted transfer switch devices page (opens in a new tab)
Published Oct 30, 2025.
In force - TexasBillPartial
HB 3228
Requires leases for solar power facilities, which the law defines to include battery storage, to provide for reuse or recycling and financial assurance. The assurance rests on an engineer's cost estimate and is due by lease end or the 20th anniversary of commercial operation, whichever is earlier.
Source: Texas Legislative Council, Texas Constitution and Statutes HB 3228, 89th Leg., R.S. (2025), Ch. 434; Tex. Util. Code chs. 301 and 302 (opens in a new tab)
Signed into law and in force from Sep 1, 2025.
In force - TexasBillPartial
HB 3229
Requires recycling facilities that accept wind, solar, and battery storage components to file annual inventories, recycling timelines, and engineer cost estimates with the state. They must also post financial assurance covering 100 percent of the estimated recycling or disposal cost.
Source: Texas Legislative Council, Texas Constitution and Statutes HB 3229, 89th Leg., R.S. (2025), Ch. 273; Tex. Health & Safety Code ch. 376 (opens in a new tab)
Signed into law and in force from Sep 1, 2025.
In force - TexasBillPartial
HB 3809
Requires landowner leases for battery storage facilities of 1 MWh or more to make the operator remove equipment and restore land. Operators must also provide financial assurance for removal costs, based on a licensed engineer's estimate, by the 15th year at the latest.
Source: Texas Legislative Council, Texas Constitution and Statutes HB 3809, 89th Leg., R.S. (2025), Ch. 281; Tex. Util. Code ch. 303 (opens in a new tab)
Signed into law and in force from Sep 1, 2025.
In force - TexasBillPartial
HB 3824
Requires battery energy storage facilities of 1 MWh or more that begin operating on or after Jan 1, 2027, to meet state fire safety standards. Standards follow NFPA 855 and UL 9540A; operators must keep site emergency plans, train responders, and get third-party fire inspections every five years.
Source: Texas Legislative Council, Texas Constitution and Statutes HB 3824, 89th Leg., R.S. (2025), Ch. 641; Tex. Util. Code ch. 187 (opens in a new tab)
Signed into law and in force from Sep 1, 2025.
In force - TexasBillPartial
SB 1202
Allows qualified third parties, including some master electricians, to review plans and inspect home backup power installations, such as batteries, instead of local officials. Requires local authorities to post requirements and fees and to issue permits within three business days after an approved review.
Source: Texas Legislative Council, Texas Constitution and Statutes SB 1202, 89th Leg., R.S. (2025), Ch. 804; Tex. Loc. Gov't Code 247.0025 (opens in a new tab)
Signed into law and in force from Sep 1, 2025.
In force - TexasBillPartial
SB 1252
Prohibits cities from regulating installation or inspection of home backup energy systems up to 50 kW output or 100 kWh storage, except city-owned utilities.
Source: Texas Legislative Council, Texas Constitution and Statutes SB 1252, 89th Leg., R.S. (2025), Ch. 356; Tex. Loc. Gov't Code 214.211, 214.214, 229.102 (opens in a new tab)
Became law without signature Jun 20, 2025. In force from Sep 1, 2025.
In force - TexasBillPartial
SB 2368
Requires ERCOT market participants to attest compliance with the foreign-adversary access law and report critical grid equipment purchases from covered companies. Allows commission penalties up to $1 million per violation; it names no specific product such as batteries or inverters.
Source: Texas Legislature Online SB 2368, 89th Leg., R.S. (2025), Ch. 1020; Tex. Util. Code 39.360, 15.023, 15.034, 15.035; Tex. Bus. & Com. Code 117.004 (opens in a new tab)
Signed into law and in force from Sep 1, 2025.
In force - TexasStatutePartial
Texas Occupations Code ch. 2311 and Utilities Code ch. 42 (SB 1001, 2023): EVSE registration and consumer rules
TDLR registers public commercial EV charging providers (per-port fee), requires price and surcharge disclosure, transaction summaries and records; operating rules apply to units installed on or after 2025-03-01 from 2026-03-01. Private home and reserved-use units exempt. public chargers.
Source: tdlr.texas.gov (opens in a new tab)
In force from Mar 1, 2025.
In force - TexasAgency guidancePartial
TDI Battery Energy Storage Systems FAQ
Explains that battery systems above the NFPA 855 thresholds must meet the 2020 edition of NFPA 855 where the State Fire Marshal has jurisdiction.
Source: Texas Department of Insurance, State Fire Marshal's Office TDI State Fire Marshal's Office, Battery Energy Storage Systems FAQ (page updated Feb 14, 2025) (opens in a new tab)
Published Feb 14, 2025.
In force - TexasTariffPartial
ERCOT Nodal Operating Guide Revision Request 245
Requires inverter-based resources and certain wind resources in ERCOT to meet voltage and frequency ride-through requirements consistent with or exceeding IEEE 2800-2022.
Source: Electric Reliability Council of Texas Market rules page for NOGRR 245 (opens in a new tab)
In force from Oct 1, 2024.
In force - TexasRulePartial
28 TAC 34.303 and related
Requires State Fire Marshal inspections to apply the 2021 editions of NFPA 1 (Fire Code) and NFPA 101 (Life Safety Code).
Source: Texas Department of Insurance, State Fire Marshal's Office 28 TAC 34.303 and related (State Fire Marshal inspection standards: NFPA 1 and NFPA 101, 2021 editions), eff. Sep 1, 2023 (opens in a new tab)
In force from Sep 1, 2023.
In force - TexasStatutePartial
Tex. Occ. Code 2311.001 (SB 1732, 2023): EV charging station connector standards
TDLR with TxDOT must adopt standards requiring a widely compatible connector type for publicly funded public stations installed after 2024-12-01. public chargers.
Source: texas.public.law (opens in a new tab)
“shall adopt standards for electric vehicle charging stations.”
In force from May 24, 2023.
In force - TexasStatutePartial
Tex. Bus. & Com. Code ch. 117
Prohibits agreements giving companies tied to China, Iran, North Korea, Russia, or designated countries access to or control of critical infrastructure, including electric grids. Warranty and support access is excepted; the utility commission may fine violators up to $1 million per violation.
Source: Texas Legislative Council, Texas Constitution and Statutes Tex. Bus. & Com. Code ch. 117 (Lone Star Infrastructure Protection Act), incl. 117.002 and 117.004 (opens in a new tab)
In force from Jun 18, 2021.
In force - TexasStatutePartial
Tex. Occ. Code ch. 1305
Requires a state license for electrical work and requires the state to adopt each new edition of the National Electrical Code as its electrical code. Cities may adopt local amendments and inspect electrical work.
Source: Texas Legislative Council, Texas Constitution and Statutes Tex. Occ. Code ch. 1305 (Electricians), incl. 1305.003, 1305.101, 1305.151, 1305.201 (opens in a new tab)
In force from Sep 1, 2017.
In force - TexasProgram rulePartial
PUCT Project No. 53911
Pilot that tests how aggregations of distributed energy resources at many metered sites take part in the ERCOT wholesale market. Its current governing document is Phase 3.3, dated Jun 3, 2026.
Source: Electric Reliability Council of Texas Aggregate Distributed Energy Resource pilot page (opens in a new tab)
In force - TexasRulePartial
TDI informal working draft
Informal working draft rules would move State Fire Marshal codes to the 2024 editions of NFPA 1 and NFPA 101. They would also carry out the 2025 battery facility law. Comments were due May 11, 2026.
Source: Texas Department of Insurance, State Fire Marshal's Office TDI informal working draft, 28 TAC 34.303, new 34.1001-34.1002 and 34.1301-34.1302 (comments due May 11, 2026) (opens in a new tab)
Under review since Apr 10, 2026.
Pending - TexasRulePartial
PUCT Project No. 54233
Proposes, as a staff discussion draft, new statewide interconnection rules for distributed energy resources, split at 250 kW, with updated inverter ride-through and certification standards. It would set study and agreement timelines, require published fee schedules, and move legacy resources to new requirements after specified changes.
Source: Public Utility Commission of Texas Staff discussion draft, Project 54233, Item 89 (opens in a new tab)
Under review since May 14, 2025.
Pending - TexasBillPartial
HB 1343
Proposes requiring a utility commission permit before installing wholesale battery storage in the ERCOT region, with fire-spread spacing and residential access siting rules. Applicants would identify and notify the likely first responder.
Source: Texas Legislature Online HB 1343, 89th Leg., R.S. (2025); proposed Tex. Util. Code 35.154 (opens in a new tab)
Did not pass - TexasBillPartial
HB 1378
Proposes requiring cities and counties to bar wholesale battery storage within 500 yards of others' property unless each affected owner consents in writing.
Source: Texas Legislature Online HB 1378, 89th Leg., R.S. (2025); proposed Tex. Loc. Gov't Code 247.004 (opens in a new tab)
Did not pass - TexasBillPartial
HB 2304
Proposes letting authorized third parties review plans and inspect home backup power installations without local submission, with permits issued within two business days.
Source: Texas Legislature Online HB 2304, 89th Leg., R.S. (2025); proposed Tex. Loc. Gov't Code 247.0025 (opens in a new tab)
Did not pass - TexasBillPartial
HB 3346
Proposes requiring utilities to allow certified customer-owned meter socket adapters and requiring expedited interconnection, including faster approval for systems under 50 kW. It would also make the aggregated distributed energy pilot permanent and require fair compensation for distributed resources' grid value.
Source: Texas Legislature Online HB 3346, 89th Leg., R.S. (2025); proposed Tex. Util. Code 17.011, 39.3515, 39.9155 (opens in a new tab)
Did not pass - TexasBillPartial
HB 3422
Proposes requiring landowner leases for battery storage generation assets to make operators remove equipment and restore land, with financial assurance by the 10th year.
Source: Texas Legislature Online HB 3422, 89th Leg., R.S. (2025); proposed Tex. Util. Code ch. 303 (opens in a new tab)
Did not pass - TexasBillPartial
HB 3493
Proposes barring cities from regulating installation or inspection of home backup energy systems up to 50 kW or 100 kWh, including through electrical code amendments.
Source: Texas Legislature Online HB 3493, 89th Leg., R.S. (2025); proposed Tex. Loc. Gov't Code 214.211, 214.214, 229.102 (opens in a new tab)
Did not pass - TexasBillPartial
HB 3905
Proposes barring utilities and retail providers from restricting customer-sited solar through size caps, extra standards, licensing demands, or owner-paid inspections, with 21-day interconnection decisions. It would also give customers a right to install emergency backup generation or storage meeting commission standards and building codes.
Source: Texas Legislature Online HB 3905, 89th Leg., R.S. (2025); proposed Tex. Util. Code 39.9162 (opens in a new tab)
Did not pass - TexasBillPartial
HB 4363
Proposes requiring a utility commission permit to connect wholesale battery storage to transmission, with state fire marshal standards on spacing, barriers, shutdown, and suppression. Operators would also need emergency plans, responder training, a first-year fire response deposit, and public awareness campaigns.
Source: Texas Legislature Online HB 4363, 89th Leg., R.S. (2025); proposed Tex. Util. Code 35.201-35.206 (opens in a new tab)
Did not pass - TexasBillPartial
HB 5482
Proposes requiring utility commission approval before wind, solar, or battery storage facilities connect to the ERCOT grid, with fire mitigation plans for batteries. Applications not decided within 180 days would be deemed approved.
Source: Texas Legislature Online HB 5482, 89th Leg., R.S. (2025); proposed Tex. Util. Code 35.201-35.203 (opens in a new tab)
Did not pass - TexasBillPartial
HB 5569
Proposes state fire marshal fire safety standards, based on NFPA 855, for grid battery storage approved for interconnection from Jan 1, 2027. Operators would need site emergency plans, free responder training, and fire inspections every three years; conflicting local rules would be void.
Source: Texas Legislature Online HB 5569, 89th Leg., R.S. (2025); proposed Tex. Util. Code ch. 187 (opens in a new tab)
Did not pass - TexasBillPartial
HB 5572
Proposes requiring utility commission approval, after a contested case, before a battery storage facility connects to the ERCOT grid, including a fire mitigation plan. Applications not decided within 180 days would be deemed approved.
Source: Texas Legislature Online HB 5572, 89th Leg., R.S. (2025); proposed Tex. Util. Code 35.201-35.203 (opens in a new tab)
Did not pass - TexasBillPartial
SB 1478
Proposes moving wind lease rules into a new chapter covering wholesale storage, solar, wind, and other renewables, requiring removal and land restoration terms. Financial assurance would go to the environmental commission within 30 days of the lease start, with release and forfeiture procedures.
Source: Texas Legislature Online SB 1478, 89th Leg., R.S. (2025); proposed Tex. Health & Safety Code ch. 375 (opens in a new tab)
Did not pass - TexasBillPartial
SB 1519
Proposes requiring a utility commission permit before installing wholesale battery storage in the ERCOT region, with fire-spread spacing and residential access siting rules. Applicants would identify and notify the likely first responder, and the county judge would be notified.
Source: Texas Legislature Online SB 1519, 89th Leg., R.S. (2025); proposed Tex. Util. Code 35.154 (opens in a new tab)
Did not pass - TexasBillPartial
SB 1824
Proposes requiring landowner leases for wholesale battery storage colocated with wind or solar to make operators remove equipment, recycle where practicable, and restore land. Operators would post engineer-based financial assurance by lease end or the 15th anniversary of commercial operation.
Source: Texas Legislature Online SB 1824, 89th Leg., R.S. (2025); proposed Tex. Util. Code ch. 303 (opens in a new tab)
Did not pass - TexasBillPartial
SB 1825
Proposes state fire marshal fire safety standards, based on NFPA 855 and UL 9540A, for grid battery storage approved for interconnection from Jan 1, 2027. Operators would need site emergency plans, free responder training, and fire inspections every three years; conflicting local rules would be void.
Source: Texas Legislature Online SB 1825, 89th Leg., R.S. (2025); proposed Tex. Util. Code ch. 187 (opens in a new tab)
Did not pass - TexasBillPartial
SB 2021
Proposes letting distributed energy resources, including home batteries, sell into the ERCOT wholesale market directly or through registered aggregations, meeting utility interconnection requirements. It would require commission rules on interconnection limits, cost recovery, and customer protections, and give buyers deceptive-practice protections.
Source: Texas Legislature Online SB 2021, 89th Leg., R.S. (2025); proposed Tex. Util. Code 31.002, 39.3514, 39.701, 39.9166 (opens in a new tab)
Did not pass - TexasBillPartial
SB 2659
Proposes requiring recycling facilities that accept wind, solar, and battery storage components to file annual inventories, timelines, and engineer cost estimates with the state. They would post financial assurance of 125 percent of estimated recycling cost, with penalties capped at $500 a day.
Source: Texas Legislature Online SB 2659, 89th Leg., R.S. (2025); proposed Tex. Health & Safety Code ch. 376 (opens in a new tab)
Did not pass - UtahStatutePartial
Utah H.B. 340 (2025) Solar Power Amendments
Defines portable solar generation devices (up to 1,200 W, plugged into a 120 V outlet) and exempts them from interconnection agreements, net metering, and utility approval or fees. 1,200 W max; NEC-compliant; UL or equivalent lab certification; anti-energizing feature during outage; utility not liable.
Source: le.utah.gov (opens in a new tab)
“a device or feature that prevents the system from energizing the building's electrical system during a power outage”
In force from May 7, 2025.
In force - UtahStatutePartial
Utah Code 57-8-8.2 EV charging systems in condominium associations
Associations may not bar an owner from installing a charging system in an assigned or exclusive-use parking space; may require application, licensed electrical contractor, code compliance, reasonable fees. Owner pays and must disclose to buyers. residential, condominium.
Source: le.utah.gov (opens in a new tab)
“A unit owner who installs a charging system shall disclose to a prospective buyer of the unit”
In force from May 3, 2023.
In force - VermontStatutePartial
Vermont S.202 (Act 149, 2026) plug-in photovoltaic devices
Lets customers use plug-in PV devices on a standard outlet with no interconnection agreement or utility approval; tenants must notify landlords. Up to 1,200 W combined inverter capacity per meter; UL 3700 or equivalent listing; anti-islanding; smart meters only; tenant gives landlord 10 days notice.
Source: legislature.vermont.gov (opens in a new tab)
“maximum combined inverter capacity of not more than 1,200 watts”
Enacted Jun 16, 2026. In force from Jul 1, 2026.
In force - VermontCode amendmentLead only
Vermont 2020 and 2024 commercial energy codes: EV charging requirements
Commercial energy codes contain EV charging provisions for new buildings (per Efficiency Vermont training listing). commercial.
In force - VermontBillPartial
S.271 (2023-24): right to charge electric vehicles at home
Would let residents install home EV charging despite association or lease restrictions. Referred to Senate Economic Development committee; hearings Feb-Mar 2024; no passage recorded. residential, multifamily.
Source: legislature.vermont.gov (opens in a new tab)
In committee since Jan 17, 2024.
Pending - VermontBillPartial
S.270 (2026 session) as introduced
Introduced 2026 bill surfaced by search; subject not confirmed. unknown.
PendingIntroduced - VirginiaStatutePartial
Va. Code 55.1-1962.1 EV charging stations, Condominium Act
Condo association may not bar a unit owner from installing a personal EV charging station in the unit or its limited common element parking space unless infeasible for safety, structural, or engineering reasons; owner pays, meters separately, insures. residential, condominium.
Source: law.lis.virginia.gov (opens in a new tab)
“Pay the costs of installation, maintenance, operation, and use of the electric vehicle charging station.”
In force - VirginiaStatutePartial
Va. Code 55.1-2139.1 EV charging stations, Real Estate Cooperative Act
Cooperative association may not bar a proprietary lessee from installing a personal EV charging station in the unit or appurtenant parking space, subject to feasibility and cost conditions. residential, cooperative.
Source: law.lis.virginia.gov (opens in a new tab)
“shall run with title to the unit to which the limited common element parking space is appurtenant”
In force - VirginiaStatutePartial
Virginia SB 250 (2026) small portable solar generation devices
Allows small portable solar devices without interconnection, net metering, utility approval or fees; utility must be notified before installation; localities and landlords limited from banning them. Passed the General Assembly 96-0 in March 2026; a news report says it was signed in April. 1,200 W max; NRTL certified; anti-export feature; 391 W or less exempt from some listing provisions; 7 days tenant notice.
In force - WashingtonRulePartial
Chapter 173-905 WAC
Requires producers of portable batteries to join approved stewardship plans from Jan 1, 2027, and adds medium format batteries in 2029. From Jan 1, 2028, retailers may not sell large format batteries without producer marking.
Source: Washington State Code Reviser Washington State Register, WSR 26-01-103 (opens in a new tab)
In force from Jan 16, 2026.
In force - WashingtonBillPartial
ESSB 5445
Lets small solar arrays under 1,000 square feet, parking-lot solar canopies, and landfill solar skip state environmental review. Storage that cuts system peak demand can count as demand response toward utility targets. Utilities may count new distributed generation in priority locations at four times its output through Dec 31, 2029.
Source: Washington State Legislature ESSB 5445 (2025 regular session), Chapter 265, Laws of 2025 (opens in a new tab)
Signed into law May 13, 2025. In force from Jul 27, 2025.
In force - WashingtonLocal ordinancePartial
Kitsap County Ordinance 639-2025
Pauses county acceptance of new battery storage system applications under a 365-day moratorium adopted Jun 11, 2025. An extension runs it to Dec 7, 2026.
Source: Kitsap County Department of Community Development Battery energy storage systems (opens in a new tab)
In force as of Jun 11, 2025.
In force - WashingtonTariffPartial
Puget Sound Energy Tariff WN U-60
Revises a utility's residential battery storage service schedule to remove limits on demand response participation and pay one enrollment incentive per battery. Adds another tariff schedule as a funding source for the program.
Source: Washington Utilities and Transportation Commission Docket UE-240333 (opens in a new tab)
In force from Jun 14, 2024.
In force - WashingtonStatutePartial
Chapter 19.95 RCW
Requires licensed contractors and detailed written contracts for solar installations over $1,000, including costs, production estimates, and battery component details. Gives buyers three business days to cancel, requires utility interconnection approval before installation, and bans deceptive solicitation.
Source: Washington State Legislature Chapter 19.95 RCW (opens in a new tab)
In force from Jun 6, 2024.
In force - WashingtonCode amendmentPartial
WAC 296-46B-705
Requires anyone connecting a power source to the grid to consult the serving utility and meet its standards. Sets wiring and disconnect rules for supply-side connections and requires design review for interconnected systems, including storage.
Source: Washington State Legislature WAC 296-46B-705 (opens in a new tab)
In force from Apr 1, 2024.
In force - WashingtonCode amendmentPartial
WAC 51-51-0328
Requires home storage systems to be Listed to UL 9540 and labeled for residential use, except systems under 1 kWh. Allows approved repurposed vehicle batteries outdoors with 5-foot spacing, and requires commissioning and handover of maintenance and decommissioning instructions.
Source: Washington State Legislature WAC 51-51-0328 (opens in a new tab)
In force from Mar 15, 2024.
In force - WashingtonCode amendmentPartial
WAC 51-54A-1207
Requires storage systems above set thresholds, such as 20 kWh for lithium-ion, to be Listed to UL 9540, with spacing and location limits. In homes, it caps units at 20 kWh, limits totals to 40 or 80 kWh by location, and bars installation in sleeping rooms.
Source: Washington State Legislature WAC 51-54A-1207 (opens in a new tab)
In force from Mar 15, 2024.
In force - WashingtonStatutePartial
Chapter 70A.555 RCW
Requires battery producers to fund collection programs for portable batteries from 2027 and medium format batteries up to 2,000 Wh from 2029. Requires producer marking on large format batteries, those over 2,000 Wh or 25 pounds, from Jan 1, 2028, and studies their end-of-life handling.
Source: Washington State Legislature Chapter 70A.555 RCW (opens in a new tab)
In force - WashingtonStatutePartial
Chapter 80.50 RCW
Allows stand-alone battery storage facilities to seek state site certification, which is optional. Storage proposed with a solar or wind project is reviewed with that project.
Source: Energy Facility Site Evaluation Council Battery energy storage systems (opens in a new tab)
In force - WashingtonStatutePartial
Chapter 80.60 RCW
Requires utilities to offer net metering for systems up to 100 kW until the earlier of Jun 30, 2029, or a 4 percent cap. Allows successor tariffs afterward, keeps credits for earlier customers, and bars utilities from restricting on-site storage.
Source: Washington State Legislature Chapter 80.60 RCW (opens in a new tab)
In force - WashingtonAgency guidancePartial
Department of Commerce
Gives local governments voluntary guidance on battery storage permits. It recommends state fire code compliance, systems Listed to UL 9540, site emergency plans, and funded decommissioning plans.
Source: Washington State Department of Commerce Battery energy storage resources for local governments and state agencies (opens in a new tab)
In forcePublished - WashingtonStatutePartial
RCW 64.90.513 EV charging stations, Uniform Common Interest Ownership Act
Associations may not effectively ban or unreasonably restrict personal EV charging in a unit or designated parking space; an application not denied in writing within 60 days is deemed approved; willful violation carries damages and up to $1,000 civil penalty. residential, common interest communities.
Source: app.leg.wa.gov (opens in a new tab)
“it is the policy of the state to promote, encourage, and remove obstacles to the use of electric vehicle charging stations.”
In force - WashingtonBillPartial
E3SHB 1960
Replaces property tax on solar, wind, and battery storage facilities of 10 MW or more with state and local excise taxes from 2028. Funds local investment distributions and requires a model siting ordinance; counties seeking those funds may not adopt stricter siting standards.
Source: Washington State Legislature E3SHB 1960 (2025-26 biennium, passed in the 2026 regular session), Chapter 260, Laws of 2026 (opens in a new tab)
Signed into law Apr 1, 2026. Takes effect Jan 1, 2028.
Not yet in force - WashingtonCode amendmentPartial
WSR 26-10-069
Proposes the 2024 International Fire Code as the state fire code. It replaces the prescriptive storage rules in Section 1207 with references to NFPA 855. It also adds a permit for storing lithium batteries over 15 cubic feet.
Source: Washington State Code Reviser Washington State Register, WSR 26-10-069 (opens in a new tab)
Proposed May 5, 2026.
Pending - WashingtonBillPartial
HB 1871
Would have offered incentives for grid-connected home batteries. A substitute cleared two House committees and stopped in the Appropriations Committee.
Source: Washington State Legislature HB 1871 (2025 regular session) (opens in a new tab)
Did not pass - WashingtonBillPartial
SB 5283
Would have barred the state siting council from preempting local laws that prohibit certain storage facilities in critical areas.
Source: Washington State Legislature SB 5283 (2025 regular session) (opens in a new tab)
Did not pass - WashingtonBillPartial
SB 5727
Would have paid one-time incentives for home batteries in a utility time-of-use or virtual power plant program. Incentives would have reached $765 per kWh for low- and moderate-income customers and $450 per kWh for others, up to 18 kWh.
Source: Washington State Legislature SB 5727 (2025 regular session) (opens in a new tab)
Did not pass - WashingtonBillPartial
SB 6008
Would have funded state grants to utilities for home battery incentives of up to $13,800 per low- or moderate-income customer. Utilities with over 100,000 customers would have needed flexible demand programs by Dec 31, 2026.
Source: Washington State Legislature SB 6008 (2026 regular session) (opens in a new tab)
Did not pass - WashingtonBillLead only
Washington plug-in solar bill (2026)
A plug-in solar bill was heard and opposed by utilities and an electrical workers union; reported stalled.
Did not pass - West VirginiaStatuteLead only
W. Va. Code 24-2D-1 to 24-2D-3: temporary EV charging not PSC-regulated
PSC lacks jurisdiction over temporary EV charging at events or emergencies; people using movable generators there are not public utilities. public chargers.
In force - WisconsinCode amendmentPartial
Wis. Admin. Code ch. SPS 316
Adopts the 2023 National Electrical Code with state changes for electrical work from Sep 1, 2026, replacing the 2017 edition.
Source: Wisconsin Department of Safety and Professional Services News release on the 2023 electrical code (opens in a new tab)
In force from Sep 1, 2026.
In force - WisconsinLocal ordinancePartial
Kenosha County storage moratorium
Pauses county review of new battery energy storage system permits and zoning approvals for 12 months from a May 19, 2026 vote. The county adopted a storage siting ordinance in Nov 2024.
Source: Kenosha County Battery Energy Storage System Ordinance page (opens in a new tab)
In force as of May 19, 2026.
In force - WisconsinAgency guidancePartial
PSC Application Filing Requirements: Solar Energy Projects
Lists what large solar projects must file, including setbacks, inverter details, decommissioning plans and costs, and plans for any co-located battery storage.
Source: Public Service Commission of Wisconsin Application Filing Requirements: Solar Energy Projects (opens in a new tab)
Published Oct 1, 2025.
In force - WisconsinAgency guidancePartial
Storage project filing requirements
Lists what storage projects seeking state approval must file. Applicants must cover fire suppression and detection, NFPA 855 and UL 9540 compliance, emergency plans, setbacks, and decommissioning costs.
Source: Public Service Commission of Wisconsin Application Filing Requirements: Energy Storage Projects (opens in a new tab)
In forcePublished - WisconsinRulePartial
Wis. Admin. Code ch. NR 673
Lets handlers manage hazardous waste batteries, such as lithium and lead-acid batteries, under the universal waste rules in ch. NR 673, which allow longer storage.
Source: Wisconsin Department of Natural Resources Universal waste page (opens in a new tab)
In force - WisconsinStatuteLead only
Wis. Stat. 16.9565 and 66.0442: government-owned chargers
State and local agencies may own fleet chargers; publicly available government chargers limited to free Level 1 or 2 unless via an authorized provider. public chargers.
In force - WisconsinStatuteLead only
Wis. Stat. 196.01(5): EV charging providers not public utilities
EV charging service providers are not public utilities and are not restricted from reselling electricity. public chargers.
In force - WisconsinStatutePartial
Wis. Stat. 196.491
Requires a state certificate of public convenience and necessity before a large electric generating facility is built. Commission filing guidance applies it to solar projects of 100 megawatts or more and to large storage projects.
Source: Public Service Commission of Wisconsin Application Filing Requirements: Solar Energy Projects (opens in a new tab)
In force - WisconsinStatuteLead only
Wis. Stat. 77.9971-77.9972: per-kWh excise tax on EV charging
3 cents per kWh excise tax on electricity sold at public chargers; operators must register with the Department of Revenue. public chargers.
In force - WisconsinRulePartial
Fire code review scope statement
Starts a rulemaking to update the state fire prevention code, which now references the 2012 edition of NFPA 1. The department may adopt the 2024 edition.
Source: Wisconsin Department of Safety and Professional Services Scope statement (opens in a new tab)
Under review since Nov 4, 2025.
Pending - WyomingStatuteLead only
Wyo. Stat. 37-1-101: EV charging station owners not public utilities
Entities that own, operate, lease or control EV charging stations are not public utilities. public chargers.
In force - WyomingBillLead only
Wyoming plug-in solar bill (2026)
Reported stalled or killed after utility testimony.
Did not pass
No laws match these filters. Try “All stages”.
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use