Codes of Record

Massachusetts

780 CMR 51.00

PartialRead in the state’s own source. It stays partial until the passage is on file word for word.

What does Massachusetts 780 CMR 51.00 do? Requires home energy storage to get building permits and inspections, follow the state electrical code, and have smoke and carbon monoxide alarms. Requires solar electrical work under the state electrical code and allows alternative ridge setbacks in sprinklered homes.

Facts

Kind
Code amendment
Status
In force
Stage
In force
Signed or decided
October 11, 2024
Effective
October 11, 2024
Topics
Fire protection and siting, Permitting
Products
Source
Board of Building Regulations and Standards (opens in a new tab)
Citation
Residential code chapter 3, tenth edition

The state’s codes

The codes that reach each product this law names, with the edition Massachusetts is on. Each links to the record.

For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use