Solar PV in Massachusetts
Which codes apply? In Massachusetts, solar PV systems fall under the 2026 NEC, the 2021 IRC, the 2021 IBC, and another model code in place of the IFC.
Codes that reach solar PV systems
The edition Massachusetts enforces for each code that governs the product, and the part of the code that does.
-
NECNational Electrical CodeThe Massachusetts NEC record2026 NECVerified
in force since Apr 24, 2026
Where it reaches the product. Article 690, solar photovoltaic systems, with 705 for the interconnection and 690.12 for rapid shutdown.
Massachusetts Electrical Code (527 CMR 12.00), 2026 edition · 527 CMR 12.00
-
IRCInternational Residential CodeThe Massachusetts IRC record2021 IRCVerified
in force since Oct 11, 2024
Where it reaches the product. Section R324, solar energy systems.
Massachusetts Residential Code (780 CMR 51.00), Tenth Edition, Residential Volume · 780 CMR 51.00, s. R101.1
The 2024 IRC is in development.
-
IBCInternational Building CodeThe Massachusetts IBC record2021 IBCVerified
in force since Oct 11, 2024
Where it reaches the product. Rooftop structures and the structural load of the array.
Massachusetts State Building Code, 780 CMR, Tenth Edition, Base Volume · 780 CMR (10th Edition Base Volume), s. 101.1
The 2024 IBC is in development.
-
IFCInternational Fire CodeThe Massachusetts IFC recordAnother model codeVerified
Where it reaches the product. Chapter 12, section 1205, solar photovoltaic power systems and roof access.
Massachusetts Comprehensive Fire Safety Code (527 CMR 1.00) · 527 CMR 1.00, ss. 1.04-1.05
The 2024 IFC is proposed.
Massachusetts laws that name solar PV systems
On the site: 13 laws, rules, orders, and bills, newest first.
| Law or rule | Kind | Stage | Date | What it does |
|---|---|---|---|---|
| 225 CMR 28.00 | Program rule | PartialIn force | Sep 11, 2026 | Pays solar incentives per kWh; systems of 25 kW AC or less get a flat $0.03 per kWh, or $0.06 for low-income customers. Source (opens in a new tab) |
| H.5641 | Bill | VerifiedPending | Aug 4, 2026 | Proposes allowing Becket to adopt a six-month moratorium on large-scale solar and battery storage, excluding batteries accessory to individual residential use. Source (opens in a new tab) |
| 225 CMR 29.00 | Rule | PartialIn force | Jul 1, 2026 | Requires local governments to accept consolidated permit applications by Oct 1, 2026 for solar under 25 MW and storage under 100 MWh. Source (opens in a new tab) |
| H.5175 | Bill | VerifiedPending | Jul 1, 2026 | An earlier House draft, H.5151, proposed a statewide storage incentive program and a state permitting platform for home solar and storage. Source (opens in a new tab) |
| H.5294 | Bill | PartialDid not pass | Jun 8, 2026 | Proposes a temporary moratorium on large ground-mounted solar and battery energy storage systems in the town of Worthington. Source (opens in a new tab) |
| 527 CMR 12.00 | Code amendment | PartialIn force | Apr 24, 2026 | Requires installations permitted after Apr 24, 2026 to meet the 2026 National Electrical Code with Massachusetts amendments. Source (opens in a new tab) |
| H.3467 | Bill | PartialDid not pass | Apr 6, 2026 | Proposes energy code rules requiring solar on new buildings, plus battery storage on new multifamily and commercial buildings up to six stories. Source (opens in a new tab) |
| H.4144 | Bill | PartialDid not pass | Apr 6, 2026 | Proposes a statewide solar incentive program set by regulation, state clean energy procurement that includes storage, and a state siting and permitting division. Source (opens in a new tab) |
| ConnectedSolutions small-scale battery program details | Program rule | PartialIn force | Mar 13, 2026 | Pays $275 per kW for behind-the-meter batteries of 50 kW or less that discharge during 30 to 60 summer peak events. Source (opens in a new tab) |
| Attorney General decision on the Town of Blandford's solar and battery storage moratorium | Agency guidance | PartialIn force | Mar 11, 2026 | Disapproved the town's temporary moratorium on large ground-mounted solar and battery storage, so it never took effect. Source (opens in a new tab) |
| 780 CMR 51.00 | Code amendment | PartialIn force | Oct 11, 2024 | Requires home energy storage to get building permits and inspections, follow the state electrical code, and have smoke and carbon monoxide alarms. Source (opens in a new tab) |
| St. 2024, c. 239, § 23 | Statute | PartialIn force | – | Local governments must decide consolidated permits for solar under 25 MW and storage under 100 MWh within 12 months. Source (opens in a new tab) |
| St. 2024, c. 239, § 74 | Statute | PartialIn force | – | Requires large clean energy facilities, including storage of 100 MWh or more, to get one consolidated permit from the Energy Facilities Siting Board. Source (opens in a new tab) |
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use