Interconnection devices in Oregon
Which codes apply? In Oregon, interconnection devices fall under the 2026 NEC and the 2024 IRC.
Codes that reach interconnection devices
The edition Oregon enforces for each code that governs the product, and the part of the code that does.
-
NECNational Electrical CodeThe Oregon NEC record2026 NECVerified
in force since Oct 1, 2026
Where it reaches the product. Article 705 for the point of connection, 230 for the service, and 702 for optional standby systems.
2026 Oregon Electrical Specialty Code · OAR 918-305-0100; Oregon amendments in OAR 918-305-0105 Table 1-E
-
IRCInternational Residential CodeThe Oregon IRC record2024 IRCVerified
in force since Oct 1, 2026
Where it reaches the product. Chapter 37 and the electrical provisions that mirror the NEC.
2026 Oregon Residential Specialty Code · OAR 918-480-0005
Oregon laws that name interconnection devices
On the site: nine laws, rules, orders, and bills, newest first.
| Law or rule | Kind | Stage | Date | What it does |
|---|---|---|---|---|
| OPUC Docket AR 688 | Rule | VerifiedPending | Sep 30, 2026 | Proposes updates to the small generator interconnection and net metering rules. Source (opens in a new tab) |
| OPUC Order No. 26-368 | Commission order | PartialIn force | Sep 30, 2026 | Directs the three investor-owned utilities to add a single-disconnect option for net metering systems and a transfer trip description in their 2027 handbook updates. Source (opens in a new tab) |
| OAR 860-082-0060 and related Division 82 rules | Rule | PartialExpired | Sep 4, 2026 | Temporarily amended the Tier 4 interconnection review rule for generators up to 10 megawatts, from Apr 1 through Sep 4, 2026. Source (opens in a new tab) |
| HB 4029 | Bill | PartialIn force | Jun 5, 2026 | Requires residential solar sellers to use licensed installers and give a plain-language disclosure of up to four pages. Source (opens in a new tab) |
| HB 2065 | Bill | PartialIn force | Sep 26, 2025 | Requires utilities to offer microgrid applicants third-party studies, technical data within 21 days, free design feedback within 30 days, and 90-day decisions on qualifying applications. Source (opens in a new tab) |
| HB 2066 | Bill | PartialIn force | Sep 26, 2025 | Requires the utility commission to set a microgrid framework within 18 months, covering interconnection, safety standards, and compensation for excess energy sold to utilities. Source (opens in a new tab) |
| OPUC Order No. 24-448 | Commission order | PartialIn force | Dec 19, 2024 | Approves the three investor-owned utilities' small generator interconnection agreements, with changes. Source (opens in a new tab) |
| OAR chapter 860 | Rule | PartialIn force | Apr 9, 2024 | Sets utility interconnection rules for small generators, and its definitions treat energy storage as part of a generator facility. Source (opens in a new tab) |
| OPUC Docket AR 659 | Commission order | PartialIn force | Apr 9, 2024 | Adopted 2024 changes to the net metering and small generator interconnection rules. Source (opens in a new tab) |
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use