Codes of Record

Oregon

OPUC Docket AR 688

PartialRead in the state’s own source. It stays partial until the passage is on file word for word.

What does Oregon OPUC Docket AR 688 do? Proposes updates to the small generator interconnection and net metering rules. Order No. 26-368 opened the formal rulemaking on Sep 30, 2026. Proposed changes include study deadlines, lower costs for late studies, and quarterly utility reporting.

Facts

Kind
Rule
Status
Proposed
Stage
Pending
Signed or decided
September 30, 2026
Topics
Interconnection, Tariffs and bill credits
Products
Source
Public Utility Commission of Oregon (opens in a new tab)
Citation
Docket AR 688

For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use