Codes of Record

Oregon

OPUC Docket AR 659

PartialRead in the state’s own source. It stays partial until the passage is on file word for word.

What does Oregon OPUC Docket AR 659 do? Adopted 2024 changes to the net metering and small generator interconnection rules. The changes move inverter requirements to IEEE 1547-2018 and UL 1741 SB, and add export control rules for projects with storage.

Facts

Kind
Commission order
Status
Adopted
Stage
In force
Effective
April 9, 2024
Topics
Interconnection, Tariffs and bill credits
Products
Source
Public Utility Commission of Oregon (opens in a new tab)
Citation
Docket AR 659 hearings report

For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use