Codes of Record

North Carolina

NFPA 855, Standard for the Installation of Stationary Energy Storage Systems
Not referenced

The effective date is not on file. Instrument: 2018 NC State Building Code: Fire Code.

Lead onlyA tracker lists this value.
Applies
Fire code predates NFPA 855, derived from the fire code edition
Instrument
2018 NC State Building Code: Fire Code
Citation
G.S. 143-138; S.L. 2025-2 s. 5.12(b)
Scope
Fire code predates NFPA 855
Amendments
Substantial
Read on
Oct 24, 2026 from 3 state pages
Transition rule
Not on file yet. Which permit date decides the edition is planned research.

What the record says

The passages that set the edition, quoted from the state’s own pages, each 30 words or fewer.

“The delayed effective date of this Rule is January 1, 2025.”

“The 2024 North Carolina State Building Code is effective on 7/1/25.”

“Until the official effective date is determined, the 2018 North Carolina State Building Code remains in effect.”

Exceptions and notes

2018 NC Fire Code (2015 IFC base) predates NFPA 855 in ch. 12. The 2024 NC Fire Code (2021 IFC base) is adopted but its effective date is deferred. NC amendments in the Fire Code volume; none checked.

Cross-check

What the code adoption trackers list for North Carolina. Where one differs, the state’s own record decides.

No tracker reading is on file for this value.

How North Carolina adopts the NFPA 855

Not yet researched.

History

Dated NFPA 855 actions on file for North Carolina.

No dated NFPA 855 action is on file for North Carolina yet.

For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use

These labels describe the state’s record on the date it was read. None of them is an approval from a state, a code publisher, or a local official.