Plug-in solar in California
Which codes apply? In California, plug-in solar falls under the 2023 NEC and the 2024 IRC.
Codes that reach plug-in solar
The edition California enforces for each code that governs the product, and the part of the code that does.
-
NECNational Electrical CodeThe California NEC record2023 NECVerified
in force since Jan 1, 2026
Where it reaches the product. Article 690 and 705 as written, which is why states write a statute to let the device plug in.
2025 California Electrical Code · Cal. Code Regs., tit. 24, pt. 3
The 2026 NEC is in development for January 1, 2029.
-
IRCInternational Residential CodeThe California IRC record2024 IRCVerified
in force since Jan 1, 2026
Where it reaches the product. Chapter 39, receptacles and branch circuits.
2025 California Residential Code · Cal. Code Regs., tit. 24, pt. 2.5
The 2027 IRC is in development for January 1, 2029.
California laws that name plug-in solar
On the site: one law or rule, newest first.
| Law or rule | Kind | Stage | Date | What it does |
|---|---|---|---|---|
| SB 868 Electricity: portable solar generation devices | Statute | VerifiedEnacted, not yet in force | Jan 1, 2027 | Lets a dwelling use plug-in solar devices without utility interconnection approval, fees or permission. Source (opens in a new tab) |
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use