Commercial and utility energy storage systems in California

Which codes apply? In California, commercial and utility energy storage systems fall under the 2023 NEC, the 2024 IFC, the 2024 IBC, and the 2023 NFPA 855.

Cabinets and containers at a business, a campus, or a substation. State record read Oct 24, 2026. Data as of Oct 26, 2026.

Codes that reach commercial and utility energy storage systems

The edition California enforces for each code that governs the product, and the part of the code that does.

  1. NECNational Electrical Code
    2023 NECVerified

    in force since Jan 1, 2026

    Where it reaches the product. Article 706, with 705 for the interconnection.

    2025 California Electrical Code · Cal. Code Regs., tit. 24, pt. 3

    The 2026 NEC is in development for January 1, 2029.

    The California NEC record
  2. IFCInternational Fire Code
    2024 IFCVerified

    in force since Jan 1, 2026

    Where it reaches the product. Chapter 12, section 1207, and the operational permit.

    2025 California Fire Code · Cal. Code Regs., tit. 24, pt. 9

    The 2027 IFC is in development for January 1, 2029.

    The California IFC record
  3. IBCInternational Building Code
    2024 IBCVerified

    in force since Jan 1, 2026

    Where it reaches the product. Occupancy, construction type, and separation for the building that holds the system.

    2025 California Building Code · Cal. Code Regs., tit. 24, pt. 2

    The 2027 IBC is in development for January 1, 2029.

    The California IBC record
  4. NFPA 855NFPA 855, Standard for the Installation of Stationary Energy Storage Systems
    2023 NFPA 855Verified

    in force since Jan 1, 2026 · Adopted directly

    Where it reaches the product. The whole standard: siting, size and separation, fire control, explosion control, and commissioning.

    2025 California Fire Code (Title 24, Part 9), based on the 2024 IFC · Cal. Code Regs. tit. 24, pt. 9

    The 2026 NFPA 855 is adopted, not yet in force for July 1, 2027.

    The California NFPA 855 record

California laws that name commercial and utility energy storage systems

On the site: 27 laws, rules, orders, and bills, newest first.

Law or ruleKindStageDateWhat it does
State Fire Marshal 2025 Intervening Cycle proposal for Part 9State Fire Marshal initial statement of reasons, 2025 Intervening CycleCode amendmentVerifiedEnacted, not yet in forceJul 1, 2027Adopts the most recent edition of NFPA 855 into the Fire Code's storage system rules, citing SB 283. Heard by the Building Standards Commission Aug 25 to 27, 2026; takes effect Jul 1, 2027. Source (opens in a new tab)
AB 1813Legislative update dated Sep 30, 2026BillPartialDid not passSep 30, 2026Concerned a customer renewable energy subscription program. Source (opens in a new tab)
AB 2493Legislative update dated Sep 30, 2026BillPartialIn forceSep 30, 2026Covers utility interconnection and a transmission development monitor at the Public Utilities Commission. Source (opens in a new tab)
AB 2369Legislative update dated Sep 27, 2026BillPartialDid not passSep 27, 2026Concerned energy storage and energy-only resources. Source (opens in a new tab)
SB 1295Analysis of Apr 9, 2026 version, hearing Apr 21, 2026BillPartialDid not passAug 13, 2026Proposed directing regulators to consider procurement strategies for distributed storage, amend storage tariffs by Jan 1, 2028, and let utilities earn returns on storage. Source (opens in a new tab)
2025 California Electrical CodeTitle 24 codes pageCode amendmentPartialIn forceJan 1, 2026Sets the statewide electrical code, with California amendments, effective Jan 1, 2026. Source (opens in a new tab)
2025 California Energy CodeBusiness Meeting backup packet, Jun 11, 2025, Docket 25-BSTD-02Code amendmentPartialIn forceJan 1, 2026Requires solar on new single-family, multifamily, and nonresidential buildings. Source (opens in a new tab)
2025 California Fire CodeState Battery Storage Safety Collaborative pageCode amendmentPartialIn forceJan 1, 2026Applies State Fire Marshal changes to Chapters 3, 12, and 80 of the California Fire Code to battery facilities from Jan 1, 2026. The changes were adopted Mar 7, 2025 and draw on the 2023 edition of NFPA 855. Source (opens in a new tab)
AB 1285Final disposition of 2025 billsBillPartialIn forceJan 1, 2026Covers State Fire Marshal guidance for lithium-ion battery facilities (Chapter 637, Statutes of 2025). Source (opens in a new tab)
SB 283Press release dated Oct 8, 2025BillPartialIn forceJan 1, 2026Requires battery storage developers to consult local fire authorities before applying and to pass a local fire safety inspection before operating. Source (opens in a new tab)
CPUC Decision D.25-12-003CPUC Decision D.25-12-003 (R.20-05-012)Commission orderPartialIn forceDec 4, 2025Closes ratepayer-funded self-generation incentives to new applications after Dec 30, 2025 and returns unallocated funds to ratepayers. Source (opens in a new tab)
AB 615Analysis of May 5, 2025 version, hearing Jul 7, 2025BillPartialDid not passOct 6, 2025Proposed requiring storage projects using state opt-in permitting to file emergency response and action plans, with local review of NFPA 855 setbacks. Source (opens in a new tab)
AB 1408Legislative update dated Oct 3, 2025BillPartialDid not passOct 3, 2025Proposed requiring utilities and the grid operator to evaluate and integrate surplus interconnection capacity on the transmission system. Source (opens in a new tab)
CPUC Rulemaking R.25-08-004Commission orderVerifiedPendingAug 20, 2025Studies refinements to Rule 21 interconnection rules for distributed energy resources at the large and small utilities. Source (opens in a new tab)
CPUC Resolution ESRB-13CPUC Resolution ESRB-13 (General Order 167-C)Commission orderPartialIn forceMar 13, 2025Requires energy storage owners to meet maintenance, operation, logbook, emergency planning, and incident reporting standards under General Order 167-C. Full requirements apply at 50 MW and above, and customer-sited storage is excluded. Source (opens in a new tab)
Distributed Electricity Backup Assets Program GuidelinesDistributed Electricity Backup Assets Program Guidelines, First Edition (CEC-300-2023-005), under AB 205 (2022)Program rulePartialIn forceOct 18, 2023Funds incentives for cleaner and more efficient distributed energy assets that provide on-call emergency supply or load reduction during extreme events. Source (opens in a new tab)
CPUC Emergency Load Reduction ProgramCPUC Emergency Load Reduction Program (pilot), most recently updated by D.23-12-005Program rulePartialIn forceMay 1, 2021Funds payments of $2 per kWh for nonresidential load reduction during grid emergencies, through 2027. Battery aggregators and exporting solar-plus-storage customers may take part. Source (opens in a new tab)
16 CCR Secs. 810, 832.10, and 832.46Order of AdoptionRulePartialIn force–Allows electrical contractors to install battery storage systems. Source (opens in a new tab)
2028 Energy Code rulemaking2028 Energy Code rulemaking, Docket 25-BSTD-03 (Title 24, Part 6)Code amendmentVerifiedPending–Studies updates to the Energy Code, which sets solar and battery requirements for new buildings. Source (opens in a new tab)
22 CCR Sec. 66261.9 and Div. 4.5, Ch. 2322 CCR Sec. 66261.9 and Title 22, Division 4.5, Chapter 23 (universal waste); authority Health and Safety Code Sec. 25259 (SB 489, Chapter 419, Statutes of 2015)RulePartialIn force–Allows solar modules, and batteries that are hazardous waste, to be managed as universal waste under simpler handling rules. Source (opens in a new tab)
AB 1104Analysis of May 5, 2025 version, hearing Jul 7, 2025BillPartialIn force–Allows net-metered solar and paired storage projects to keep tariff eligibility after a contractor's wage violation once workers are repaid and penalties paid. Source (opens in a new tab)
AB 205AB 205 (Ting), Chapter 61, Statutes of 2022; Pub. Res. Code Sec. 25545.1; 20 CCR Sec. 1882StatutePartialIn force–Allows storage projects of 200 MWh or more to seek state energy commission certification in lieu of local permits. Source (opens in a new tab)
AB 3032025 legislative summary, Nov 2025BillPartialDid not pass–Proposed barring approval of projects with 200 MWh or more of battery storage within 3,200 feet of sensitive receptors or on sensitive sites. Source (opens in a new tab)
AB 4342025 legislative summary, Nov 2025BillPartialDid not pass–Proposed removing battery storage from the state opt-in permitting process and barring new battery facility approvals until Jan 1, 2028, pending fire standards. Source (opens in a new tab)
Electric Rule 21Electric Rule 21 (PG&E, SCE, and SDG&E tariffs)TariffPartialIn force–Requires customers installing generation or storage on their premises to meet the large utilities' interconnection, operating, and metering requirements. Source (opens in a new tab)
SB 1383SB 283 analysis, existing law sectionStatutePartialIn force–Requires energy storage systems, including third-party-owned systems, to meet the commission's operation and maintenance standards, and expands commission audits and inspections of storage facilities. Source (opens in a new tab)
SB 38Analysis of Mar 22, 2023 versionStatutePartialIn force–Requires each battery energy storage facility in the state to have an emergency response plan and an emergency action plan covering its premises. Source (opens in a new tab)

Every California law on commercial and utility energy storage systems, with filters