EV charging in California
Which codes apply? In California, EV charging equipment falls under the 2023 NEC, the state’s own code in place of the IECC commercial, the state’s own code in place of the IECC residential, and the 2024 IBC.
Codes that reach EV charging equipment
The edition California enforces for each code that governs the product, and the part of the code that does.
-
NECNational Electrical CodeThe California NEC record2023 NECVerified
in force since Jan 1, 2026
Where it reaches the product. Article 625, electric vehicle power transfer systems.
2025 California Electrical Code · Cal. Code Regs., tit. 24, pt. 3
The 2026 NEC is in development for January 1, 2029.
-
IECC commercialInternational Energy Conservation Code, commercialThe California IECC commercial recordState’s own codeVerified
Where it reaches the product. EV-capable and EV-ready parking spaces in the commercial energy code.
2025 California Energy Code · Cal. Code Regs., tit. 24, pt. 6
The next IECC edition is in development for January 1, 2029.
-
IECC residentialInternational Energy Conservation Code, residentialThe California IECC residential recordState’s own codeVerified
Where it reaches the product. Where a state adopts the EV-ready appendix for homes.
2025 California Energy Code · Cal. Code Regs., tit. 24, pt. 6
The next IECC edition is in development for January 1, 2029.
-
IBCInternational Building CodeThe California IBC record2024 IBCVerified
in force since Jan 1, 2026
Where it reaches the product. Parking structures, ventilation, and accessible routes to chargers.
2025 California Building Code · Cal. Code Regs., tit. 24, pt. 2
The 2027 IBC is in development for January 1, 2029.
California laws that name EV charging equipment
On the site: six laws, rules, orders, and bills, newest first.
| Law or rule | Kind | Stage | Date | What it does |
|---|---|---|---|---|
| H&S Code 44268 and 44268.2 (open access and payment standards) | Statute | Lead onlyIn force | Sep 27, 2024 | Public chargers: no membership or subscription required, price disclosed at point of sale, contactless/phone payment, OCPP billing, data reporting; DC fast chargers must support Plug and Charge. Source (opens in a new tab) |
| Gov. Code 65850.7 and 65850.71 (expedited EV charger permitting) | Statute | Lead onlyIn force | Sep 25, 2024 | Cities and counties must adopt streamlined permitting for chargers with deemed approval; deadlines Sept 30 2025 for jurisdictions over 250,000 population and Sept 30 2028 for smaller ones. Source (opens in a new tab) |
| CALGreen (Title 24 Part 11) EV charger building standards; H&S Code 18941.10, 18941.11, 18941.17 | Code amendment | Lead onlyIn force | Sep 16, 2022 | New single-family and townhomes need conduit for Level 2; new multifamily and hotels need 40% of spaces EV-capable and 10% with Level 2 chargers; public lots have tiered EV-capable and installed-charger minimums plus accessibility counts. Source (opens in a new tab) |
| CEC EV charger reliability and data standards regulations (AB 2061) | Rule | PartialIn force | – | 97 percent uptime for publicly funded DC fast chargers installed on or after 2024-01-01; networked chargers installed on or after 2026-09-28 must use OCPP 2.0.1. Excludes single-family homes and multifamily under four units. Source (opens in a new tab) |
| Civ. Code 1947.6 (tenant EV charging) | Statute | PartialIn force | – | Tenants may request a charging station at their parking space; landlord must approve a reasonable request but need not provide a space. Source (opens in a new tab) |
| Civ. Code 4745 (HOA/common interest right to charge) | Statute | PartialIn force | – | Associations may not prohibit or unreasonably restrict an owner from installing an EV charging station in the owner's parking space or common area; owner pays cost and insurance. Source (opens in a new tab) |
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use