Inverters and power control in Arizona
Which codes apply? In Arizona, inverters and power control systems fall under local adoption of the NEC and local adoption of the IECC residential.
Codes that reach inverters and power control systems
The edition Arizona enforces for each code that governs the product, and the part of the code that does.
-
NECNational Electrical CodeThe Arizona NEC recordLocal adoptionVerified
Where it reaches the product. Article 705, interconnected power sources, with 690 and 706 for the source and the listing the inverter must carry.
A.R.S. 9-802 (municipal adoption by reference); A.R.S. 11-861 (county adoption by reference); A.R.S. 34-461 (public buildings)
-
IECC residentialInternational Energy Conservation Code, residentialThe Arizona IECC residential recordLocal adoptionPartial
Where it reaches the product. Where a state adopts the solar-ready or storage-ready appendix, the space and the conduit the inverter needs.
A.R.S. 9-802 (municipal adoption by reference); A.R.S. 11-861 (county adoption by reference); A.R.S. 34-461 (public buildings)
Arizona laws that name inverters and power control systems
On the site: four laws, rules, orders, and bills, newest first.
| Law or rule | Kind | Stage | Date | What it does |
|---|---|---|---|---|
| SB 1419 | Bill | PartialIn force | Sep 12, 2026 | Requires residential solar contracts to disclose costs, savings assumptions, and warranties, including inverter and battery warranties. Source (opens in a new tab) |
| HB 2134 | Bill | PartialDid not pass | – | Would have barred utilities and public bodies from connecting certain equipment from Chinese companies to critical infrastructure. Source (opens in a new tab) |
| Salt River Project requirements | Program rule | PartialIn force | – | Requires battery systems in Salt River Project's residential program to be Listed to UL 9540, with inverters that meet UL 1741 and IEEE 1547. Customers must take a customer generation price plan and sign an interconnection agreement. Source (opens in a new tab) |
| Tucson Electric Power interconnection | Program rule | PartialIn force | – | Requires utility approval before construction and permission to operate before a home solar or storage system is energized. Source (opens in a new tab) |
Every Arizona law on inverters and power control systems, with filters
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use