Tucson Electric Power interconnection
Partial
What does Arizona Tucson Electric Power interconnection do? Requires utility approval before construction and permission to operate before a home solar or storage system is energized. Inverters must meet IEEE 1547 and be Listed to UL 1741, and storage follows the utility's SR-710 requirements. Applications filed before Oct 1 each year lock in the Resource Comparison Proxy export rate then in effect.
Facts
- Kind
- Program rule
- Status
- In force
- Stage
- In force
- Topics
- Interconnection, Tariffs and bill credits, Meter socket adapters
- Products
- Source
- Tucson Electric Power (opens in a new tab)
- Citation
- Residential interconnection
The state’s codes
The codes that reach each product this law names, with the edition Arizona is on. Each links to the record.
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use