Tucson Electric Power interconnection

PartialRead in the state’s own source. It stays partial until the passage is on file word for word.

What does Arizona Tucson Electric Power interconnection do? Requires utility approval before construction and permission to operate before a home solar or storage system is energized. Inverters must meet IEEE 1547 and be Listed to UL 1741, and storage follows the utility's SR-710 requirements. Applications filed before Oct 1 each year lock in the Resource Comparison Proxy export rate then in effect.