Interconnection devices in Arizona
Which codes apply? In Arizona, interconnection devices fall under local adoption of the NEC and local adoption of the IRC.
Codes that reach interconnection devices
The edition Arizona enforces for each code that governs the product, and the part of the code that does.
-
NECNational Electrical CodeThe Arizona NEC recordLocal adoptionVerified
Where it reaches the product. Article 705 for the point of connection, 230 for the service, and 702 for optional standby systems.
A.R.S. 9-802 (municipal adoption by reference); A.R.S. 11-861 (county adoption by reference); A.R.S. 34-461 (public buildings)
-
IRCInternational Residential CodeThe Arizona IRC recordLocal adoptionVerified
Where it reaches the product. Chapter 37 and the electrical provisions that mirror the NEC.
A.R.S. 9-802 (municipal adoption by reference); A.R.S. 11-861 (county adoption by reference); A.R.S. 34-461 (public buildings)
Arizona laws that name interconnection devices
On the site: two laws, rules, orders, and bills, newest first.
| Law or rule | Kind | Stage | Date | What it does |
|---|---|---|---|---|
| Salt River Project requirements | Program rule | PartialIn force | – | Requires battery systems in Salt River Project's residential program to be Listed to UL 9540, with inverters that meet UL 1741 and IEEE 1547. Customers must take a customer generation price plan and sign an interconnection agreement. Source (opens in a new tab) |
| Tucson Electric Power interconnection | Program rule | PartialIn force | – | Requires utility approval before construction and permission to operate before a home solar or storage system is energized. Source (opens in a new tab) |
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use