Interconnection devices in Texas

Which codes apply? In Texas, interconnection devices fall under the 2026 NEC and the 2012 IRC (local option).

Backup switches, gateways, meter adapters, and the device that islands a home. State record read Oct 18, 2026. Data as of Oct 26, 2026.

Codes that reach interconnection devices

The edition Texas enforces for each code that governs the product, and the part of the code that does.

  1. NECNational Electrical Code
    2026 NECVerified

    in force since Sep 1, 2026

    Where it reaches the product. Article 705 for the point of connection, 230 for the service, and 702 for optional standby systems.

    2026 National Electrical Code (Texas state electrical code) · 16 Tex. Admin. Code §73.100; Tex. Occ. Code §1305.101(a)(2)

    The Texas NEC record
  2. IRCInternational Residential Code
    2012 IRCVerified

    in force since Jan 1, 2022 · Local adoption

    Where it reaches the product. Chapter 37 and the electrical provisions that mirror the NEC.

    International Residential Code, as it existed on May 1, 2012 (municipal residential building code) · Tex. Local Gov’t Code §214.212

    The Texas IRC record

Texas laws that name interconnection devices

On the site: seven laws, rules, orders, and bills, newest first.

Law or ruleKindStageDateWhat it does
16 TAC 25.51316 TAC 25.513 (Texas Energy Fund, Texas Backup Power Package Program), Project No. 59024; proposed 51 TexReg 13 (Jan 2, 2026); adopted in the May 22, 2026 Texas RegisterRulePartialIn forceMay 22, 2026Funds grants or loans for islanding backup power packages at critical facilities that pair gas or propane generation with solar panels and batteries. Source (opens in a new tab)
PUCT Project No. 54233Staff discussion draft, Project 54233, Item 89RulePartialPendingMay 14, 2025Proposes, as a staff discussion draft, new statewide interconnection rules for distributed energy resources, split at 250 kW, with updated inverter ride-through and certification standards. Source (opens in a new tab)
HB 3346HB 3346, 89th Leg., R.S. (2025); proposed Tex. Util. Code 17.011, 39.3515, 39.9155BillPartialDid not pass–Proposes requiring utilities to allow certified customer-owned meter socket adapters and requiring expedited interconnection, including faster approval for systems under 50 kW. Source (opens in a new tab)
HB 3905HB 3905, 89th Leg., R.S. (2025); proposed Tex. Util. Code 39.9162BillPartialDid not pass–Proposes barring utilities and retail providers from restricting customer-sited solar through size caps, extra standards, licensing demands, or owner-paid inspections, with 21-day interconnection decisions. Source (opens in a new tab)
HB 5569HB 5569, 89th Leg., R.S. (2025); proposed Tex. Util. Code ch. 187BillPartialDid not pass–Proposes state fire marshal fire safety standards, based on NFPA 855, for grid battery storage approved for interconnection from Jan 1, 2027. Operators would need site emergency plans, free responder training, and fire inspections every three years; conflicting local rules would be void. Source (opens in a new tab)
SB 1825SB 1825, 89th Leg., R.S. (2025); proposed Tex. Util. Code ch. 187BillPartialDid not pass–Proposes state fire marshal fire safety standards, based on NFPA 855 and UL 9540A, for grid battery storage approved for interconnection from Jan 1, 2027. Operators would need site emergency plans, free responder training, and fire inspections every three years; conflicting local rules would be void. Source (opens in a new tab)
SB 2021SB 2021, 89th Leg., R.S. (2025); proposed Tex. Util. Code 31.002, 39.3514, 39.701, 39.9166BillPartialDid not pass–Proposes letting distributed energy resources, including home batteries, sell into the ERCOT wholesale market directly or through registered aggregations, meeting utility interconnection requirements. Source (opens in a new tab)

Every Texas law on interconnection devices, with filters