PUCT Project No. 54233
Partial
What does Texas PUCT Project No. 54233 do? Proposes, as a staff discussion draft, new statewide interconnection rules for distributed energy resources, split at 250 kW, with updated inverter ride-through and certification standards. It would set study and agreement timelines, require published fee schedules, and move legacy resources to new requirements after specified changes.
Facts
- Kind
- Rule
- Status
- Under review
- Stage
- Pending
- Signed or decided
- May 14, 2025
- Topics
- Interconnection, Meter socket adapters
- Products
- Source
- Public Utility Commission of Texas (opens in a new tab)
- Citation
- Staff discussion draft, Project 54233, Item 89
The state’s codes
The codes that reach each product this law names, with the edition Texas is on. Each links to the record.
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use