Plug-in solar in South Dakota

Which codes apply? In South Dakota, plug-in solar falls under the 2023 NEC and the 2024 IRC (local option).

A small array with its own inverter that plugs into an ordinary outlet. State record read Oct 20, 2026. Data as of Oct 26, 2026.

Codes that reach plug-in solar

The edition South Dakota enforces for each code that governs the product, and the part of the code that does.

  1. NECNational Electrical Code
    2023 NECVerified

    in force since Nov 12, 2024

    Where it reaches the product. Article 690 and 705 as written, which is why states write a statute to let the device plug in.

    2023 National Electrical Code (South Dakota, ARSD 20:44:14:01) · ARSD 20:44:14:01(11)

    The South Dakota NEC record
  2. IRCInternational Residential Code
    2024 IRCVerified

    in force since Jul 1, 2026 · Local adoption

    Where it reaches the product. Chapter 39, receptacles and branch circuits.

    2024 International Residential Code (optional municipal adoption, SDCL 11-10-12) · SDCL 11-10-12 (as amended by SL 2026 ch 59)

    The South Dakota IRC record

South Dakota laws that name plug-in solar

Statutes, rules, and commission orders are tracked state by state.

No South Dakota law or rule on the site names plug-in solar. The product page shows the states that have one.

For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use