Codes of Record

What applies to my job?

Pick the state and the product you build, install, or inspect. The card below answers from each state’s own record.

Plug-in solar in District of Columbia

Which codes apply? In District of Columbia, plug-in solar falls under the 2014 NEC and the 2015 IRC.

A small array with its own inverter that plugs into an ordinary outlet. State record read Oct 20, 2026. Data as of Oct 26, 2026.

Codes that reach plug-in solar

The edition District of Columbia enforces for each code that governs the product, and the part of the code that does.

  1. NECNational Electrical Code
    2014 NECVerified

    in force since May 29, 2020

    Where it reaches the product. Article 690 and 705 as written, which is why states write a statute to let the device plug in.

    2017 District of Columbia Electrical Code · 12-C DCMR (2017-12-C90 et seq.)

    The next NEC edition is in development.

    The District of Columbia NEC record
  2. IRCInternational Residential Code
    2015 IRCVerified

    in force since May 29, 2020

    Where it reaches the product. Chapter 39, receptacles and branch circuits.

    2017 District of Columbia Residential Code · 12-B DCMR (2017-12-B101 et seq.)

    The 2024 IRC is in development.

    The District of Columbia IRC record

District of Columbia laws that name plug-in solar

On the site: one law or rule, newest first.

Law or ruleKindStageDateWhat it does
B26-0602 plug-in solarbrightsaver.orgBillLead onlyPending–Council bill on plug-in solar; tracker says in progress. Source (opens in a new tab)

Every District of Columbia law on plug-in solar, with filters

For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use