Codes of Record

New York

S 801 (2025); Energy Law 104(9) EV-ready building standards

Lead onlyFound in a tracker or press source. Nobody has checked it against the state’s own record yet.

What does New York S 801 (2025); Energy Law 104(9) EV-ready building standards do? After Dec. 31, 2026, new buildings with off-street parking need EV-ready and installed charging spaces under code council specs. new construction.

Facts

Kind
Bill
Status
Enacted
Stage
Not yet in force
Effective
December 31, 2026
Topics
EV-ready buildings
Products
Source
afdc.energy.gov (opens in a new tab)

The state’s codes

The codes that reach each product this law names, with the edition New York is on. Each links to the record.

For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use