International Energy Conservation Code, residential
Massachusetts enforces the 2021 IECC residential
The 2021 International Energy Conservation Code (IECC) for residential buildings has been in force in Massachusetts since Oct 11, 2024. It applies statewide. Adopted by Board of Building Regulations and Standards (BBRS), in consultation with the Department of Energy Resources (DOER). The legal citation is 780 CMR Chapter 11R.
Record of adoption
Edition in force
2021 IECC
Massachusetts base energy code, 780 CMR Chapter 11R (residential)
Verified
- In force since
- Legal citation
- 780 CMR Chapter 11R
- Adopted by
- Board of Building Regulations and Standards (BBRS), in consultation with the Department of Energy Resources (DOER)
- Second reading
- Applies
- Statewide
- Also called
- Base Energy Code, Stretch Energy Code (225 CMR Chapter 22), Specialized Opt-in Code (225 CMR Chapter 22 + Appendix RC)
DOER names the base code as IECC 2021 with MA amendments; the effective date is that of the 10th Edition (concurrency with the 9th Edition ended Jun 30, 2025).
Exceptions
- Municipalities may opt in to the Stretch Energy Code (225 CMR Chapter 22) or the Specialized Opt-in Code (225 CMR Chapter 22 + Appendix RC), both promulgated by DOER (G.L. c. 25A, s. 6(14); G.L. c. 143, s. 96).
- Up to ten municipalities in DOER’s Fossil Fuel Free Building Demonstration Program (St. 2022, c. 179, s. 84; 225 CMR 24.00) may restrict fossil fuels in new construction and major renovations: Acton, Aquinnah, Arlington, Brookline, Cambridge, Concord, Lexington, Lincoln, Newton, plus Northampton as a substitute selection.
Coming next
- 2024 IECCPartialNo date yetIn development780 CMR Chapter 11R (11th Edition, in drafting)
The BBRS 11th Edition Energy Advisory Subcommittee (Dec 3, 2025) discussed the 2024 IECC with DOER amendments and noted the 2027 IECC may be published before adoption takes effect; no adoption or effective date was found. DOER also proposed 2026 revisions to the 2021-based Stretch and Specialized codes.
How Massachusetts adopts the IECC residential
The BBRS adopts the energy chapters of 780 CMR (11R and 13) by regulation in consultation with DOER; G.L. c. 143, s. 94(o) requires it to adopt and fully integrate the latest IECC and to update within 1 year of any IECC revision. DOER separately promulgates the opt-in Stretch and Specialized codes (225 CMR 22.00 and 23.00; G.L. c. 25A, s. 6(14), as amended by St. 2021, c. 8), which municipalities adopt by local vote. No legislative approval of the rules is required; pending bill H.5175 would rewrite the s. 6(14) clause.
Cycle. Tied to 780 CMR editions: the base code moved to the 2021 IECC with the 10th Edition (Oct 11, 2024); a 2024 IECC update is in 11th Edition drafting. Stretch and Specialized codes were last updated in February 2025, with 2026 revisions proposed.
Laws, rulings, and other actions
- LegislationH.5175, An Act relative to energy affordability, clean power and economic competitiveness194th General Court, 2025-2026
Omnibus energy bill whose Section 5 rewrites G.L. c. 25A, s. 6, cl. 14 (DOER’s municipal opt-in specialized stretch energy code).
Pending (in conference committee as of Jul 16, 2026)
malegislature.gov (opens in a new tab) - Other actionDOER proposed revisions to the Stretch and Specialized energy codes
DOER held a public hearing on Jun 16, 2026 (comments to Jun 24, 2026) on proposed revisions to the opt-in Stretch and Specialized codes; BBRS minutes of Feb 10, 2026, mention a new six-month concurrency period.
- Other actionBBRS extension of the 9th/10th Edition concurrency period
After a BBRS hearing on Dec 2, 2024, the concurrency period originally set to end Jan 1, 2025, was extended to Jun 30, 2025 (announced Dec 5, 2024); only the 10th Edition applies after that.
- LegislationSt. 2022, c. 179, An Act Driving Clean Energy and Offshore Wind (s. 84)
Section 84 lets not more than ten cities and towns adopt local restrictions on fossil fuels in new construction and major renovations under DOER’s demonstration program (225 CMR 24.00).
Enacted Aug 11, 2022 (date from the legislature page metadata, not labeled as an approval date)
malegislature.gov (opens in a new tab) - LegislationSt. 2021, c. 8, An Act Creating a Next-Generation Roadmap for Massachusetts Climate Policy
Directs DOER, with the BBRS, to develop a municipal opt-in specialized stretch energy code (G.L. c. 25A, s. 6(14)), adds it to the specialized codes in G.L. c. 143, s. 96, enlarges the BBRS from 11 to 15 members and changes a timing phrase in s. 97 to 45 days.
Enacted Mar 26, 2021 (date from the legislature page metadata)
malegislature.gov (opens in a new tab) - UndatedLegislationG.L. c. 143, s. 94(o) (energy provisions of the state building code); DOER attributes the requirement to the Green Communities Act of 2008 (St. 2008, c. 169)
Requires the BBRS to adopt and fully integrate the latest IECC into the state building code and to update the energy provisions within 1 year of any IECC revision.
Enacted 2008, per DOER’s description
malegislature.gov (opens in a new tab)
How it was checked
Verified
Two separate readings of the state’s own record agree, and the passage is on file word for word.
Read twice: a second, blind reading of the state’s record agreed with the first on .
The state’s record was last read on , from four source pages.
Evidence 5 sources
Sources for the record itself come first, the state’s own records ahead of others. A label marks a source about something else, such as an exception. A source marked secondary is not the state’s own record.
“The Base Code is IECC 2021 with MA amendments: 780 CMR Chapter 11R (residential) and 780 CMR Chapter 13 (commercial).”
Massachusetts Building Energy CodesCommonwealth of Massachusetts (Mass.gov), Department of Energy Resourcesmass.gov (opens in a new tab)Agency pageRetrieved “The tenth edition building code became first effective on October 11, 2024”
“The tenth edition code is based on modified versions of the following 2021 International Codes (I-Codes)”
Tenth edition of the MA State Building Code 780Commonwealth of Massachusetts (Mass.gov), Board of Building Regulations and Standardsmass.gov (opens in a new tab)Agency pageRetrieved About an exception
“develop and promulgate, in consultation with the state board of building regulations and standards”
“a municipal opt-in specialized stretch energy code”
General Law - Part I, Title II, Chapter 25A, Section 6Massachusetts General Court (malegislature.gov)malegislature.gov (opens in a new tab)StatuteRetrieved About an exception
“The opt-in Stretch Code is IECC 2021 with key MA amendments: 225 CMR Chapter 22 (residential) and 225 CMR Chapter 23 (commercial).”
Massachusetts Building Energy CodesCommonwealth of Massachusetts (Mass.gov), Department of Energy Resourcesmass.gov (opens in a new tab)Agency pageRetrieved About an exception
“not more than ten cities and towns may adopt and amend general or zoning ordinances or by-laws”
Municipal Fossil Fuel Free Building Demonstration ProjectCommonwealth of Massachusetts (Mass.gov), Department of Energy Resourcesmass.gov (opens in a new tab)Agency pageRetrieved
Tracker cross-checks
Code adoption trackers are a cross-check. They are not Massachusetts’s own record.
DOE’s energycodes.govCross-checkAgrees with the record
Residential: 2021 IECC, effective 10/11/2024, mandatory statewide, state amendments yes
Related pages
- See Massachusetts’s IECC residential on the map
- IECC residential adoption in every state
- All six codes in Massachusetts