International Energy Conservation Code, commercial
Maryland enforces the 2021 IECC commercial
The 2021 International Energy Conservation Code (IECC) for commercial buildings has been in force in Maryland since May 29, 2023. It applies statewide. Adopted by Maryland Department of Labor, Division of Labor and Industry, Building Codes Administration. The legal citation is COMAR 09.12.51.02, .04; Public Safety Article 12-503.
Record of adoption
Edition in force
2021 IECC
Maryland Building Performance Standards
Verified
- In force since
- Legal citation
- COMAR 09.12.51.02, .04; Public Safety Article 12-503
- Adopted by
- Maryland Department of Labor, Division of Labor and Industry, Building Codes Administration
- Second reading
- Applies
- Statewide
- Also called
- MBPS, COMAR 09.12.51.04D
Same 2021 IECC adoption as residential. DOE lists ASHRAE 90.1-2019 alongside.
Coming next
- 2024 IECCPartialNo date yetProposedCOMAR 09.12.50, 09.12.51 (proposed)
Same proposal as residential; no final adoption found.
How Maryland adopts the IECC commercial
Same as residential energy: Labor adopts by regulation within 18 months of a new IECC and locals implement within 12 months.
Cycle. statutory 18-month target after each ICC edition
Laws, rulings, and other actions
- LegislationHB 870, Large Buildings for Tomorrow Act, Chapter 4122026 regular session
Enacted title requires counties and municipalities to notify the Department of the Environment of new-building permit applications of 35,000 sq ft or more; the first-reader text also had Labor adopt energy requirements by Oct 1, 2028.
Enacted May 12, 2026, effective Oct 1, 2026
mgaleg.maryland.gov (opens in a new tab) - UndatedLegislationHB 212, Fossil Fuel Use and Electric-Ready Standards2025 regular session
Would have required Labor to adopt, as part of the MBPS, a no-fossil-fuel and electric-ready requirement for new buildings.
Not enacted (last recorded action: House committee hearing)
mgaleg.maryland.gov (opens in a new tab) - UndatedLegislationHB 210, Fossil Fuel Use and Electric-Ready Standards2024 regular session
Earlier version of the same proposal, with a January 1, 2025 deadline for Labor.
Not enacted (last recorded action: House committee hearing)
mgaleg.maryland.gov (opens in a new tab) - UndatedLegislationPublic Safety Article 12-50318-month adoption rule, HB 57, 2016 regular session first-reader text moved 12 to 18 months
Requires Labor to adopt the MBPS by regulation and each later version within 18 months after issue, and bars energy requirements less stringent than the IECC.
In force (current statute text)
mgaleg.maryland.gov (opens in a new tab)
How it was checked
Verified
Two separate readings of the state’s own record agree, and the passage is on file word for word.
Read twice: a second, blind reading of the state’s record agreed with the first on .
The state’s record was last read on , from four source pages.
Evidence 3 sources
Sources for the record itself come first, the state’s own records ahead of others. A label marks a source about something else, such as an exception. A source marked secondary is not the state’s own record.
“as may be modified by the Department”
Maryland Building Performance Standards, COMAR 09.12.51Maryland Department of Laborlabor.md.gov (opens in a new tab)Administrative codeRetrieved “2021 IECC (MBPS)”
Current Adopted Building-Related Codes in the State of Maryland (3/18/2026)Maryland Department of Labor, Building Codes Administrationlabor.maryland.gov (opens in a new tab)Agency pageRetrieved About how the state adopts codes
“to adopt the most recent version of the IECC within 18 months of the ICC’s release of a new code”
Building Codes (IECC Information Page)Maryland Energy Administrationenergy.maryland.gov (opens in a new tab)Agency pageRetrieved
Tracker cross-checks
Code adoption trackers are a cross-check. They are not Maryland’s own record.
About a tracker cross-check
Maryland state code statusCross-checkUS DOE Building Energy Codes Programenergycodes.gov (opens in a new tab)Tracker, secondaryRetrieved
DOE’s energycodes.govCross-checkAgrees with the record
Current State Code: 2021 IECC and ASHRAE 90.1-2019; Effective Date 05/29/2023; no pending code listed
BCAP’s code status pageCross-checkDoes not agree with the record
Maryland Building Performance Standards based on the 2018 IECC, effective 3/1/2022
Related pages
- See Maryland’s IECC commercial on the map
- IECC commercial adoption in every state
- All six codes in Maryland