Which codes apply? In Washington, solar PV systems fall under the 2023 NEC, the 2021 IRC, the 2021 IBC, and the 2021 IFC.
Codes that reach solar PV systems
The edition Washington enforces for each code that governs the product, and the part of the code that does.
-
NECNational Electrical CodeThe Washington NEC record2023 NECVerified
in force since Apr 1, 2024
Where it reaches the product. Article 690, solar photovoltaic systems, with 705 for the interconnection and 690.12 for rapid shutdown.
Electrical safety standards, administration, and installation (chapter 296-46B WAC), adopting NFPA 70-2023 · WAC 296-46B-010; chapter 19.28 RCW
The 2026 NEC is adopted, not yet in force for December 31, 2026.
-
IRCInternational Residential CodeThe Washington IRC record2021 IRCVerified
in force since Mar 15, 2024
Where it reaches the product. Section R324, solar energy systems.
State Building Code Adoption and Amendment of the 2021 Edition of the International Residential Code (chapter 51-51 WAC) · WAC 51-51-003; WAC 51-51-008; chapter 19.27 RCW
The 2024 IRC is proposed for May 3, 2027.
-
IBCInternational Building CodeThe Washington IBC record2021 IBCVerified
in force since Mar 15, 2024
Where it reaches the product. Rooftop structures and the structural load of the array.
State Building Code Adoption and Amendment of the 2021 Edition of the International Building Code (chapter 51-50 WAC) · WAC 51-50-003; WAC 51-50-008; chapter 19.27 RCW
The 2024 IBC is proposed for May 3, 2027.
-
IFCInternational Fire CodeThe Washington IFC record2021 IFCVerified
in force since Mar 15, 2024
Where it reaches the product. Chapter 12, section 1205, solar photovoltaic power systems and roof access.
State Building Code Adoption and Amendment of the 2021 Edition of the International Fire Code (chapter 51-54A WAC) · WAC 51-54A-003; chapter 19.27 RCW
The 2024 IFC is proposed for May 3, 2027.
Washington laws that name solar PV systems
On the site: four laws, rules, orders, and bills, newest first.
| Law or rule | Kind | Stage | Date | What it does |
|---|---|---|---|---|
| E3SHB 1960 | Bill | PartialEnacted, not yet in force | Jan 1, 2028 | Replaces property tax on solar, wind, and battery storage facilities of 10 MW or more with state and local excise taxes from 2028. Funds local investment distributions and requires a model siting ordinance; counties seeking those funds may not adopt stricter siting standards. Source (opens in a new tab) |
| ESSB 5445 | Bill | PartialIn force | Jul 27, 2025 | Lets small solar arrays under 1,000 square feet, parking-lot solar canopies, and landfill solar skip state environmental review. Source (opens in a new tab) |
| Chapter 19.95 RCW | Statute | PartialIn force | Jun 6, 2024 | Requires licensed contractors and detailed written contracts for solar installations over $1,000, including costs, production estimates, and battery component details. Source (opens in a new tab) |
| Chapter 80.50 RCW | Statute | PartialIn force | – | Allows stand-alone battery storage facilities to seek state site certification, which is optional. Source (opens in a new tab) |