Codes of Record

What applies to my job?

Pick the state and the product you build, install, or inspect. The card below answers from each state’s own record.

Interconnection devices in North Dakota

Which codes apply? In North Dakota, interconnection devices fall under the 2026 NEC and the 2024 IRC (local option).

Backup switches, gateways, meter adapters, and the device that islands a home. State record read Oct 20, 2026. Data as of Oct 26, 2026.

Codes that reach interconnection devices

The edition North Dakota enforces for each code that governs the product, and the part of the code that does.

  1. NECNational Electrical Code
    2026 NECVerified

    in force since Jul 1, 2026

    Where it reaches the product. Article 705 for the point of connection, 230 for the service, and 702 for optional standby systems.

    NFPA 70 2026 edition National Electrical Code (State Electrical Board Electrical Wiring Standards) · N.D. Admin. Code art. 24.1-02 (e.g. 24.1-02-01-02) and art. 24.1-06; authority N.D.C.C. 43-09-05

    The North Dakota NEC record
  2. IRCInternational Residential Code
    2024 IRCVerified

    in force since Jan 1, 2026 · Local adoption

    Where it reaches the product. Chapter 37 and the electrical provisions that mirror the NEC.

    North Dakota State Building Code · N.D.C.C. ch. 54-21.3; N.D. Admin. Code ch. 108-01-01

    The North Dakota IRC record

North Dakota laws that name interconnection devices

Statutes, rules, and commission orders are tracked state by state.

No North Dakota law or rule on the site names interconnection devices. The product page shows the states that have one.

For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use