Which codes apply? In Georgia, inverters and power control systems fall under the 2023 NEC (statewide minimum) and the 2015 residential IECC (statewide minimum).

The inverter, the power control system, and the interconnection to the grid. State record read Oct 19, 2026. Data as of Oct 26, 2026.

Codes that reach inverters and power control systems

The edition Georgia enforces for each code that governs the product, and the part of the code that does.

  1. NECNational Electrical Code
    2023 NECVerified

    in force since Jan 1, 2025 · Statewide minimum

    Where it reaches the product. Article 705, interconnected power sources, with 690 and 706 for the source and the listing the inverter must carry.

    Georgia State Minimum Standard Electrical Code (NEC 2023 with Georgia Amendments) · Ga. Comp. R. & Regs. 110-11-1-.31; O.C.G.A. 8-2-23

    The Georgia NEC record
  2. IECC residentialInternational Energy Conservation Code, residential
    2015 IECCPartial

    in force since Jan 1, 2020 · Statewide minimum

    Where it reaches the product. Where a state adopts the solar-ready or storage-ready appendix, the space and the conduit the inverter needs.

    Georgia State Minimum Standard Energy Code (IECC with Georgia State Supplements and Amendments) · Ga. Comp. R. & Regs. 110-11-1-.34; O.C.G.A. 8-2-23(a)(2)

    The 2024 IECC is in development.

    The Georgia IECC residential record

Georgia laws that name inverters and power control systems

Statutes, rules, and commission orders are tracked state by state.

No Georgia law or rule on the site names inverters and power control systems. The product page shows the states that have one.

For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use