WAC 296-46B-705
Partial
What does Washington WAC 296-46B-705 do? Requires anyone connecting a power source to the grid to consult the serving utility and meet its standards. Sets wiring and disconnect rules for supply-side connections and requires design review for interconnected systems, including storage.
Facts
- Kind
- Code amendment
- Status
- In force
- Stage
- In force
- Signed or decided
- April 1, 2024
- Effective
- April 1, 2024
- Topics
- Permitting, Interconnection
- Products
- Source
- Washington State Legislature (opens in a new tab)
The state’s codes
The codes that reach each product this law names, with the edition Washington is on. Each links to the record.
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use