Chapter 80.60 RCW
Partial
What does Washington Chapter 80.60 RCW do? Requires utilities to offer net metering for systems up to 100 kW until the earlier of Jun 30, 2029, or a 4 percent cap. Allows successor tariffs afterward, keeps credits for earlier customers, and bars utilities from restricting on-site storage.
Facts
- Kind
- Statute
- Status
- In force
- Stage
- In force
- Topics
- Interconnection, Tariffs and bill credits
- Products
- Source
- Washington State Legislature (opens in a new tab)
The state’s codes
The codes that reach each product this law names, with the edition Washington is on. Each links to the record.
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use