What does Oregon 2026 Oregon Electrical Specialty Code do? Adopts the 2026 National Electrical Code with Oregon amendments from Oct 1, 2026. Adding solar to a building with an existing system requires rapid shutdown for the existing system too. Oregon does not adopt NEC Section 706.7 on storage commissioning.
Facts
- Kind
- Code amendment
- Status
- In force
- Stage
- In force
- Signed or decided
- October 1, 2026
- Effective
- October 1, 2026
- Topics
- Fire protection and siting, Permitting, Interconnection
- Products
- Source
- Oregon Building Codes Division (opens in a new tab)
- Citation
- 2026 Oregon Electrical Specialty Code, Table 1-E
The state’s codes
The codes that reach each product this law names, with the edition Oregon is on. Each links to the record.
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use