Codes of Record

New York

S 801 (2025); Energy Law 11-104(9) EV-ready building standards

VerifiedMatched to the state’s own source on the date it was read. Two separate readings agree, and the passage is on file word for word.

What does New York S 801 (2025); Energy Law 11-104(9) EV-ready building standards do? After Dec. 31, 2026, new buildings with off-street parking need EV-ready and installed charging spaces under code council specs. new construction.

Facts

Kind
Bill
Status
In force
Stage
In force
Topics
EV-ready buildings
Products
Source
nysenate.gov (opens in a new tab)

The state’s codes

The codes that reach each product this law names, with the edition New York is on. Each links to the record.

For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use