HB 830 (2023) Residential Construction or Significant Renovation - EV Charging; Public Safety 12-205
Partial
What does Maryland HB 830 (2023) Residential Construction or Significant Renovation - EV Charging; Public Safety 12-205 do? New homes with garage, carport or driveway need a Level 2 charger, EV-ready or EV-capable space; multifamily common lots need a charger plus EV-capable percentages rising over time. residential new construction and multifamily.
Facts
- Kind
- Statute
- Status
- In force
- Stage
- In force
- Effective
- October 1, 2023
- Topics
- EV-ready buildings
- Products
- Source
- mgaleg.maryland.gov (opens in a new tab)
The state’s codes
The codes that reach each product this law names, with the edition Maryland is on. Each links to the record.
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use