Codes of Record

Idaho

HB 86 (2025), Idaho Code 39-4109B (preempts local EV infrastructure mandates)

Lead onlyFound in a tracker or press source. Nobody has checked it against the state’s own record yet.

What does Idaho HB 86 (2025), Idaho Code 39-4109B (preempts local EV infrastructure mandates) do? Cities and counties may not require EV charging equipment, reserved EV spaces or upgraded conduit in new buildings; existing local requirements are preempted. residential, commercial.

Facts

Kind
Statute
Status
Enacted
Stage
In force
Signed or decided
March 11, 2025
Topics
EV-ready buildings
Products
Source
afdc.energy.gov (opens in a new tab)

The state’s codes

The codes that reach each product this law names, with the edition Idaho is on. Each links to the record.

For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use