D.C. Code 6-1451.03a to 03b, CB 25-262 (EV-ready new construction)
Lead only
What does District of Columbia D.C. Code 6-1451.03a to 03b, CB 25-262 (EV-ready new construction) do? New single-family with off-street parking needs one Level 1 EV-ready space; commercial and multifamily with 6+ spaces from 2027-01-01: commercial 15 percent installed and 25 percent ready, multifamily 25 percent ready; more multifamily steps 2031 and 2034. residential, multifamily, commercial.
Facts
- Kind
- Statute
- Status
- Enacted
- Stage
- Not yet in force
- Signed or decided
- November 22, 2024
- Effective
- January 1, 2027
- Topics
- EV-ready buildings
- Products
- Source
- afdc.energy.gov (opens in a new tab)
The state’s codes
The codes that reach each product this law names, with the edition District of Columbia is on. Each links to the record.
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use