D.C. Code 6-1451.03a (older 20 percent EV-ready standard)
Lead only
What does District of Columbia D.C. Code 6-1451.03a (older 20 percent EV-ready standard) do? New construction and renovation of commercial and multi-unit buildings with 3+ off-street spaces must reserve 20 percent for charging-ready infrastructure; Mayor sets specs. multifamily, commercial.
Facts
- Kind
- Statute
- Status
- In force
- Stage
- In force
- Topics
- EV-ready buildings
- Products
- Source
- afdc.energy.gov (opens in a new tab)
The state’s codes
The codes that reach each product this law names, with the edition District of Columbia is on. Each links to the record.
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use