Codes of Record

Delaware

Title 16 Ch. 80 (EV-capable and EV-installed new construction, SB 103)

Lead onlyFound in a tracker or press source. Nobody has checked it against the state’s own record yet.

What does Delaware Title 16 Ch. 80 (EV-capable and EV-installed new construction, SB 103) do? New single-family homes need one EV-capable space from 2024-01-01; new multifamily from 2025-01-01 need chargers on 5 percent of spaces and 10 percent EV-capable. residential, multifamily.

Facts

Kind
Statute
Status
In force
Stage
In force
Signed or decided
August 3, 2023
Effective
January 1, 2024
Topics
EV-ready buildings
Products
Source
afdc.energy.gov (opens in a new tab)

The state’s codes

The codes that reach each product this law names, with the edition Delaware is on. Each links to the record.

For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use