Codes of Record

Connecticut

C.G.S. 4b-77 (EV charger building standards)

Lead onlyFound in a tracker or press source. Nobody has checked it against the state’s own record yet.

What does Connecticut C.G.S. 4b-77 (EV charger building standards) do? New state buildings over $100,000 need Level 2 at 20 percent of spaces; new commercial and multi-unit residential with 30+ spaces must support Level 2 or DC fast at 10 percent of spaces. commercial, multifamily, state buildings.

Facts

Kind
Statute
Status
In force
Stage
In force
Signed or decided
May 10, 2022
Effective
January 1, 2023
Topics
EV-ready buildings
Products
Source
afdc.energy.gov (opens in a new tab)

The state’s codes

The codes that reach each product this law names, with the edition Connecticut is on. Each links to the record.

For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use