C.G.S. 4b-77 (EV charger building standards)
Lead only
What does Connecticut C.G.S. 4b-77 (EV charger building standards) do? New state buildings over $100,000 need Level 2 at 20 percent of spaces; new commercial and multi-unit residential with 30+ spaces must support Level 2 or DC fast at 10 percent of spaces. commercial, multifamily, state buildings.
Facts
- Kind
- Statute
- Status
- In force
- Stage
- In force
- Signed or decided
- May 10, 2022
- Effective
- January 1, 2023
- Topics
- EV-ready buildings
- Products
- Source
- afdc.energy.gov (opens in a new tab)
The state’s codes
The codes that reach each product this law names, with the edition Connecticut is on. Each links to the record.
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use