SMUD Engineering Specification T014
Partial
What does California SMUD Engineering Specification T014 do? Allows only utility-approved meter socket adapters, on single-meter residential services of 200 amps or less, with exports capped at 20 kW. Requires a production meter for all distributed generation and sets approved solar and battery connection options.
Facts
- Kind
- Rule
- Status
- In force
- Stage
- In force
- Signed or decided
- February 19, 2026
- Topics
- Interconnection, Meter socket adapters
- Products
- Source
- Sacramento Municipal Utility District (opens in a new tab)
- Citation
- SMUD Engineering Specification T014, Revision 7, dated Feb 19, 2026
The state’s codes
The codes that reach each product this law names, with the edition California is on. Each links to the record.
For information only. Your local building or fire official decides which code applies. We check state records often but can miss a recent change, so confirm with your official before you design, permit, or install. Terms of use